TOWER CRANE TC3508A

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

The construction hoist product  produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

 

 

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Calculate how much power the crane has?
the crane ?? The crane is not defined.
Q:How often should the crane be inspected regularly?
Tower cranes, elevators, mobile cranes 1 times a year, including rubber tyred container gantry crane every 2 years 1; small light lifting equipment, bridge crane, gantry crane, gantry crane, cable crane, crane mast, railway crane, jib crane, mechanical parking equipment every 2 years 1, the crane annual molten metal and hot metal 1.Rules for periodical inspection of lifting machineryArticle 1 These rules are formulated in accordance with the regulations on the supervision of special equipment safety and the regulations on the supervision of crane safety.Article second of the rules from the regular inspection of heavy machinery, is often used in hoisting machinery maintenance unit (hereinafter referred to as the foundation of the self inspection and maintenance), by the State Administration of Quality Supervision Inspection and Quarantine (hereinafter referred to as the State Quality Inspection Administration) special equipment inspection agency approved (hereinafter referred to as the inspection agency) according to the rules, to incorporate the use of registration in the inspection of crane.Article third these rules apply to lifting machinery within the scope stipulated in the regulations on safety supervision of special equipment. All the hoisting machines included in the catalogue of special equipment shall be inspected regularly."No" included in the catalogue of special equipment installation supervision and inspection and the implementation form of hoisting machinery factory, direct delivery unit, for use in pre registration by the local inspection agencies in accordance with the rules of the test items and their contents, requirements and methods for inspection of the equipment before using test (i.e., referred to as the first examination), qualified rear can be used for registration. For the first inspection of hoisting machinery, see Appendix A.
Q:what is the load combination with crane load and seismic load according to asce?
Asd Load Combinations
Q:can someone please explain how a crane is lifted from floor to floor while building a High rise?
It's lifted in sections I believe. Once they're at their intended vertical height they then start to construct horizontally. Bit like big boys Mechano (not sure if I spelled that correctly).
Q:what would you wish for if you had 1000 paper cranes?
huh LoL
Q:Oragami crane ring??
I okorder.com/
Q:What Tower Crane Schools is there in Las Vegas?
check with the International Union of Operating Engineers. I know that in the past, they provided the training, and past the general operators certification, there is a Crane certification, and possibly also a Tower Crane endorsement.
Q:Where can I get the tower crane manufacturing permit?
Zhengzhou China enterprise management consulting company, oh, my uncle company for tower crane manufacturing license is to find them, they are not only a team of professional, and service is very thoughtful, efficient.
Q:What do you guys think of the bicycle/crane/barstool kick?
The bicycle/crane is my favorite I've winded people very easily with a quick one to the chest
Q:Safety rules for tower cranes
Three. Check after shutdown3.1 after the tower crane has stopped operation, it is necessary to select the suitable position of the barrier and the middle of the track when the turret is turned and the arm to stop along the wind, and then lock all the rail clamps.All 3.2 tower crane rotary mechanism with a normally closed or braking device, in the stop after the operation, the driver must remove the handle, release the brake for crane in the wind blowing in under the direction of rotation.3.3, the hook should be lifted to the minimum distance from the lifting wall, not more than 5m position, hanging on the hook is strictly prohibited. Not to take reliable measures, not by any means, limiting the boom rotate with the wind.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range