Tower Crane TC5013A Wholesale China made

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Quick Details


Feature: Tower Crane                          Condition: New                                           Max.Lifting Load: 6T

Span: 50m                                             Place of Origin: China(Mainland) 

Brand Name: CMAX                              Model Number: TC5013A         

 

Packaging & Delivery


Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Specifications

 

● Max. working range 50m, tip lifting weight 1.3T and Max. lifting weight 6T.


● Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.


● Trolleying mechanism can provide two operation speeds.



FAQ

 

Q: What is the difference between CNBM and CMAX?

A: CNBM stands for China National Building Materials (Group) Corporation, which is established in 1984, is the largest state-owned group corporation of building material & machinery with a total asset of 15 billion USD and a staff of 100000.

CMAX is the brand name of CNBM Group’s construction products, C stands for China and Max stands for Maximum.

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, CNBM could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



 

To Lead The Revoluation of International Trade

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:QTZ63 (Q5610) tower crane power, how many power parts, name, model specification, product number, date of appearance
All the details of the equipment are availableAs for power, it depends on the specific configuration of the frequency conversion and non frequency conversion will not be the same
Q:What are the characteristics of a tower crane?
Four, according to the different installation methods of cranes, can be divided into folding transport, self erection of the rapid erection of tower cranes and the need to use the auxiliary machine assembly and disassembly of tower cranes.Can set up their own fast loading crane are small and medium slewing tower crane, mainly used for short duration, low buildings move frequently, the main advantage is to improve work efficiency, save installation cost, save time and labor and material, disadvantage is the complicated structure, large amount of maintenance.A tower crane that needs to be disassembled and assembled by an auxiliary machine is mainly used in middle and high rise buildings, with large working range and large lifting capacity. It is the main type of construction site at present.Five, according to whether the spire structure, can be divided into flat head tower crane and tower tower crane.Tower crane is a new type of tower crane is developed in recent years, its characteristic is the tower cap and the rod part before and after the cancellation in the structure of the original tower crane on the enhanced structural strength of the arm and balance arm, arm and balance arm is directly connected, the utility model has the advantages of:1 、 the whole machine is small in size, easy to install and safe, reduce transportation and storage costs;2, the boom of tolerance and good performance, uniform stress, small damage on the structure and connection part;3, component design can be standardized, modular and interchangeable, reduce equipment idle, improve investment efficiency.It is in the same type of tower crane tower crane head Zhongping slightly higher prices.
Q:[tower crane] and [tower crane] what is the difference between, how to distinguish?
There are many nicknames for tower cranesTower Crane Tower Crane Tower
Q:Tower crane TC6013A-6-A2, what does "A-6-A2" mean later?
This is the old saying. The international standard is now used. For example, the QTZ100T.M lifting torque is 980KN.M (kn. Meters).The QTZ100 is similar to the lifting torque of the TC6013. But not the same model.
Q:Tower crane; command; gesture
1. prepare (note): arm extension, placed above the head, five fingers stretched out naturally, palm forward remain motionless.2. main hook: single hand natural fist, in the head, touch the head3. auxiliary hook: a hand clenched, small arm to immobile on the other hand, elbow, hand hand touch before.4. hook up: small arm to the side of the upper extension, five fingers natural extension, higher than the shoulder, with the wrist as the axis rotation.
Q:Under what circumstances does a tower crane require third party testing?
New clothes, relocation or transformation should be examined by the quality and Technical Supervision Bureau
Q:The earthing resistance of tower crane shall not be greater than that of the tower crane
The lightning resistance of tower crane (tower crane) on the construction site shall be no more than 4 ohms.I. tower crane GB/T 5031--20085.5.5.9 lightning protectionIn order to avoid lightning stroke, the main structure of the tower crane, the motor frame and all the electrical equipment metal shell, wire metal protection tube should be reliable grounding, and its grounding resistance should be no more than 4 ohms. When multiple repetitive earthing is adopted, the grounding resistance shall be no more than 10 ohms.Two. Safety regulations for tower cranes GB 5144 - 20068.1.3 tower crane metal structure, track, all electrical equipment metal shell, metal line pipe, safety lighting transformer, low voltage side should be reliable grounding, grounding resistance is not more than 4 ohms. Repeated earthing resistance is not greater than l0. The selection and installation of the earthing device shall comply with the relevant requirements of the electrical safety.The insulation resistance of the 8.1.7 main circuit and control circuit shall not be less than 0.5M ohm.
Q:Are tower cranes the same as tower cranes?
Tomato, you tomato, potatoes, you potatoTalent exchange of tower crane and tower crane
Q:How many motors does the ZOOMLION TC6013A-6 tower crane use?
Model: YZRDW225M-4/8 power: 24/24KW speed: 1420/725r/minDirect search {ZOOMLION QTZ80 (tc6013) _ crane Manual Part 1 (Part Two)}, can also be found.
Q:What are the climbing claws on the tower crane?
Climbing is lifting work cylinder claw pole on the standard main limb rod bearing points of the.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range