Tower Crane Split in row of weight 6T QTZ100(5516)

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 6T QTZ100(5516) Description

Feature: Tower Crane               Condition: New 

Application: urban construction  Rated Loading Capacity: 6T

Rated Lifting Moment: 125MT    Max. Lifting Load: 6T 

Max. Lifting Height: 150M           Span: 55M 

Model Number:  6T QTZ100(5516)

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

 6T QTZ100(5516) Features

1. Export to more than 20 countries with CE/ISO/GOST Certificates.

2. Stationary,Travelling, external,internal climbing tower crane 

3. Impeller blasting,rust protection paint

4. Advanced painting process

5. Potain masts designed with dismountable panels, making teansport easier and cheaper

6. New designed mast, can be used to Internal and external climbing tower crane

7. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

8. Engineers available to service machinery overseas.   

 6T QTZ100(5516) Specification

Tower Crane Split in row of weight 6T QTZ100(5516)

  6T QTZ100(5516) Pictures

Tower Crane Split in row of weight 6T QTZ100(5516)Tower Crane Split in row of weight 6T QTZ100(5516)



Tower Crane Split in row of weight 6T QTZ100(5516)


 6T QTZ100(5516)  FAQ

Q: What is tower crane?

A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.


Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Follow up question about Sand Hill Cranes?
i though you thoroughly researched about hunting them before asking the question, I figured it was illegal to kill but since you put it in there with other legit game animals I figured it was legal in your area. um, almost all animals can be eaten. except some snakes and other animals with toxins as a defense mechanism, it's unwise to eat those unless you know it very well (such as the blow fish)
Q:Who is Seneca Crane in Catching Fire.?
Seneca Crane was the man who ran the Hunger Games in the year that Katniss was in it. He was killed in the end because in the time HE ran the games, TWO people were allowed to win, and President Snow had him killed. It effected the Gamemakers when she wrote it on the dummy because they were shocked and reminded about punishments if they run the games wrong.
Q:Stephen Crane short stories?
sorry, i haven't read any Crane short stories, but i'm a HUGE fan of his poetry. it's some of the most bleak, raw, yet honest poetry i've ever read.
Q:How should we select a appropriate crane for a particular job ?
What is the load weight? How high is the lift? Obstruction, possibly needing a jib? If you are placing a load onto a roof, how far from the edge of the roof is the load going to be placed? How far from the crane pivot is the load on the ground and how far are you going to to move the load away from the crane to place it in position? How close can you get the crane to the load and to the load placement site. The usual scenario is to call a crane outfit and they will ask you these questions over the phone or come to the site and discuss the lift with you. A crane is rated for maximum lift as close, usually 10 feet,to the cab pivot center. As the distance increases, the maximum load that can be lifted, decreases. Our 15 ton crane can pick 15 tons/ 30,000 pounds at 10 feet from pivot center. With the boom fully extended; the boom is 100 feet, at a 30 degree angle, it can pick up only 5,000 pounds. Inside of every crane cab should be a chart that shows the lift capacity at various boom angles and boom lengths. Also is included is a chart for the Jib, if the crane has one. Wingman
Q:did stephen crane win any awards?
Stephen Crane (November 1, 1871 – June 5, 1900) was an American novelist, short story writer, poet and journalist. Prolific throughout his short life, he wrote notable works in the Realist tradition as well as early examples of American Naturalism and Impressionism. He is recognized by modern critics as one of the most innovative writers of his generation.
Q:Paper cranes... What do I do?
Okay - so if you can't string them from the ceiling - than what I would do is buy some round vases/globes, from Pier one or some place like that, and fill them with paper cranes, then set the bowls on your shelves/windowsill/desk/table or other flat surface. I've enclosed some examples below. You can also make a mobile by hanging something like a super strength hook with adhesive. 3M makes them (the same folks who created scotch tape). The adhesive does not damage walls and you can stick them to anything. They can bear up to 30 pounds of weight. Put a few on your ceiling or walls and hang your mobiles from them.
Q:Did Noah build the Ark with no power tools, nails, or crane?
Yes, but it took around 50 years and he had the help of three strong sons.
Q:A thousand cranes' gift? (Korean context)?
I think that gift would be perfect for a teacher! If I was a teacher and a student gave that to me i'd cry. Have you heard about that book of the 1000 paper cranes? (Can't remember the name) but it says if you make a 1000 paper cranes then you get a wish. Well anyways make sure you present the presents nicely. Like put the cranes in a pretty jar with a beautiful ribbon wrapped around it and get flowers that're her favorite colors.
Q:can anyone give me some info on how to become a crane operator?
I am sorry I do not know where are you from as different country might have different requirement on getting a Crane Operator licence. Anyway, I believe the basic is the same: You need to attend a theory class on crane operations which usually include topics like design theory of cranes, slinging and lifting, signalling. After this, there will be a practical session to test your understanding and practical operations on an actual crane in the training center's facility. Good Luck and May You Attain You Dream :)
Q:Will Johnathan Crane/ Scarecrow reapper in the thrid batman movie?
The Joker became employed by making use of the particularly some crime businesses to kill the Batman. He used his criminal genius to concoct an tricky plan to stress Batman to bare his identity. this could harm Batman's benefit of anonymity, making it much less complicated to kill him. because it became out, The Joker didn't wish money, he wanted to run Gotham city's criminal underground, Batman and Harvey Dent have been interior the way. interior the Batman comics, the Joker is Batman's arch enemy. Homicidal, and outstanding, he's often finding for a thank you to kill Batman. regardless of if it skill killing innocents or destroying Gotham city interior the technique. For all those at a loss for words approximately Joker robbing banks: He merely robbed the banks that the criminals had their money in. by making use of doing this, he became particular to get their interest. while Gordon and his team cracked down on 'the mobs'' materials, Joker became there to lend guidance by making use of removing all those that have been inflicting the subject concerns. especially Harvey Dent, and Batman, yet in addition the Commissioner, and the decide allowing Dent to prosecute them. continuously a pair of steps previous to maximum, he knew by making use of soliciting for 0.5 of 'the mob's' money, they had be vulnerable sufficient to overhaul. the explanation Batman completes Joker is as a results of the fact Batman is the only guy or woman clever sufficient to make certain by using his plans. for this reason, it quite is mostly a project to defeat Batman, yet not inevitably kill him.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range