Tower Crane TC5013B from China with high quality

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Quick Details

Feature: Tower Crane                          Condition: New                                           Max.Lifting Load: 6T

Span: 50m                                             Place of Origin: Human China(Mainland) 

Brand Name: CMAX                              Model Number: TC5013B      

 

Packaging & Delivery

Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Specifications

● Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability,

● Reduce future maintenance cost.

● Max.working range 50m, tip lifting weight 1.3T and Max.lifting weight 6T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.


 

To Lead The Revoluation of International Trade

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do you erect a crane. surely you would need a crane to make a crane.?
Yes you need a crane to erect a crane. A large mobile crane is required to erect a tower crane but the mobile crane is much more expensive so it saves money by only being on site for a few days to erect/dismantle the tower crane.
Q:how do they get cranes on top of building sites?
Good Freakin Question! With a bigger crane?
Q:What is the definition of lifting, slewing and luffing of tower cranes?
Rotary is cantilever tower crane tower crane rotary shaft winding;Is the hook shaft distance amplitude change;
Q:books about the physics of a tower crane?
Hi, Well, this is an interesting topic about physics and requires to have a basic knowledge, correct? So here we have some books: - Chopra, K. A. Dynamics of Structures: theory and applications to earthquake engineering. - Bostelman, R., et al. “Toward Next-generation Construction Machine,” Proceeding of American Nuclear Society 9th International Topical Meeting on Robotics and Remote Systems. - Gore, Bryson. Trucks, Tractors, And Cranes. - Grote Antonsson, editors. Handbook of Mechanical Engineering. - Seidel, Michael. Tensile Surface Structures. B-) FL ------------- You cannot teach a man anything; you can only help him discover it in himself.” (Galileo Galilei)
Q:Is the Stephen Crane Short Story The Bride Comes To Yellow Sky a Big Fat Parody?
I have to say no. Your question erred in a significant way. Hollywood didn't create this false image of the West. The false image was created a long time before by people living in the age of the incidents. It didn't take publishers long to notice that people living back East enjoyed these gritty depictions of the West. Dime novels were a big seller in the 18th and 19th centuries. Look at Stephen Crane. He died in 1900. Hollywood was non-existent as the facet of American life that it holds now. Crane would have been writing this story with the idea that he was depicting a real slice of the wild West that was becoming more civilized.
Q:WHAT IS WITH THESE CRANE FLIES????!!!!!?
The crane fly season only last for a month or so. There are years when they can reach almost plague proportions but within another 2-3 years their numbers should return to normal.. They can cause some damage to farm crops but the good news is that they are harmless to us.
Q:need a 5 ton jib crane design with drawing please help, boom 12ft hub 16ft?
1. If You Mean Their Personality Then Tohru From Fruits Basket. 2. a. Pink. Purple. Blue b. Full Moon's From Full Moon wo Sagashite. 3. I 3 Shojo! 4. Put Some Kanji! 5. My Swiss Fudge Cookies! Anime Q- I've Never Seen Any That Do.
Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane,?
Fast Crane = A unload x /hour Slow Crane = B unload y /hour A + B = 8 hours x /hour + y /hour = 8 hours (average rate) average rate = (x + y) / 2 so 8 hours = (x + y) / 2 and x + y = 16 since the slow crane is 12 hours longer, x must be 2 hours, since they will both take 2 hours and the slower crane will take 2 hours plus 12 hours equalling 14 hours. The rate of crane A is 2 hours to unload and the rate of crane B is 14 hours to unload. The average rate for both to unload is 8 hours. There were certain assumptions made to solve this puzzle and it is not clear how they actually operate on the ship while unloading. ~~ The most practical way to unload the ship is *NOT* to use the slower crane since it takes longer for them to work combined, than for the faster crane to work alone !! A tricky but fun question !! :-b
Q:Exactlly what type of bird is a crane?
A wading bird Of the family, Gruidae
Q:How many meters is the tower crane installed on the edge of the deep foundation pit?
Tower crane foundation, if set up in the foundation pit, the foundation is to pile other, general tower crane is to support the wall.Therefore, how far away from the foundation pit is determined by the distance from the retaining wall.According to the industry standard "technical specification for concrete foundation of tower crane tower crane foundation installation" (JGJ/T187-2009), the installation of tower crane foundation concrete should reach more than 80% of design strength, the tower crane foundation concrete design strength should reach 100%.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range