Tower Crane TC5013A Construction Equipment Sales Building Machinery Distributor

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC5013A Description:

1.CMAX Tower Crane TC5013A  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC5013A  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC5013A has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC5013A  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC5013A  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC5013A  Parameter:

 Max. working range 50m, tip lifting weight 1.3T and Max. lifting weight 6T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 40

Max height with attachment (m) 121

Working range can be adjusted (m) 44、50

Min working range (m) 2.5

Max lifting capacity (t) 6

Tip load @ 50m (t) 1.3 


Tower Crane TC5013A   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC5013A Diagram:

Tower Crane TC5013A Construction Equipment Sales Building Machinery Distributor




Tower Crane TC5013A Construction Equipment Sales Building Machinery Distributor

Tower Crane TC5013 Technical Sheet:

 Tower Crane TC5013A Construction Equipment Sales Building Machinery Distributor

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Do self lifting tower cranes allow a small swing of the boom in jacking operation?
The upper working structure of the attached tower crane is connected with the jacking sleeve frame, and a jack jack is mounted on the top lifting jacket frame. The upper crossbeam of the jack is connected with the jacking frame, and the lower cross beam is provided with a movable claw, and the lower supporting point can fall on the step of the standard section of the tower body. During lifting, first trim jib and balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.
Q:What is the standard weight of a tower crane for 1.6*1.6*3 and 1.6*1.6*5m? Kg?
The standard weight of tower cranes for 1.6*1.6*3 and 1.6*1.6*5m is 500KG
Q:Can the tower crane personnel install the construction elevator?
Although it belongs to the construction of special operations, but the operation of different categories, tower crane demolition workers according to the requirements can not install the elevator!
Q:What kind of equipment must be installed on luffing trolley of horizontal luffing tower crane?
It must be installed:To prevent the trolley cable broken car slip away;
Q:What is a tower crane without a collector?
Once again, because the collector is using carbon brush and copper ring contact, the tower crane work in the sway of the impact is too large, easy to cause carbon brush and copper ring arc between burning. Combined with this reason, today's tower cranes do not use collector. The drawback is that the tower crane can not be one-way one-way rotation. So now the use of rotary limiter, set the tower one-way rotation can only turn 540 degrees, want to turn, can only turn in the opposite direction.
Q:What are the safety devices for tower cranes?
Safety device for tower crane(1) lifting moment limiter, tower crane in lifting objects, the lifting radius and weight of the crane product is a constant number. According to this principle, a lifting torque limiter has been developed, the main function is to prevent overloading of the safety devices. The moment limiter only acts as a protection against the overload torque in the vertical vertical plane of the tower crane arm, and can not protect the tilting accidents caused by oblique hanging, wind load, rail inclination or collapse, etc..(2) weight limiter weight limiter's role is to protect the goods lifting weight does not exceed the maximum allowable weight of tower crane, tower crane is used to prevent the load exceeds the maximum rated load, avoid mechanical damage accident.
Q:Notice of tower crane
Installation condition of 3.2 tower crane3.2.1 tower crane has special equipment manufacturing license, product certification, manufacturing supervision and inspection certificate, the tower crane manufactured abroad should have product certification, and has been in the construction administrative departments for registration.3.2.2 tower cranes shall be of complete structure and conform to the provisions of GB5144 "safety regulations for tower cranes".3.2.3 under the following circumstances, tower cranes are not allowed to use:If the state has been eliminated from the designated period of time, exceeding the prescribed service life assessment, the safety devices and safety facilities can not meet the safety and technical standards of the state or industry; there is no complete safety technical file.3.2.4 tower cranes must be maintained and fully checked before they are installed. Structural parts with visible cracks, severe corrosion, overall or partial deformation, connecting shafts (pins), Kong You, severe wear and tear should be repaired or replaced, in accordance with the provisions of the installation.3.2.5 tower crane foundation should meet the requirements of the use manual, the carrying capacity of the foundation must meet the requirements of tower crane design, installation should be carried out before the hidden project acceptance, qualified before installation. Slope and drainage facilities should be built around the foundation.The track foundation and track laying of 3.2.6 walking tower crane shall be carried out according to the instruction manual and shall comply with the provisions of GB5144.
Q:Operation points of tower crane (tower crane)?
Slewing bearing: tower crane is one of the most critical components, mainly to bear overturning moment and vertical load. After the failure, the demolition and replacement is extremely difficult, loss of large, so you have to check carefully to do maintenance, each 200H must be a senior grease lubrication from the rotary bearing surface, until now exudation. Slewing bearing adopts high strength bolt connection, if the pretension is not enough, or long-term operation, do not check, not fastening, will cause loose. If the individual bolts loose, will cause the remaining bolts overload, the consequences will be disastrous. The luffing mechanism only moves horizontally, the load is light and the line speed is not high, so it should be easy to master and operate. However, the amplitude involves the change of the lifting torque, and if there is no stopping in time, there will be the possibility of over torque. Therefore, the main requirement of variable amplitude operation is stationary parking and accurate positioning. The tower crane is of great height and the hanger is hung longer, so it is easy to swing the hanger when it is running. This is an objective phenomenon. What is called stabilization hook operation is how to make the swinging hook stop quickly, or how to make the hook move with the movement of the crane as soon as possible, and minimize the operation of the swing. The operation of stabilization hook is the skill that the driver should master.
Q:Tower crane TC6013A-6-A2, what does "A-6-A2" mean later?
TC6013A-6-A2:TC is the abbreviation of tower crane, and 6013 is crane lifting moment, which means that 60 meters long arm tip can lift 1.3 tons. A says Model 6 means lifting capacity of 6 tons. "A2" means code.
Q:How to fix the cable on the tower of QTZ125 type tower crane?
segments can be fixed after solving this problem, usually with plastic copper (with insulating layer) and insulator is fixed on the tower body section,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range