Tower Crane TC5013A Construction Machiney

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
15 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Introduction:

Tower crane is used to lift, lower and horizontally move materials in construction and other industry. It has large lifting capacity and lifting height, wide moving range, and can rotate. It basically consists of base foundation, mast, slewing unit, working jib, counter jib, counterweight, hook, and operating cabin.


Features:

1. All the components are designed to minimize the total number of trucks required to transport them.

2. The jib components can house the jib tiesto, which makes transport easier and quicker. Easy assembly of the jib and counter-jib ties.

3. The mechanisms are always used at full power. When hoisting, the speed is optimized according to the load and command. In distribution, progressive variation of speed and the maximum speed are adapted to the weight of the load. In orientation, there is controlled proportionalspeed with optimal acceleration and deceleration in accordance with the maximum admissible torque for the mast.

4. The auxiliary winch can be used on the derrick: this provides user with the possibility of a motorized derrick at the base of the machine.

5. DVF Distribution
The jib-footDVF mechanism is easily accessible in total safety.
Progressive speed variation by proportional control.
The speed depends directly on the controls manipulated by the crane operator.
To make driving the crane easier, 2 hard spots integrated into the controlsprovide better pinpointing of the speed.

6. RVF + orientation

The RVF Optima + orientation enables gentle rotating movements without jerking.

7. Fully integrated progressive control. Driving adapts to the behavior of the crane operator. The slow-down phase of the jib is managed by the frequency variator, Or by an inverted command in the slow-down phase, called a "counter-orientation" command.


Specifications:

Tower Crane TC5013A Construction Machiney

Tower Crane TC5013A Construction Machiney


Tower Crane TC5013A Construction Machiney

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Detailed parameters of QTZ80 tower crane 50
You're welcomeDesign units are different.Our factory is Langfang Design Institute drawings. May refer to the following.Arms 55 meters long.
Q:What are the special operators of tower cranes?
The tower has special operations personnel of heavy machinery refers to the construction site in the tower crane division signal cable, installation and disassembly, the driver, and the demolition work of gondola installation, may cause serious harm to themselves, others and the surrounding facilities operations personnel.
Q:Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q:Under what circumstances does a tower crane require third party testing?
New clothes, relocation or transformation should be examined by the quality and Technical Supervision Bureau
Q:Four for crane, two for insurance, two for insurance. What does that mean?
Refers to the air switch and the electric leakage protector in the electric tray.
Q:What are the lifting moment requirements for tower cranes?
1. Tower crane consists of three parts: metal structure, working mechanism and electrical system. The three main technical parameters are lifting moment, lifting weight and working speed. Lifting moment refers to the boom as the basic arm length maximum amplitude corresponding to the rated lifting weight of product, product or maximum weight with the corresponding inflection point.
Q:What are the four major moving mechanisms of a tower crane?
Tower crane refers to the fuselage for the tower frame, can walk along the track, a crane equipped with rotary arm. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system.
Q:What is the standard weight of a tower crane for 1.6*1.6*3 and 1.6*1.6*5m? Kg?
The standard weight of tower cranes for 1.6*1.6*3 and 1.6*1.6*5m is 500KG
Q:Where can I get the tower crane manufacturing permit?
Zhengzhou China enterprise management consulting company, oh, my uncle company for tower crane manufacturing license is to find them, they are not only a team of professional, and service is very thoughtful, efficient.
Q:What is the difference between a tower crane and a jack up tower crane?
The fixed tower crane means lifting the foundation of the tower body on the foundation or structure through the connecting piece.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range