Tower Crane QTZ40 CMAX New Condition Crane

Ref Price:
$30,000.00 - 80,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 4T Maximum Lifting Height(M): 110M Rated Loading Capacity: 0.8T
Span: 48M Rated Load Moment: 40T.M

Product Description:

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC4808(QTZ40) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This series of tower cranes, ranging from QTZ40 to QTZ400 has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism. It is original in design, reliable in operation and satisfactory in shape. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency. They can be widely used for the construction of high-rise hotels, residential buildings, high-rise industrial buildings, large-span factory buildings and tower-like buildings like tall chimneys.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 

Tower Crane 4808 40T.M New Mini Crane in China

Tower Crane 4808 40T.M New Mini Crane in China

 

 Images of Tower Crane

Tower Crane 4808 40T.M New Mini Crane in China 

Tower Crane Main Section TC5613 in China

Tower Crane 4808 40T.M New Mini Crane in China

Tower Crane Max. lifting Weight 10T  in China



Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


(0)

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:More than meters of tower cranes must be equipped with red barrier lights at the top
To see the land of tower crane or floating crane... Basically, however, tower cranes over 30 meters above the tower shall be equipped with red light on the top of the tower and jib.
Q:What is the allowable range of vertical deviation for tower cranes?
Previous answers to this question have been made. In the industry standard "construction site inspection of machinery and equipment technical specification" (JGJ160-2008), in the form of mandatory provisions: the tower crane installation height to basic design requirements, the axis of the tower line should be no more than 0.4% of the bearing surfaces of the lateral vertical deviation; after the attachment, the highest attachment point following the vertical deviation should be less than 0.2%. "The basic height of the design requirements" in the "strong regulation", that is, the maximum independent installation height on the site".
Q:What are the characteristics of a tower crane?
Two, according to the structure characteristics of the boom can be divided into the pitching amplitude boom (boom) and trolley jib tower crane (arms).Luffing jib tower crane luffing jib by lifting does not achieve the amplitude, the utility model can give full play to the effective height of the boom, simple mechanism.Trolley jib tower crane is installed on the level of the boom on the track trolley achieve amplitude, the utility model has the advantages of large amplitude range, trolley can near the tower, can load amplitude, the shortcoming is: the boom stress on the structure of complex, high requirements, and the boom and the car must be in the building the upper part of the spire, the installation height should be higher than the roof of buildings 15-20 meters.Three, according to the turret structure, the rotation mode can be divided into lower slewing (turret rotation) and upper slewing (turret not slewing) tower crane.Under the rotary tower crane slewing bearing, balance weight mechanism are arranged on the lower end of the main tower, its advantages are: less bending, low gravity, good stability, convenient installation and maintenance, the disadvantage is the higher requirement to the slewing bearing, installation height is limited.The slewing tower crane is characterized in that the slewing bearing is balanced and the main mechanisms are arranged at the upper end, and the advantage of the utility model is that the lower part of the tower body can be simplified, and the lifting and the adding of the joint can be simplified because the tower body is not turned. The disadvantage is: when the building exceeds the tower height, due to the influence of the balance arm, limit the slewing of the crane, at the same time, the center of gravity is higher, the air pressure increases, the weight increases, so that the total weight of the whole machine increases.
Q:The earthing resistance of tower crane shall not be greater than that of the tower crane
Lightning protection grounding is less than 10, transformer grounding is less than 4, special equipment requirements is less than 1
Q:The rated lifting capacity of a tower crane refers to what is allowed and what is allowed to be divided by the crane
The total quality of the crane rated liftingweightincludes the lifting load and the hook and rope a simplified example, such as the rated lifting weight of 100 tons, the quality of the hook and spreader for 5 tons, the actual quality of the goods can lift 95 tons.
Q:What are the lifting moment requirements for tower cranes?
3, tower crane, such as lifting weight limiter, amplitude limiter, height limiter and load torque limiter limiting device, and travel limit switchestower lights wind instrument, wind clip rail device ladders athletic supporter circlewalkways and railings. The driver's cab is comfortable, easy to operate, with good vision and perfect communication facilities.
Q:When the tower crane is installed in the fertilizer tank,
When the tower crane is installed in the fertilizer tank, is the elevation of the upper surface of the tower crane foundation flat with the elevation of the bottom of the new building? Or lower than the trough mark
Q:Lifting tower crane tower more than 45 meters, the demolition cost and how to adjust the field Sinotrans transportation fees?
Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
Q:Tower crane driver simulation exam which website?
This also needs to imitate exam? When you go to the training, the teacher will read the outline. The driver of the tower exam is nothing more than the operation and safety of knowledge.
Q:How many meters does the tower crane installation height require expert proof?
Circular of the Ministry of housing, urban and rural construction on Issuing the measures for the safety administration of sub hazardous and sub divisional projectsAnnex No. [2009]87 [Annex two]"More than a certain size of the risk of larger sub sub project scope."Three, lifting and installation, demolition works(1) lifting projects with unconventional lifting equipment and methods with single lifting weights of 100kN and above.(two) lifting equipment installation with lifting weight 300kN and above; demolition work of climbing crane within height 200m and above.The installation and disassembly of the tower crane in accordance with the provisions of the above provisions shall be verified by the expert panel.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range