Tower Crane QTZ100 VFD Technical Control

Ref Price:
$30,000.00 - 80,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 10T Maximum Lifting Height(M): 200M Rated Loading Capacity: 1.6T
Span: 60M Rated Load Moment: 100T.M

Product Description:

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC6016(QTZ100) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This series of tower cranes, ranging from QTZ40 to QTZ400 has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism. It is original in design, reliable in operation and satisfactory in shape. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency. They can be widely used for the construction of high-rise hotels, residential buildings, high-rise industrial buildings, large-span factory buildings and tower-like buildings like tall chimneys.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane 

Tower Crane QTZ100 VFD Technical Control

Tower Crane QTZ100 VFD Technical Control

Tower Crane QTZ100 VFD Technical Control

 

 


 

 Images of Tower Crane

Tower Crane 4808 40T.M New Mini Crane in China 

Tower Crane Main Section TC5613 in China

Tower Crane 4808 40T.M New Mini Crane in China

Tower Crane Max. lifting Weight 10T  in China



Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


(0)

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What kind of bodies are tower cranes made of?
First, the working mechanism of tower cranesThe working mechanism of tower crane is usually composed of lifting mechanism, luffing mechanism, slewing mechanism, hydraulic jacking mechanism and running mechanism.The hoisting mechanism to realize heavy vertical up and down movement; luffing mechanism and slewing mechanism to achieve weight moving in two horizontal directions; hydraulic lifting mechanism of standard section, increase or decrease, so as to increase or decrease the tower; range of weights can achieve walking mechanism in tower crane and force of arbitrary space motion.
Q:what is crane rigging?
Crane rigging usually refers to the cable that actually is attached to a cylinder in the crane and the motor turns the cyl. and either take up cable or vice versa. The cable is reeved thru the long (arm) boom of the crane and thru pulleys and then at the end of the cable there is a hook.
Q:In the Legend of Sleepy Hollow Ichabod Crane has come from?
In 1799, young constable Ichabod Crane is sent from New York City, New York to the fledgling settlement of Sleepy Hollow to investigate a series of ghoulish murders.
Q:Military Action movie with bunch of cranes at the end?
Cranes like construction equipment or Cranes like the birds?
Q:How do Crane Motors Work?
I'm not 100% familiar with this but this should be pretty close to the answer. Simple/standard crane motors work by applying power first through a rotating steel shaft into a gearbox. The gearbox allows the gearing ratio to be changed (to trade rotation speed for torque or torque for rotation speed). Another steel shaft carries the power out of the gearbox, again through rotation, to a spindle (think big thimble) around which steel cable is wrapped.
Q:How to choose tower crane in engineering, such as arm length and lifting weight?
First of all, your engineering structure is reinforced concrete Or steel? What's the weight of the lift? The lifting capacity of tower cranes should meet the needs. Generally speaking, steel structure hoisting, tower crane of the largest lifting weight and gravity moment should be large; hanging steel reinforcement of a smaller can.Secondly, the boom length should be covering the scope of construction (can also be arranged to meet several sets of crane lifting coverage). But in the 360 level luffing jib range, can not have obstacles (other cranes and buildings), and the boom and the distance between them (below) should be not less than 2m.Third, in the construction project is relatively high, the site is relatively small, you can mount the internal climbing tower crane. Building covers a large area, sometimes one can solve the problem. Of course, it is more troublesome to disassemble and lift inside, but the standard section used is less and the cost can be lower.
Q:Is Air Crane a Trademark-able name for a Rigid Airship used primarily for moving heavy objects from above?
It's okorder.com/.... Judging by the fact that a Google search results in many different companies/aircraft that incorporate the term 'air crane', I would say so. But it seems that the term is usually associated with heavy-lift rotorcraft. It also appears that the term is in the public domain. So, you could call it 'JV's Air Crane' or something like that. I've Googled SkyLift, AirLift, Zeplift- all taken However, DiriLift, DirigiLift,and ZepCrane yielded no results. *I relinquish all rights to these terms
Q:Is it difficult to test tower cranes?
A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission
Q:how do calculate Gear box toque & speed in EOT crane?
Your okorder.com/... contact them with your enquiry. You must include Model and anticipated loads as that determines torque applied. Seed is operator dependent for safe operation.
Q:Brief introduction of ten no hanging criterion for tower crane operation
4, buried objects do not pull the crane; 5, cable-stayed holding objects not hanging 6, the slings and objects; rickety bundle does not meet the safety requirements to crane; 7, vehicle weight hanging directly processed when not hanging;

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range