• Tower Crane  Sales TC6520 Construction Equipment Wholesaler System 1
  • Tower Crane  Sales TC6520 Construction Equipment Wholesaler System 2
  • Tower Crane  Sales TC6520 Construction Equipment Wholesaler System 3
  • Tower Crane  Sales TC6520 Construction Equipment Wholesaler System 4
  • Tower Crane  Sales TC6520 Construction Equipment Wholesaler System 5
  • Tower Crane  Sales TC6520 Construction Equipment Wholesaler System 6
Tower Crane  Sales TC6520 Construction Equipment Wholesaler

Tower Crane Sales TC6520 Construction Equipment Wholesaler

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC6520 Description:

1.CMAX Tower Crane TC6520  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6520  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6520 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6520  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6520  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6520  Parameter:

 Max. working range 65m, tip lifting weight 2T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 55、60、65

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 2


Tower Crane TC6520  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC6520 Diagram:

Tower Crane TC6520 Construction Equipment Wholesaler Sales

Tower Crane TC6520 Construction Equipment Wholesaler Sales

Tower Crane TC6520 Technical Sheet:

Tower Crane TC6520 Construction Equipment Wholesaler Sales

Tower Crane TC6520 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6520 for example, the first two letters “TC” means Tower Crane, “65”means jib length is 65meter, and the last two letter “20” means the tip load is :2 ton.

3. What is the principal to quote the right tower crane to the client?

    First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q:But theres always someone who gets a prize everytime. Its so unfair!lol
I'm usually one of those people who gets the prize - or whoever is with me at the moment LOL. Who needs an excuse to watch Spongebob? I watch it even when my kids aren't around. Its one of those shows you wish you could hate, but its just too funny!
Q:Who do you think was better and who would've won if they faced.
Gotta go with Willie. The only match I ever saw Mosconi play was in Chicago back in 1964. He was down 46 to 14 going to 150. When he got to the table he ran 136 and out for the win. It was incredible. I never saw Crane in person and saw only one film of him. He ran 150 and out on Cowboy Jimmy Moore. A good friend of mine was telling me a story about the time he was in Johnston City, Illinois. Richie Lawrence was at the table. My friend was seated in front of Crane. As Richie was shooting, Irving Crane was telling his friend what Richie should be shooting every shot. Richie did just the opposite every time. The neat part about it was... Richie ran 150 and out... and never shot the right ball. Gotta give Willie the edge. Good question.
Q:What do you do after you made 1000 paper cranes. I know you string them up, but storing them is hard. Do you ceremoniously burn them or what? When can they be gone? This is the missing link in the story I want to know. I have 846 and I want to know what to do after I'm done.
i know this big organisation in Japan and some of my frineds live there... if you are interested, I can give you the address and more details...etc
Q:I have a compare and contrast paper due on Tuesday comparing Cranes and The Sniper and I can't find Cranes to save my life. Somebody please help me!!!
Okay Sweetie, Okay all things are safe; Your parents met him, etc all is good. Now let's get to the issue at hand. I have been on this whole internet thing for many years, have had pen friends back in the day and have many RT friends. I speak from experience here is what I am saying. You met a good guy here; just because the voice in your head doesn't match his own voice that's okay, that will come in time. Give him a chance, start out with a solid friendship. You can even say, we just met; I would like to get to know you first. You really can't legally date him (I guess depends on the state) until you are 18. Give it a couple of years, see how it goes. You two just might have an incredible friendship. Then if you keep to these 3 rules your life will be fantastic!!! These 3 rules are the Secret to a extremely happy life. 1) Ask God for assistance on all matters 2) 'Walk in Love' with everyone you meet 3) Treat others how you would like to be treated. May God Bless you in all of your endeavors! Jark
Q:Ty Crane is the star basketball player for st.francis, what is he doing now? Where is he? Why is he not in the NBA?
Actually okorder /
Q:Building a new skyscraper? Tearing down the old Mellon Arena?
Get ready for the new tower.
Q:i have a 100 ton american crawler crane. how do i calculate the psf, for this equipment.
Not sure what you are asking exactly... Are you saying that you have a crane with a capacity of 100 tons and you want to know the pressure on the soil where the crane is positioned? In this case, you take the capacity (in pounds) plus the weight of the crane (in pounds) then divide their sum by the area of the tracks on the crane (in square feet). This will result in pounds per square foot or psf as you wrote above. These are example estimates, they may not be anywhere near the correct answer, this is simply how to do the calculation. Assumed Capacity 100 ton = 200,000 lbs. Assumed Weight 105 ton = 210,000 lbs. Assumed Area of Track = 200 square feet Note: 1 U.S. ton = 2,000 pounds = 2,000 lbs. 410,000 lbs / 200 square feet = 2,050 psf There's a start, now you just need to find out how much it actually weighs and how long and wide the tracks are to get the area of the track on the ground. I hope that answers the question you were asking.
Q:HSE Officers can better answer this question or a qualified Crane operator it self can explain.
each crane is so different. it depends on the rated crane load, the lifted distance from the crane and actuall load to be lifted. Each crane an envelope of angles to the horizontal, lifted load, and distance from the crane. The crane operator must insure that he is within this envelope or the crane may topple over. Also, the wind at the time of the lift must be considered. If you can picture a seesaw with loads pivoting about a fulcrum. When two people are on the seesaw, one person is the crane and the other is the load to be lifted. Only in the case of a crane, the fulcrum is at the crane itself with a large dead load counter weight behind the cab operator.
Q:I've looked on the internet and I haven't found anything so far. The paper on it is due tomorrow...arrrggghhhhh...
Hi, Briisthe! Just go into Google and type - what is the migration route of the whooping crane? Then click on the article - Journey North Whooping Crane Migration Then click on the maps and all will be revealed.
Q:we using EOT crane my company
Your okorder /... contact them with your enquiry. You must include Model and anticipated loads as that determines torque applied. Seed is operator dependent for safe operation.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords