Tower Crane TC5013B Intergrated Mast Section

Ref Price:
$10,000.00 - 50,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 6T Maximum Lifting Height(M): 121M Rated Loading Capacity: 1.3T
Span: 50M Rated Load Moment: 63T.M

Product Description:

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC5013B(QTZ63) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 

Technical Sheet for TC5013B

 

Free standing height (m)

41.5

Max height with attachment (m)

141.5

Working range can be adjustedm

4450

Min working rangem

2.5

Max lifting capacityt

6

Tip load @ 50mt

1.3

Hoist mechanism

Falls

2

4

Lifting capacityt

1.5-3

3-6

Speedm/min

0-80

0-40

Motor

YZRDWF225M-4/8-24/24KW

Trolleying mechanism

Speedm/min

12/27/53

Motor

YZTDE132L-4/8/16-3.3/2.2/1.1KW

Slewing mechanism

Speedr/min

0-0.6

Motor

YZR132M2-6-3.7KW×2

Climbing speedm/min

0.58

Counterweightt

44m jib length

50m jib length

12

13.05

Mast section sizeL×W×Hm

1.6×1.6×2.5m ( seamless tube type )

Working temperature

-40+60

Total power (KW)

37

Power supply requirement (KVA)

170KVA for generator

Cable type ( within 40 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V       170A

Rated working voltage & current

380V                   108A

 

Loading diagram

 

50m jib length

R

2.5-15.5

17

20

23

26

28.1

29

35

41

44

50

a=2(t)

3.00

2.91

2.32

1.90

1.73

1.33

a=4(t)

6.00

5.40

4.48

3.80

3.29

2.99

2.88

2.29

1.87

1.70

1.30

 

44m jib length

R

2.5-15.7

17

20

23

26

28.7

29

32

35

38

44

a=2(t)

3.00

2.97

2.63

2.36

2.13

1.73

a=4(t)

6.00

5.49

4.56

3.87

3.35

2.97

2.94

2.60

2.33

2.10

1.70

 

Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane TC5013B Middle East Market for Sale

Tower Crane TC5013B Middle East Market for Sale

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Ask about the lift and transportation of the jack up tower crane
According to the requirements of the 2.0.3 specification: tower crane tower crane installation and disassembly operation should be equipped with the following: 1, hold a qualified safety assessment certificate of the project and responsible for the safety of people and machinery management personnel; 2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
Q:How many stops are there in a tower crane? Where are they located in the tower cranes?
The hook has an upper limit on the windlassThe car has front and rear spacing on the trolley hoistSlewing is limited to the slewing gearAnd the torque limit is on the spireWeight limit
Q:Why do tower cranes need to be fabricated?
The fatigue test data show that the fatigue life of the phosphating coating of steel wire rope is about 3-4 times the same structure light steel wire rope (laboratory comparable conditions) with the research on the wear resistance of phosphating, and greatly enhance the possibility of. Manganese phosphating is bonderizing, can solve the wear problems of wire rope used in the process, according to the current market situation of wire rope, manganese phosphating coating of steel wire rope price is higher than that of plain steel wire rope, and prolonging the service life of much higher than the rate of price increase, so the phosphating coating steel wire rope daily use fee is only plain steel wire 30-45% rope, the use of lower cost, higher cost, smooth steel wire rope is eliminated. For reference only
Q:Tower crane, this model inside each letter number represents what meaning, ask the great God to inform.TCT7527-20, TC6015A-10E
Two, weight: rated lifting weight and maximum weight. The maximum rated lifting weight refers to the biggest boom in quality to allow the minimum amplitude of the tower crane, is one of the main technical parameters of the tower crane. Three, lifting...
Q:What is the power of a tower crane? Five
TC7525-16D switchboard power 80KWTC5610-4 switchboard power 34KW.TC6015A-10E switchboard power 71.5KWThe other two types have not been touched and will not be answered. I'm sorry
Q:What are the four major moving mechanisms of a tower crane?
Four big bodies of tower crane: lifting, slewing, luffing and walking.
Q:Tower crane and tower crane 5
Vertical transportation can be done with elevators, construction lifts, and Longmen racksTower cranes and tower cranes are one thing
Q:Tower crane 5610 why is it called QTZ63?
Q is reusable, T is tower, Z is jack up, and combined is jack up tower crane. (this is the earliest known China, now the various manufacturers have their own name, some close to the French take, such as F0/23B, the tower jib 50 meters, a maximum weight of 10 tons, 2.3 tons of weight lifting arm tip)80 is the moment, the unit is t * m, (should say is the force multiplied by distance, 800kn.m) for 5613 cranes, the maximum lifting capacity of 8 tons, the boom length is 56 meters, arm tip lifting weight 1.3 tons, maximum weight in the range of 2.5 meters ---13 meters, calculation of 8 * 13=104, so the name is QTZ104, now the provisions should be a QTZ104, but before, people think is 8 tons of weight, so called QTZ80, is now available.
Q:Minimum QTZ63 tower crane special electric box open for many A
QTZ63 tower crane with air and leakage protection:Minimum three-phase air switch not less than 100A; at the same time leakage protector is not less than 100A three-phase four wire system leakage protection.Maximum three-phase air switch not greater than 150A; at the same time, leakage protector is not more than 150A of three-phase four wire system leakage protection.
Q:What windproof devices should be set up for crane work?
4. windproof anti-skid safety deviceThe utility model is a safety device for preventing the crane of the open-air work from sliding along the track under the action of strong wind, and the outdoor working track type crane shall be installed. The safety function of the utility model is that when the crane encounters the maximum wind force in the non working state, the crane is not blown to prevent the crane from overturning at the end of the rail. Common windproof devices include rail clamps, anchoring devices, and iron shoes.(1) rail clamping device: it is widely used in all kinds of outdoor track crane, its working principle is to use the two sides of a clamp rail head, the crane is fixed on the track through the combination of the clamping force, the crane can not slip. The design requirements of rail clamp, clamping force of rail clamp must be greater than the crane sliding force, to ensure that the local maximum wind, crane stays closed; rail tongs should rely on device components own weight or spring, and should not only rely on the driving effect of the power of the driving device, to to prevent the power supply is interrupted, the rail clamping device does not work; power driven rail clamping action should be behind the operation mechanism of brake action violently to eliminate possible crane brake.(2) anchor device: it uses a bolt or a flashboard device, a chain or a top pole to connect the crane and the track foundation into one body, and is used for fixing the crane in the big storm when not working. Since the anchor device can only be located in a certain position of the track, the crane can be anchored to this position, which is not suitable for immediate weather protection in an emergency.(3) iron shoes: it is a wedge device, when used, the wedge-shaped tongue inserted between the wheel tread and rail top surface, the iron shoes of the slope constitute the resistance to sliding wheels.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range