• Tower Crane TC5013B  type Chinese Supplier System 1
  • Tower Crane TC5013B  type Chinese Supplier System 2
  • Tower Crane TC5013B  type Chinese Supplier System 3
  • Tower Crane TC5013B  type Chinese Supplier System 4
  • Tower Crane TC5013B  type Chinese Supplier System 5
  • Tower Crane TC5013B  type Chinese Supplier System 6
Tower Crane TC5013B  type Chinese Supplier

Tower Crane TC5013B type Chinese Supplier

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Quick Details


Feature: Tower Crane                          Condition: New                                           Max.Lifting Load: 6T

Span: 50m                                             Place of Origin: China(Mainland) 

Brand Name: CMAX                              Model Number: TC5013A         

 

Packaging & Delivery


Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Specifications

 

● Max. working range 50m, tip lifting weight 1.3T and Max. lifting weight 6T.


● Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.


● Trolleying mechanism can provide two operation speeds.


FAQ

 

Q: What is the difference between CNBM and CMAX?

A: CNBM stands for China National Building Materials (Group) Corporation, which is established in 1984, is the largest state-owned group corporation of building material & machinery with a total asset of 15 billion USD and a staff of 100000.

CMAX is the brand name of CNBM Group’s construction products, C stands for China and Max stands for Maximum.

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, CNBM could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



 

To Lead The Revoluation of International Trade

Q:I was told that this was taking place, so i would like to fax the info to the proper local
Is that a woof woof dog, or a dogman? A dogman is the person responsible for loading a crane. In days gone by, he often rode on the load while it was being hoisted. Maybe some still do?
Q:When making 1000 origami cranes, do all of them have to be the same size? I already made some of varying sizes. Does it matter? I hope not.Thank you.
i don't get it. who's going to furnish you a desire? The magic crane genie? Buddha? Why no longer attempt praying to God who might have the potential to help you, without going to each and all the artwork and giving your self paper cuts.
Q:Do large semi-submersible crane vessels such as the SSCV Thialf propel themselves to work sites or are they carried on heavy-lift ships. I understand they have propulsion systems but the just seem so bulky, inefficient, and slow to move across oceans on their own.
Very large capacity crane vessels have propulsion machinery for manoeuvring when on station. The most modern designs of semi-submersible vessel use them to achieve 'dynamic positioning'. Older designs used the propulsion systems to assist when deploying the anchors in the correct pattern. The vessels are towed by tugs when making deep sea passages. First generation crane vessels had much smaller lifting capacities and were either constructed on conventional hulls or were converted from existing ships. These types were capable of making ocean passages using their own propelling machinery.
Q:Like the tall cranes on construction sites. I mean, suddenly they're just magically there!
Yes I have. It's fascinating to watch.
Q:About tower crane torque limiter with 4 limit switches, each play a role, thank you
Hook top point control: when the hook to the high limit, limit action, do not continue to hook!Overload control: when the weight exceeds the overload point or amplitude exceeds the maximum amplitude or the loading rate is more than 105% when the output control, prohibit the hook lifting action and prohibit car distance to allow the car to increase the amplitude, amplitude can be damped near.
Q:what does a paper crane represent/symbolize?
A fun activity to do when you have nothing else to do!
Q:Hello,I live in the St. Louis area of Missouri and during the summer, Crane Flies (I call them Mosquito Eaters) fly around all the time at night. I believe that it is normal for this type of bug to be nocturnal, but lately, I've seen them flying around, jumping around, and getting in the house DURING THE DAYTIME!! (AHH!!) :0 Is there any explanation for this? If so, is there anyway to reduce their population in and around my house? Thanks for reading.Ty
Crane Fly larva are rat-tailed maggots that prefer stagnant, even polluted water. Check around your neighborhood to see if you have any stagnant pools (I've seen them in water-filled tree hollows, but this sounds like a more significant source) or polluted, but low-flowing, streams. If you find any, this might be a good opportunity to do a little environmental restoration.
Q:What is tower crane? What are the types and features?
[classification and characteristics]Tower crane is divided into two categories: upper slewing tower and lower slewing tower crane. Among them, the bearing capacity of the former is higher than that of the latter. In many construction sites, what we have seen is the tower crane with rotary top, top lift and knot joint.
Q:i have 5 tower cranes outside my window at different construction sites and they all position their cranes the same direction at the end of the day. is there a reason for this.
I can think of a few reasons. The first 2 are safety related, the 3rd is work-efficiency related. 1. To minimize wind loading for the expected wind-direction overnight. 2. To minimize damage to the surrounding area should a failure happen and a crane fall (similar to felling a tree in a forest so it falls in the direction the lumberjack wants it to fall). 3. To leave the boom over the worksite for the next morning's first pickup (so, it would be a coincidence that all the pickup sites were at the same angle relative to the booms). .
Q:the question is :Two cranes can unload a ship together in 15 hours. The faster crane takes 16 hours less than the slower crane, if each were to unload the same ship alone. How long doesi t take for each crane to unload this ship? I done most of the math but i am stuck with this last part .15+- radical 1185/2
No. of hours for the slower to unload alone—x: 1/x + 1/(x - 16) = 1/15 (x - 16 + x)/(x? - 16x) = 1/15 15(2x - 16) = x? - 16x 30x - 240 = x? - 16x x? - 46x = - 240 x? - 23x = - 240 + (- 23)? x? - 23x = - 240 + 529 (x - 23)? = 289 x - 23 = 17 x = 40 No. of hours for the faster to unload alone: = 40 - 16 = 24 Answer: slower crane, 40 hrs; faster crane, 24 hrs Check: = 15(1/40 + 1/24) = 15([3 + 5]/120) = 15(8/120) = 15(1/15) = 15/15 or 1

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords