Tower Crane Parts Brand New Tower Crane TC6024 sold on Okorder

Ref Price:
$50,000.00 - 150,000.00 / unit
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane Price Brand New Tower Crane sold on Okorder 

 

Main Features of Tower Crane

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Parts Brand New Tower Crane TC6024 sold on Okorder

Tower Crane Parts Brand New Tower Crane TC6024 sold on Okorder

Tower Crane Parts Brand New Tower Crane TC6024 sold on Okorder

 

Tower Crane Parts Brand New Tower Crane TC6024 sold on Okorder

Tower Crane Parts Brand New Tower Crane TC6024 sold on Okorder

Tower Crane Parts Brand New Tower Crane TC6024 sold on Okorder

Tower Crane Parts Brand New Tower Crane TC6024 sold on Okorder

Tower Crane Parts Brand New Tower Crane TC6024 sold on Okorder

Tower Crane Parts Brand New Tower Crane TC6024 sold on Okorder

Tower Crane Parts Brand New Tower Crane TC6024 sold on Okorder

Tower Crane Parts Brand New Tower Crane TC6024 sold on Okorder

Tower Crane Parts Brand New Tower Crane TC6024 sold on Okorder

Tower Crane Parts Brand New Tower Crane TC6024 sold on Okorder

Tower Crane Parts Brand New Tower Crane TC6024 sold on Okorder

Tower Crane Parts Brand New Tower Crane TC6024 sold on Okorder

FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

 

Advantages

1 sincere

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.

3 quality

 CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:can anyone give me some info on how to become a crane operator?
I am sorry I do not know where are you from as different country might have different requirement on getting a Crane Operator licence. Anyway, I believe the basic is the same: You need to attend a theory class on crane operations which usually include topics like design theory of cranes, slinging and lifting, signalling. After this, there will be a practical session to test your understanding and practical operations on an actual crane in the training center's facility. Good Luck and May You Attain You Dream :)
Q:crane info?
Mounting a crane on your truck wont need any documents. Operating the crane you mounted is a different story. You need to have a number 8 on your license restriction code. For the modification of your truck by mounting the crane, you need to have it inspected and approved by the authorised agency for safety reasons also. Please be advised that your plan may cause some serious physical injury to yourself and others as well..
Q:How is a Crane built upwards and how is it dismanteled ?
A tower crane is usually assembled by a telescopic crane of smaller lifting capacity but greater height and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will sometimes be lifted to the roof of the completed tower to dismantle the tower crane afterwards. A self-assembling tower crane lifts itself off the ground using jacks, allowing the next section of the tower to be inserted at ground level.
Q:what are the materials and steps for making an electromagnetic crane?
I am assuming you mean a low power, miniature crane. You will want to wrap a iron object (a nail should work for light objects) in electrical wiring, the more times the better. Make sure you have a long length of wire after wrapping it around the iron object. Now, attach a rope to the iron object, this will be used to raise and lower it. The length of the rope has to be less than the length of the wires. Now, inside the crane have a battery. The stronger the battery, the stronger the electromagnet. Now, after connecting one of the wires to the battery, connect another one to a switch, then connect then switch with more wiring to the battery. This will turn the crane's claw on and off. The next part is up to you. If you want to be able to raise and lower the magnet, attach the rope to an axel and spin the axel to raise or lower the magnet. If you want to turn the crane, you need to place the arm on a swivel axis. Finally, to bring the magnet closer or farther, you will need a way to raise the arm, bringing the tip of the arm closer to above the center of the crane. I suggest you google some picture of cranes to understand this better.
Q:Another question about origami cranes...?
It okorder.com/ The animations on this site are good, showing what you have to do, without hands in the way.
Q:Which is the main basis for the disassembly and assembly process planning of tower cranes?
.0.11 tower cranes should be prepared before the installation of special construction program, and should include the following contents:1 project overview;2 installation location, plane and elevation;3 types of tower cranes and technical parameters of performance;4 basic and attachment device settings;5, climbing conditions and adhesion nodes detail;6 installation sequence and safety quality requirements;7 weight and suspension position of main mounting parts;8 installation of auxiliary equipment type, performance and layout;9 power settings;10 construction personnel allocation;11 rigging and special tools;
Q:How Do You Build A Hydraulic Crane?
Get your answer from here
Q:In construction - how do they normally get cranes to the top of buildings?
The big tower cranes you see on high rise structures actually....lift themselves. Their bases sit inside square lattice support structures and can climb them. When they get to the top of the structure they raise two more half squares that are bolted together around the base of the crane and the crane can then climb into the higher structure. The process is repeated until they get to the height limit of the crane. It's pretty amazing. Sometimes the crane base remains at the bottom, but sometimes, they close the floor below and remove the base that is no longer used, and just march the whole crane up the floors. Smaller cranes can be lifted by mobile cranes that go elsewhere, but the big ones use the method above.
Q:The arm of a crane at a construction site is 17.0 m long, and it makes an angle of 13.5◦ with the horizantal.?
I don't know if this is a question you got out of a book, or something you are trying to apply on a jobsite, but I would hate to see you try and use this approach with expensive equipment and innocent lives in the balance. Learn to use the crane charts. They account for many factors, including the weight of the boom, the tipping moment, the strength of the ropes, the engine's power, and the structural integrity of the boom.
Q:who invented the origami cranes?
Origami okorder.com

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range