Tower Crane Sale Construction Equipment Building Machinery

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC6024 Details:

Minimum Order Quantity:     1unit                                            Unit:     unit                            Loading Port:     China main Port

Supply  Capability:         5unit/month                                                                Payment    Terms:      T/T   or  L/C


Tower Crane TC6024 Description:

1.CMAX Tower Crane TC6024  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6024  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6024has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6024  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6024  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6024  Parameter:

 Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50.5

Max height with attachment (m) 200

Working range can be adjusted (m) 48、54、60

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 2.4


Tower Crane TC6024  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC024 Diagram:

Tower Crane  Sale Construction Equipment Building Machinery


\Tower Crane  Sale Construction Equipment Building Machinery\

Tower Crane TC6024 Technical Sheet:

Tower Crane  Sale Construction Equipment Building Machinery

Tower Crane TC6024 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6024 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “24” means the tip load is :2.4 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What do Red-crowned cranes eat?
Diet okorder.com/.. I'm sorry, I couldn't find any specific names, but here are some general ones. Sorry again.
Q:How do you erect a crane. surely you would need a crane to make a crane.?
Not necessery. You can make it with Pulley blocks.
Q:Do self lifting tower cranes allow a small swing of the boom in jacking operation?
The upper crossbeam of the jack is connected with the jacking frame, and the lower cross beam is provided with a movable claw, and the lower supporting point can fall on the step of the standard section of the tower body. During lifting, first trim jib and balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.
Q:Hogan Hero Bob Crane was found murdered right? Did they ever solve the case as to who did it,or was it another?
Crane had just spurned his long-time friend John Carpenter. Carpenter was tried for the murder based on blood found in a car he rented, however he was acquitted as a murder weapon could not be found. The case remains officially unsolved.
Q:How do i make an origami flapping crane?
You are asking for a lot but I have seen you request this a number of times, so I will do it...a sucker born. 1. Valley fold the paper in half so it makes a triangle. With the long side held away from you, valley fold the triangle in half again. 2. Lift the top triangle and valley fold it so that its top point meets its bottom point. Unfold the crease you have just made. Put your fingers inside the top triangle, open it up, and flatten it so it forms a square. Turn the paper over and fold and flatten the remaining triangle in the same way. 3. Make sure that the open ends of the paper are pointing down. Valley fold the top layer of both sides in to meet the centre crease. You will now have a kite shape. 4. Valley fold the top point of the kite down and crease well. Unfold the crease you have just made. 5. Open the sides of the kite by unfolding the flaps you made in Step 3. Lift the top layer of the kite's bottom point up so the paper bends at the crease you made in Step 4. Push the outside edges of the paper in to meet the centre line. Then flatten the figure so that you have a long diamond shape. 6. Turn the figure over and fold a kite shape on the remaining side as in Step 3. Repeat Steps 4 and 5 on this side. You will now have a two-sided long diamond. The bottom half of the diamond is split in two. 7. Valley fold the top layer of both bottom edges in to meet in the middle. Turn the figure over and repeat on the other side. 8. To make the crane's neck and tail, valley fold each half of the bottom section out to the sides. Crease well. 9. Unfold the right crease you just made and make an inside reverse fold. Repeat this step on the left side. 10.To form the head, fold down the end of the neck. Unfold this crease and inside reverse fold the head. 11.Hold one of the crane's wings in each hand. Blow hard into the opening on the underside of the figure and gently separate your hands. You crane will puff up and be ready to hang.
Q:Were the anti-gravity machines used to build the pyramids levers, winches and cranes?
Levers winches and cranes all use a counter balance. Its weight that helps move weight in different ways. There is no such thing as an anti-gravity machine.
Q:What are the characteristics of a tower crane?
Classification and characteristics of tower cranesAccording to whether or not there is a walking mechanism, it can be divided into movable tower crane and fixed crane.Mobile tower cranes can be divided into four types: track type, tyre type, automobile type and caterpillar type according to the difference of walking device.The track type tower crane tower body is fixed on the walking underframe, and can be operated on the specially designed track. The utility model has good stability, can walk with load, and has high work efficiency, so the utility model is widely used in construction and installation engineering.The wheel type, the automobile type and the crawler type tower crane have no track device, and they are easy to move, but can not walk with load and have poor stability.The fixed tower crane can be divided into two types: the attached self lifting type and the internal climbing type according to the different installed positions:The attached tower crane can rise as the building rises. It can be applied to the high-rise building. The structure of the crane can only bear the horizontal load from the crane, but it is easy to use, but it occupies more steel structure;The internal climbing crane in the interior of the building (elevator, staircase), up through a set of system and improve the lifting bracket, is complicated, but occupy steel less, do not need to be installed, all the weight and load by building bear.
Q:What to do about an injured Sandhill Crane?
Search for Crane Foundation at Baraboo Wis.
Q:airsoft gun crane stock to full stock switcharoo?
Ok, I can help. The first step is to take the crane stock off. To do so, extend the stock fully. Then, take the tab you use to extend it, and instead of pushing up to extend it, pull it down and slide the stock off. It make take some force. Be careful of any wires and that you don't break them! Next: take the buffer tube out. Take a long phillips head screw driver and stick it down the shaft. Remove the screw. The whole tube should come out. Don't lose the screw! Next: Install your stock. Next: Screw the screw back in to secure the stock. Done! Make sure the wires are still ok and that they are not pinched!
Q:Tower crane; command; gesture
1. prepare (note): arm extension, placed above the head, five fingers stretched out naturally, palm forward remain motionless.2. main hook: single hand natural fist, in the head, touch the head3. auxiliary hook: a hand clenched, small arm to immobile on the other hand, elbow, hand hand touch before.4. hook up: small arm to the side of the upper extension, five fingers natural extension, higher than the shoulder, with the wrist as the axis rotation.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range