TOWER CRANE TC4208

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

The construction hoist product  produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

 

 

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Who is responsible for the construction of the pile foundation of the tower crane?
According to the present list of quotations, the winning project, the tower crane cost has been included in the total price, and has nothing to do with the construction side, that is, the cost of tower crane foundation should be borne by the construction side.
Q:When the tower crane top height is more than meters
Circular of the Ministry of housing, urban and rural construction on Issuing the measures for the safety administration of sub hazardous and sub divisional projectsAnnex No. [2009]87 [Annex two]"More than a certain size of the risk of larger sub sub project scope."
Q:More than meters of tower cranes must be equipped with red barrier lights at the top
To see the land of tower crane or floating crane... Basically, however, tower cranes over 30 meters above the tower shall be equipped with red light on the top of the tower and jib.
Q:What is the power of a tower crane? Five
TC7525-16D switchboard power 80KWTC5610-4 switchboard power 34KW.TC6015A-10E switchboard power 71.5KWThe other two types have not been touched and will not be answered. I'm sorry
Q:Construction tower crane driver (T) Ben can be used as construction crane driver (S)?
Building crane driver (T); tower crane driverConstruction crane drivers (S); construction elevator drivers; neither is common.
Q:What should be included in the disassembly plan of the tower crane?
- 2 - (1)Project and safety supervisor with safety certificate and mechanical management personnel.(2)Construction crane with qualification certificate for construction operationMachinery installation, disassembly, lifting, signal workers, electricians, lifting drivers, cable operators and other special operations personnel.The above constructors shall fill in the name, type of work and qualification number of the constructors.11 、 installation procedure and safety quality requirement;In strict accordance with the tower crane product specifications, installation procedures and safety quality requirements of the implementation of the organization of safety construction technical disclosure and signature confirmation.12, installation self-test;After installation, the installation of the unit with the installation quality testing, debugging safety device and complete self-test report.13, major sources of risk and safety technical measures14, emergency plans and so on
Q:The role of slewing limiter in tower cranes is limited
The function of the rotary limiter is to limit the large arm to a certain set stop. Protect from turning to danger settingThe function of the amplitude limiter is to restrict the car to come out or return somewhere to stop and protect the car from or within certain dangerous range.The hook safety device is to prevent the wire rope from falling out of the big hook, so as to avoid falling and other dangerous events!
Q:What are the four major moving mechanisms of a tower crane?
The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking.There are many types of tower crane, if according to whether the walking mechanism, there is a fixed type and operation type; according to the tower structure is divided into rotary, inferior type, attached itself three; if divided by the amplitude, a trolley type, luffing type and folding arm luffing type three; according to the weight division, with light and medium and heavy three.
Q:When the tower crane is installed in the fertilizer tank,
There is no standard in the tower crane foundation and building foundation, there is no such provisions.In fact, you can do whatever you can. The only factor that can be said is the Design Institute, to see if they agree.Design Institute to consider this problem, generally disagree, you let the two based on the surface flat, because there is a stress concentration problems. It's like a pebble under your mattress. So, in general they will demand based on the surface in the construction of tower crane foundation floor, the middle 30-50cm gap with soil pad.Of course, no matter which of these two methods you have to use the back belt to enclose the tower crane foundation.
Q:What are the parts of a tower crane? What are their main functions?
Jacking frame: placing slewing mechanism, when lifting tower top, bearing the weight of tower crane balance arm, main arm and tower cap.Standard section: support the weight of tower crane itself and lift the weight of heavy load, and resist the overturning moment of tower crane.Institutions include the followingLifting mechanism: lifting heavy objects.Luffing mechanism: lifting the car to change the rotation center distance.: the upper part of the slewing mechanism of tower crane (including the main arm and balance arm and tower cap) around the rotation center of rotation.Lifting mechanism: tower crane lifting, the upper part of the tower crane elevated hydraulic power system.Walking mechanism: the crane can walk on the track.OtherDrivers’ RoomElectric boxLinkage tableA foundation bearing platform or trackOther safety devices

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range