Tower Crane Split in row of weight 16T QTZ250(7027)

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
200 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

16T QTZ250(7027)  Description

Feature: Tower Crane               Condition: New 

Application: urban construction  Rated Loading Capacity: 16T

Rated Lifting Moment: 160MT    Max. Lifting Load:16T

Max. Lifting Height:2500KM           Span: 70M 

Model Number: 16T QTZ250(7027) 

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

16T QTZ250(7027)  Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Dahan Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary,Travelling, external,internal climbing tower crane 

4. Impeller blasting,rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

16T QTZ250(7027) Specification

Tower Crane Split in row of weight 16T QTZ250(7027)

16T QTZ250(7027)  Pictures

Tower Crane Split in row of weight 16T QTZ250(7027)

Tower Crane Split in row of weight 16T QTZ250(7027)

Tower Crane Split in row of weight 16T QTZ250(7027)


QTZ160(7015) FAQ

Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.


Q: What is tower crane?

A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.


Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:When inspecting a crane, which of the following does not need to be inspected?
A. Load capacity and C. Clearance for swing radius have nothing to do with a Crane inspection. ______________________________________... E. All of the above must be inspected before operating a crane. Is a totally different question. Before operating a crane, B. Fluid leaks C. Clearance for swing radius D. Wire rope wear and sheaves need inspection. Wingman
Q:Did anyone else get really excited when they showed the judge was Dr. Crane/Scarecrow in TDKR?
Yes, that was such a nice surprise. He was a great villain in Batman Begins. For a split second, I was like Wait a minute - the last time I saw Dr. Crane, he was freaking out on that Toxin they released into The Narrows. . ., but then, I remembered - he and everyone else affected by that poison were given the antidote after it was produced by Wayne Enterprises. His role as the judge at the sort of Reign Of Terror style court system is perfect - Crane clearly enjoyed watching people suffer mentally, liked seeing them terrified. Sadistic little twerp. Tough call on favorite.. . while I think the first two thirds of The Dark Knight are probably the very best of the series. . . my personal fave is Batman Begins, too. I can remember the first time I saw it, and as they're showing the establishment shot of those mountains in Asia, Raz Al-Ghul's lair. . . I kept thinking, this is different than any other Batman stuff I've seen - this is cool! Kinda sad it's over! :( Edit - And I just wanted to add - I've used that line Bruce's dad says with my own little son: Why do we fall? :)
Q:What is the theme of the poem A man to the universe by Stephen Crane?
In the poem “A Man said to the Universe” by Stephen Crane three distinct images appear as the reader relates man and universe as they fit into their cosmic role. The simplicity of the five line poem envelopes man’s perception of his place among the universe, the universe’s perception of its role in the order of life, and the relationship of both man and universe in regards to the enormity of the cosmos. Collectively, these three components create a profound thought on creation. By Folrani Adewale
Q:What is the difference between a tower crane QTZ31.5 and a QTZ40?
the length of the arm is 42-48 meters; the elevation is 29-32 meters.
Q:What is the difference between a crane and a crane in a tower crane?
Informal: hoisting signal worker: refers to the signal flag!Cable man: rope!
Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane,?
Fast Crane = A unload x /hour Slow Crane = B unload y /hour A + B = 8 hours x /hour + y /hour = 8 hours (average rate) average rate = (x + y) / 2 so 8 hours = (x + y) / 2 and x + y = 16 since the slow crane is 12 hours longer, x must be 2 hours, since they will both take 2 hours and the slower crane will take 2 hours plus 12 hours equalling 14 hours. The rate of crane A is 2 hours to unload and the rate of crane B is 14 hours to unload. The average rate for both to unload is 8 hours. There were certain assumptions made to solve this puzzle and it is not clear how they actually operate on the ship while unloading. ~~ The most practical way to unload the ship is *NOT* to use the slower crane since it takes longer for them to work combined, than for the faster crane to work alone !! A tricky but fun question !! :-b
Q:What kind of personnel should be installed for the tower crane installation and disassembly?
2, with special construction operation qualification certificate of construction, lifting machinery, installation, demolition workers, lifting signal workers, lifting drivers, cable operators and other special operations personnel.And an electrician.
Q:Can anyone tell me the location of the barn in the water color Waiting Refuge by Jon Crane or how to find it
Well, to help you it would be necessary to look at the picture, I suppose, and none of the internet search results are still valid.
Q:Does anyone have a picture of Seneca Crane being walked to his death by two peacekeepers in The Hunger Games?
I don't think it would be out there yet, as the movie just came out. I would try searching Seneca Crane and then your dad's name. You also might be able to find it on YouTube. It's really cool that your dad was in the movie!! Good luck finding the picture!
Q:What is the tax basis under the Crane Doctrine?
Your understanding of Crane is correct. For purposes of calculating the gain on sale, the basis would be $100k. What Crane really said was that the net proceeds would have to include any assumed debt, in addition to any cash received -- basically that you had to include the debt on both ends of the transaction if my reading is correct. (That jives with the example in Commissioner v Tufts et al, 81-1356 so I think we're correct on that.) Where basis gets interesting is when you are calculating depreciation. At least when you convert a residential property to business use -- i.e. a rental -- you use the LESSER of the cost basis (Crane) or the FMV on the date that the property is placed in business(rental) service. In your example, the depreciable basis would be $80k since that was the lower. For calculating the gain on sale, the cost basis would still be $100k (adjusted down for any depreciation allowed or allowable while in business use of course).

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range