TOWER CRANE TC3807C

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

The construction hoist product  produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

 

 

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:A crane lifts a 425 kg steel beam vertically a distance of 117m?
Force=mass x (acceleration) -Gravity must be taken into account F=425 x (1.8 -(-9.8)) F=4930 w= F x deltay w= 4930 x 117 w=576810J
Q:What is the significance of the white doves and the crane in the book Sadako?
Anyone who folded a thousand paper cranes would be granted a wish. Sadako wished to healthy again so that she could run and play like before, and she pursued her goal with such determination that, although she died of her disease, she succeeded in transforming the paper crane into a symbol of peace for children all over the world.
Q:my father is owning a crane manufacturing business I hav given my ssc wat should I study after ssc IT, mechani
Without being too critical, the first thing you need to do is improve your English so that you will be a huge help in the company whether in engineering or sales. Cranes require lots of engineering in weight handling (mechanical), automation and controls including instrumentation (electrical) and a tertiary field in engineering is in stopping and starting (clutches and brakes) which can be mechanical or hydraulic engineering. A new filed is metalurgy which is concerned with the way metals perform (stress), lighter,stronger, etc. Take your choice. Mpho
Q:When the tower crane top height is more than meters
(two) lifting equipment installation with lifting weight 300kN and above; demolition work of climbing crane within height 200m and above.The installation and disassembly of the tower crane in accordance with the provisions of the above provisions shall be verified by the expert panel.
Q:why do cranes have outriggers?
To make it harder for them to tip over.
Q:What role does the tower crane torque limiter play?
The overload protection of tower crane is protected by two equipment, lifting load limiter and torque limiter. The latter generally in the big arm root 4-5 meters to the front of the large arm, overloading (Chao Liju) work, it is more important, basically, the scope of work is torque limiter plays a protective role. While the former is the weight limiter function in the arm root within 4-5 meters, because the tower crane is a jib type crane, each allowing weight lifting position corresponding to the different (CAB load curve). For example, such as 63KN.M, the big arm root 2 meters lifting, the theory is 23 tons, while the torque limiter is not over, but in fact, the tower crane at early crouched down, so the weight limiter in this work.
Q:Does anyone know how cranes are put in place?
large cranes are build at the factory and torn down and put together the first time, then after that the can be move in larger sections than when it came from the factory.
Q:I am thinking about buying an engine crane or engine support for doing timing belts?
Probably an engine crane (engine hoist). Engine support you still need to lift the engine for the engine support. You hardly ever need to maneuver the engine to do a timing belt. Edit: I have one of the portable lifts what some refer to as a cherry picker. I've never had the need for an engine support.
Q:crane operators?
OK, first, what kind of crane? there are many different kinds that do many different things. From loading containers at the seaport to high rise buildings. One does not just go into cranes. The more experienced ones, started out as oilers or greasers. Some started out as signal persons. They learned by watching and listening. In the following states you must hold National certification: CA, HA,MT,OR,WA,MN,WV,NM,RI,NJ,NV,NY UT. PA and SC have restrictions now but will be added sometime soon. You can attend a crane school that prepares you for the national certification, but it expensive and not easy for someone without a background working around cranes. There is a lot of terminology and mathematics involved. Not to mention the Federal, state, local and OSHA rules you must practice. Go to your state employment office. They have all the information you need. get to know one of the counselors and pursue your dream. It is not as easy as it seems. But is it a well paying career. Good luck Bill
Q:What should i do to solve tower crane collapse?
i couldn't figure it out either. try the castle catapult instead.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range