Tower Crane TC5013A(QTZ63) Qualified Supplier

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Detail of Tower Crane

Feature: Tower Crane                Condition: New                         Application:Building,Construction,Industrial

Rated Loading Capacity: 1.3-6T      Rated Lifting Moment:63KN.M            Max. Lifting Load: 6T

Max. Lifting Height: 121M           Span: 2.5-50M                          Place of Origin: China (Mainland)

Brand Name: CMAX                    Model Number: TC5013A(QTZ63)           Certification: ISO,CE

Warranty: 1 Year                    Free standing height (M):4O            Max. Working Range(M): 50

Tip Lifting Weight(T): 1.3          Working Range(M): 44,50                Climbing speed(M/MIN): 0.5

Counterweight(T): 11                Working Temperature(°C): -40-+60      Type: Topkit Tower Crane

Delivery Date:25-30 days            Mast Section Size(L*W*H)MM:1600*1600*2500(Panel type)             


Main Features of Tower Crane


1. TC5013A(QTZ63)   have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 50m, TC5013A(QTZ63)  tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

 

2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

 

3. It is original in design, reliable in operation and satisfactory in shape.

 

4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.

 

6. Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.


7. Trolleying mechanism can provide two operation speeds.


8. With scientific layout and beautiful appearance.

 

9.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. 

 

10.After sales service will be offered which will get rid of all your worries in the purchase of our products


Specification of Tower Crane

 

Tower Crane TC5013A(QTZ63) Qualified Supplier


Tower Crane TC5013A(QTZ63) Qualified Supplier

Tower Crane TC5013A(QTZ63) Qualified Supplier


Images of Tower Crane
 

Tower Crane TC5013A(QTZ63) Qualified Supplier

Tower Crane TC5013A(QTZ63) Qualified Supplier

Tower Crane TC5013A(QTZ63) Qualified Supplier

Tower Crane TC5013A(QTZ63) Qualified Supplier

Tower Crane TC5013A(QTZ63) Qualified Supplier


FAQ about Tower Crane

 

Q: What kinds of tower crane are available now? 

A: Four main categories: normal  tower crane  with cat head, internal climbing  tower crane , top less  tower crane  and luffing  tower crane.  

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What does a track type tower crane look like? In that case, use?
With a trolley, it can move in a straight lineSuitable for short range movement
Q:What are the requirements for jack up and plus section of jack up tower crane?
Shall conform to:1, tower crane has not reached the standard free height or attachment, not to the standard suspension height;2. The standard section of tower crane jacking must be the size of the original production;3, tower crane jacking work must be carried out by the professional installation team;4 tower crane jacking up, the wind must be less than four.Answer the 1 floor:The height of the self elevating tower crane is built up by other cranes like building blocks.
Q:How did the tower crane rise on the construction site? Fifteen
With a bar of steel, each layer has about 10 or more bars of steel. When the building rises, add a few more bars to the top floor, plus a few layers. It uses the stability principle of the triangle to keep the tower crane from tilting, and it also needs to pull some cables around to keep it balanced, just like a country pole.
Q:In the case of tower crane operation, the operation should be stopped
In case of six or more gales, heavy rain, heavy fog, heavy snow or tower crane, you should stop working
Q:Can the tower crane personnel install the construction elevator?
As for the hoisting equipment, the licensed crane erection worker can install the construction elevator.
Q:Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
It is the work level of the organization, representing the working hours and load sizes of the institution. See GBT/13752 or GBT/3811 for specific explanations.
Q:How much height should tower crane work at M?
Try to ensure that the tower crane in the wind is too large to be free of rotation. The safe distance between the rear arm of tower crane and adjacent buildings shall be no less than 50cm. The safe distance between tower crane and power line meets the requirement.
Q:Tower crane technical condition GB/T 9462-1999 has been cancelled? If so, what is the new standard?
This standard applies to tower cranes defined in GB/T 6974.3.This standard does not apply to mobile cranes equipped with tower cranes. This standard compares with the 5 standards such as GB/T 9462-1999, the main change is as follows:- redefining the type identification principle of tower cranes and eliminating the parameter series in JG/T 5037-1993;
Q:All types of jack up cranes. How is the maximum lifting torque converted?
Tower crane lifting torque = crane maximum lifting weight * maximum operating range; for example: the maximum lifting weight is 2T*, the maximum operating range of 50 meters =1000KN.m.
Q:How to fix the cable on the tower of QTZ125 type tower crane?
segments can be fixed after solving this problem, usually with plastic copper (with insulating layer) and insulator is fixed on the tower body section,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range