Tower Crane TC5013B Middle East Market for Sale

Ref Price:
$20,000.00 - 80,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 6T Maximum Lifting Height(M): 141.5 Rated Loading Capacity: 1.3T
Span: 50M Rated Load Moment: 63T.M

Product Description:

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC5013B(QTZ63) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.

 

Specification of Tower Crane

 

Technical Sheet for TC5013B

 

Free standing height (m)

41.5

Max height with attachment (m)

141.5

Working range can be adjustedm

4450

Min working rangem

2.5

Max lifting capacityt

6

Tip load @ 50mt

1.3

Hoist mechanism

Falls

2

4

Lifting capacityt

1.5-3

3-6

Speedm/min

0-80

0-40

Motor

YZRDWF225M-4/8-24/24KW

Trolleying mechanism

Speedm/min

12/27/53

Motor

YZTDE132L-4/8/16-3.3/2.2/1.1KW

Slewing mechanism

Speedr/min

0-0.6

Motor

YZR132M2-6-3.7KW×2

Climbing speedm/min

0.58

Counterweightt

44m jib length

50m jib length

12

13.05

Mast section sizeL×W×Hm

1.6×1.6×2.5m ( seamless tube type )

Working temperature

-40+60

Total power (KW)

37

Power supply requirement (KVA)

170KVA for generator

Cable type ( within 40 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V       170A

Rated working voltage & current

380V                   108A

 

Loading diagram

 

50m jib length

R

2.5-15.5

17

20

23

26

28.1

29

35

41

44

50

a=2(t)

3.00

2.91

2.32

1.90

1.73

1.33

a=4(t)

6.00

5.40

4.48

3.80

3.29

2.99

2.88

2.29

1.87

1.70

1.30

 

44m jib length

R

2.5-15.7

17

20

23

26

28.7

29

32

35

38

44

a=2(t)

3.00

2.97

2.63

2.36

2.13

1.73

a=4(t)

6.00

5.49

4.56

3.87

3.35

2.97

2.94

2.60

2.33

2.10

1.70

 

Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane TC5013B Middle East Market for Sale

Tower Crane TC5013B Middle East Market for Sale

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to change the mechanical property unit of crane (tower crane)?
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:Why do tower cranes need to be fabricated?
The crane wire rope commonly used varieties of phosphating coating steel wire rope, galvanized steel wire, stainless steel wire rope, the use of atmospheric environment, patented technology to produce manganese phosphating coating of steel wire rope has the longest lifespan, heavy corrosion environment optimization of hot galvanized wire rope double - phosphating coating.Phosphating coating of steel wire rope production technology patent, give priority to the use of manganese or zinc manganese phosphating, and smooth steel wire rope production process comparison, just add the last bonderizing process, steel wire for rope wear resistance and corrosion resistance is greatly improved, the use of direct phosphating steel wire twisting steel wire rope.
Q:Notice of tower crane
Please refer to the technical regulations for the safety of installation, disassembly and use of tower cranes in construction;The following is copy:3 installation of tower cranes3.1 conditions for installation of tower cranes3.1.1 tower crane installation unit must have the construction administrative departments issued the contracted professional qualification and heavy equipment installation engineering construction enterprises safety production license. Tower crane installation units must be engaged in the installation of tower cranes within the scope of qualification permit.In addition to the professional and technical personnel who have the qualification standard, the installation units of 3.1.2 tower cranes shall also have professional personnel who are in line with the project. The person in charge of the project, the project manager and the full-time safety management personnel shall have the certificate of safety production inspection. Tower cranes, installers, electricians, drivers, signal engineers, cable operators should have special construction operation qualification certificates.3.1.3 construction units shall sign professional contract for installation engineering with the installation units, and make clear the responsibility of both sides for safety in production. In case of general contracting of construction, it shall be signed by the general contractor and the installation unit.
Q:Construction tower crane driver (T) Ben can be used as construction crane driver (S)?
Building crane driver (T); tower crane driverConstruction crane drivers (S); construction elevator drivers; neither is common.
Q:Tower crane 5610 why is it called QTZ63?
Strictly speaking, 5610 should be called TC5610;At present in the domestic type mark in two ways: one is QTZ++, one is TC++, for example, such as QTZ80, Q is the first letter of Chinese "play", T is the first letter of Chinese "tower", Z is the Chinese "from" the first letter is self lifting tower crane 80, the unit is 80 tons of tons of rice, rice is a concept called lifting torque, rated torque, maximum rated product weight and maximum range; as in the 13.4 meters lift 6 tons, the product is 80 tons of rice;Such as: TC6010, T is the English TOWER, C English CRANE, TC tower crane is English shorthand, the 60 refers to the jib 60 meters long, 10 refers to the boom in the front 60 meters lift 1 tons, and TC5513 refers to the boom length of 55 meters, the front suspension of 1.3 tons. TC tagging is an international universal annotation. Domestic commonly used models areQTZ series: 40, 63, 80, 100, 125, 160,200, 250, 315
Q:How to choose tower crane in engineering, such as arm length and lifting weight?
First of all, your engineering structure is reinforced concrete Or steel? What's the weight of the lift? The lifting capacity of tower cranes should meet the needs. Generally speaking, steel structure hoisting, tower crane of the largest lifting weight and gravity moment should be large; hanging steel reinforcement of a smaller can.Secondly, the boom length should be covering the scope of construction (can also be arranged to meet several sets of crane lifting coverage). But in the 360 level luffing jib range, can not have obstacles (other cranes and buildings), and the boom and the distance between them (below) should be not less than 2m.Third, in the construction project is relatively high, the site is relatively small, you can mount the internal climbing tower crane. Building covers a large area, sometimes one can solve the problem. Of course, it is more troublesome to disassemble and lift inside, but the standard section used is less and the cost can be lower.
Q:What is an attached tower crane?
Its weight is 5 ~ 100kN, lifting radius of 3 ~ 35m (trolley), the lifting height is 160m, the maximum lifting torque of 1600kN - m, each with high 2.5m, the QT4 - 10 type crane lifting system comprises a lifting sleeve frame, long stroke hydraulic jack, bearing seat, lifting beam and a positioning pin. The cylinder block of the hydraulic jack is installed on the support seat at the bottom of the tower, and the lifting process can be divided into five steps.
Q:Does tower crane belong to special equipment?
Tower crane is a high-altitude operation, the type of work belongs to special types of work, equipment belongs to special equipment.
Q:What is the function of the balance valve in the hydraulic jacking system of tower crane?
The function of the balance valve is to maintain the balance of the oil pressure, the hydraulic oil delivery flow is stable, so that the tower crane jacket and the upper part of the lift, disassembly, standard time, lift and smooth.
Q:When building tall buildings, where is the bottom of the tower crane installed?
It's just a little bit needed, and you're right!! As long as the requirements to ensure verticality, no problemBuilding technical requirements, such as Perpendicularity Error of not more than 3 millimeters per 100 meters, can be guaranteed by the building.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range