Tower Crane TC5013A Construction Equipment Building Machinery Distributors

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC5013A Description:

1.CMAX Tower Crane TC5013A  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC5013A  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC5013A has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC5013A  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC5013A  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC5013A  Parameter:

 Max. working range 50m, tip lifting weight 1.3T and Max. lifting weight 6T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 40

Max height with attachment (m) 121

Working range can be adjusted (m) 44、50

Min working range (m) 2.5

Max lifting capacity (t) 6

Tip load @ 50m (t) 1.3 


Tower Crane TC5013A   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC5013A Diagram:

Tower Crane TC5013A Construction Equipment Building Machinery Distributors




Tower Crane TC5013A Construction Equipment Building Machinery Distributors

Tower Crane TC5013 Technical Sheet:

Tower Crane TC5013A Construction Equipment Building Machinery Distributors

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How did the tower crane rise on the construction site? Fifteen
With a bar of steel, each layer has about 10 or more bars of steel. When the building rises, add a few more bars to the top floor, plus a few layers. It uses the stability principle of the triangle to keep the tower crane from tilting, and it also needs to pull some cables around to keep it balanced, just like a country pole.
Q:Ever felt like a paper crane?
Physically, folded to and fro, folded back over again, then backwards with a bent beak and wings enabling me to creatively go beyond all limitations of an ordinary piece of colored paper. Many journeys traveled as a paper crane, lion, and dragon!
Q:How does the Red Badge of Courage relate to Stephen Cranes Life?
In March 1893, while spending hours lounging in his friend Corwin Knapp Linson's studio while having his portrait painted, Crane became fascinated with old Civil War issues of the Century published between 1884 and 1887. Largely devoted to famous battles and military leaders, the writing was dry and lifeless and Crane, frustrated, said to Linson, I wonder that some of those fellows don't tell how they felt in those scraps. They spout enough of what they did, but they're as emotionless as rocks. Crane returned to these magazines during subsequent visits to Linson's studio and eventually the idea of writing a war novel overtook him. He would later state that he had been unconsciously working the detail of the story out through most of his boyhood and had imagined war stories ever since he was out of knickerbockers. This novel, which he believed would make him famous, would ultimately become The Red Badge of Courage. From the beginning, Crane wished to show what it felt like to be in a war by writing a psychological portrayal of fear. Conceiving his story from the point of view of a young private who is at first filled with boyish dreams of the glory of war and then quickly becomes disillusioned by war's reality, Crane borrowed the private's surname, Fleming, from his sister-in-law's maiden name. Crane would later tell Hamlin Garland that the first words and paragraphs came to him with every word in place, every comma, every period fixed.
Q:1000 Paper Cranes, Senbazuru gift for my boyfriend as a 1st anniversary gift?
It does seem like too much because it's a big time consumer to make it--takes hours upon hours upon hours. An average of 1 crane made every 5 minutes would result in 83.3 hours nonstop of crane making. That's off-putting. Alternatively it would be like him giving you a $600+ ring because he worked 83.3 hours at his $8/hr job. It's just weird to put in that much time for a 1st year anniversary.
Q:Where can I find book on the literary Critisim of Stephen Crane and his war stories?
i think of if a guy or woman have been to apply roman numerals i think of that they try to make the tale look exciting and eye catching by fact in case you think of approximately it there are not allot of books with roman numeral chapters, so i think of that's unique. it is not snobbish in any respect, that's distinctive and exciting than a million/one or 2/2. i think of a financial disaster with in simple terms numbers is easy yet exciting incredibly if the e book develop into approximately an murderer or undercover agent. i think of it says that the financial disaster speaks for itself no longer the quantity. i think of even naming the financial disaster could be much greater helpful by fact tit's ingenious. BQ: I p.c. on what the form is and what could greater healthful superb with my tale. as quickly as I write a narrative in a distinctive era or 3 hundred and sixty 5 days I frequently could exchange the font to make it journey. i think of that the financial disaster sort ought to journey up with the books plot. If my tale develop into ordinary i could carry on with the numbers, in spite of the undeniable fact that that's all approximately what you sense is nice and what you think of is superb on your tale. super question to invite.
Q:Stringing Paper Cranes Together?
You poke a hole in them and string them....
Q:What is the most effective way to kill a Crane Fly (Daddy Long Legs)?
A Daddy Long Legs is a spider. Crane flies are not related to spiders. We call crane flies leatherjackets even though that's the name for the larvae. My husband calls them mosquito hawks. If you don't have my cat, who considers them a delicacy and allows me to carry her around the house so she can catch them and eat them (and apparently floss her teeth with them), then the towel snap is quite effective.
Q:Have you studied Tiger and Crane Kung Fu? ?
I okorder.com/ Gung Gee Fook Kuen: Taming The Tiger Fu Hok Sueng Ying Kuen: Tiger and Crane Double Form Tiet Sin Kuen: The Iron Thread
Q:How to change the mechanical property unit of crane (tower crane)?
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:How do you make a thousand paper crane lei?
But I do different from step 11 on Step 11: Normally they fold along the red line. I dont. On step 10 you see the cross line in the center +. I then fold the right pointy toward the center. Do the same for all. Step 12: I the filp the right top layer to the left, same with the back side. Step 13: fold the bottom point to the top(one layer only) filp to back side, do the same. Step 14: flip right layer to the left again, same with the back side. Step 15: Pull and done.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range