TOWER CRANE TC4610
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。
1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.
The construction hoist product produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad
1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
Model | Max.lifting capacity & work range | Max.work range & lifting capacity | Max.independent lifting height(m) | |||
Torque | Lifting capacity at max.boom length | Lifting capacity(t) | Work range(m) | Work range(m) | Lifting capacity(t) | |
QTZ31.5 | TC3508 | 3 | 11.59 | 35 | 0.8 | 29 |
TC3807 | 3 | 11.15 | 38 | 0.7 | 29 | |
QTZ40 | TC4208 | 4 | 11.6 | 42 | 0.8 | 29 |
TC4708 | 4 | 13.4 | 47 | 0.8 | 29 | |
QTZ50 | TC4610 | 5 | 11.9 | 46 | 1 | 36 |
TC5010 | 5 | 13.1 | 50 | 1 | 36 | |
QTZ63 | TC5013 | 6 | 13.72 | 50 | 1.3 | 40 |
TC5013A | 6 | 13.72 | 50 | 1.3 | 40 | |
TC5510 | 6 | 13.17 | 55 | 1 | 40 | |
TC5510A | 6 | 13.17 | 55 | 1 | 40 | |
QTZ80 | TC5512 | 8 | 12.68 | 55 | 1.2 | 45 |
QTZ100 | TC6013 | 8 | 14.45 | 60 | 1.3 | 45 |
QTZ125 | TC6014A | 10 | 12.4 | 60 | 1.4 | 50 |
QTZ160 | TC6020 | 10 | 15.2 | 60 | 2 | 52.6 |
QTZ250 | TC7030 | 12 | 20.4 | 70 | 3 | 45 |
- Q:Where can I get the tower crane manufacturing permit?
- This is the permit of the Bureau of quality supervision
- Q:my sister would like to know this for some strange and bizzar reasion
- It depends on how many people are making them. Depending on skill it takes about 2-5 minutes to make a crane. If you dedicate 5 hours a day that makes 7-50 days if one person is making them. Cranes are often made for memorial. It is a Japanese tradition, especially for Hiroshima. You make 1000 cranes as a memorial for the lost lives. She should definitely get her friends to help.
- Q:How to improve the stability of tower crane
- The fatigue test data show that the fatigue life of the phosphating coating of steel wire rope is about 3 times of the same structure light steel wire rope (laboratory comparable conditions), not easy to wear and corrosion is not easy to cause the service life of wire rope large amplitude extension. Manganese phosphating is wear resistant phosphating, which can solve the wear problem in the use of wire rope and improve the corrosion resistance. It is for reference only
- Q:Can anyone give me a summary of The Veteran by Stephen Crane?
- A Civil War veteran, years after the war, admits to a group of men that he was frightened in battle; this, in gtresence of his grandson. The boy is visibly shaken by his grandfather's admission. this in the presecnce
- Q:What are the requirements for the use of an anti-two block device on a lattice boom crane used as a drill?
- what the hell are you talking about
- Q:how long do i have to work as a yardhand in oilfeild to become a crane operator?
- You need to get licensed or certified to operate the crane. make sure you are qualified before you start complaining about not getting more challenging work. The world needs ditch diggers to so get back to work.
- Q:I was wondering how those guys/gals get up to their posts. Is there some type of elevator or do they climb up everyday? I'm talking about those big cranes on contruction sites. the huge ones.
- There are ladders leading up there. Crane operators are fit enough to do the climb at least twice a day. I climbed cranes on weekends as a hobby photographer to take panoramic shots from that nice position up there. It was quite a climb to get up more than 200ft (60m)
- Q:I was watching Batman Begins and at the end Gorden says that he hasn't caught Crane. Since the villians in the next Batman movie are going to be two-face and the joker will Crane make a reapperance in the thrid movie (if there is one)?
- The Joker became employed by making use of the particularly some crime businesses to kill the Batman. He used his criminal genius to concoct an tricky plan to stress Batman to bare his identity. this could harm Batman's benefit of anonymity, making it much less complicated to kill him. because it became out, The Joker didn't wish money, he wanted to run Gotham city's criminal underground, Batman and Harvey Dent have been interior the way. interior the Batman comics, the Joker is Batman's arch enemy. Homicidal, and outstanding, he's often finding for a thank you to kill Batman. regardless of if it skill killing innocents or destroying Gotham city interior the technique. For all those at a loss for words approximately Joker robbing banks: He merely robbed the banks that the criminals had their money in. by making use of doing this, he became particular to get their interest. while Gordon and his team cracked down on 'the mobs'' materials, Joker became there to lend guidance by making use of removing all those that have been inflicting the subject concerns. especially Harvey Dent, and Batman, yet in addition the Commissioner, and the decide allowing Dent to prosecute them. continuously a pair of steps previous to maximum, he knew by making use of soliciting for 0.5 of 'the mob's' money, they had be vulnerable sufficient to overhaul. the explanation Batman completes Joker is as a results of the fact Batman is the only guy or woman clever sufficient to make certain by using his plans. for this reason, it quite is mostly a project to defeat Batman, yet not inevitably kill him.
- Q:I want to win a watch from a skill crane at Dave and Buster's and I need some tips.
- Be the crane, be the crane. Seriously, just aim at the biggest item with three openings and try to move the crane to get it. They should let people rotate the crane, but then it would be easy for them to lose money.
- Q:For anyone who has read/studied Stephen Crane - do you know of any connecting theme within his most famous short stories (the open boat, the blue hotel, the bride comes to yellow sky, the monster)?I was think naturalism b/c it is so prevalent in the open boat but is really the only short story naturalism is in
- sorry, i haven't read any Crane short stories, but i'm a HUGE fan of his poetry. it's some of the most bleak, raw, yet honest poetry i've ever read.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
TOWER CRANE TC4610
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords