Tower Crane of Jing Kui Model Number QTZ5610

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

QTZ5610 Description

Feature: Tower Crane

Condition: New

Rated Loading Capacity: 6

Rated Lifting Moment: 630

Max. Lifting Load: 6

Max. Lifting Height: 150

Span: 56

Place of Origin: China (Mainland)

Brand Name: JINKUI

Model Number: QTZ63(5610)

Warranty: one year

After-sales Service Provided: Engineers available to service machinery overseas

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

QTZ5610  Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

QTZ5610  Specification

 Tower Crane of Jing Kui Model Number QTZ5610

QTZ5610  Pictures

 

Tower Crane of Jing Kui Model Number QTZ5610

Tower Crane of Jing Kui Model Number QTZ5610

Tower Crane of Jing Kui Model Number QTZ5610

QTZ5610 FAQ

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: What is the function of the monitor?

A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.


Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


 

 

 

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q:What is the difference between a tower crane and a jack up tower crane?
The fixed tower crane means lifting the foundation of the tower body on the foundation or structure through the connecting piece.
Q:What are the safety devices for the horizontal arm self lifting tower cranes?
(1) the lift height limit position limiter must be able to stop lifting motion immediately when the lifting device is raised to the 8OOmm at the lower end of the boom. For luffing cranes, lift the top of the hook to the lower end of the frame 500mm. The lifting movement must be stopped immediately. (2) lifting moment limiter and maximum weight limiter; when lifting torque reaches 90% of its rated value, the lifting torque limiter shall be able to issue an acoustic or red light to indicate the alarm. When the lifting torque exceeds its rated value and reaches 108% of the rated value, the lifting direction and outward direction shall be stopped. If the weight and amplitude indicator are set, the numerical value should be correct, clear and eye-catching. The digital error shall not exceed 5% of the indicated value. When the lifting weight exceeds the maximum weight, maximum lifting weight limiter should emit light or sound alarm, when the load exceeds the maximum weight of 6%, should stop to enhance the direction of movement, but to allow institutions towards the down direction.
Q:Tower crane 4 how to change the rate of 2 magnification, how to change, say detailed points
There is a magnification pin on the hook group. When the magnification pin is removed, the pulley will automatically slide to the lifting trolley.
Q:Do self lifting tower cranes allow a small swing of the boom in jacking operation?
The upper working structure of the attached tower crane is connected with the jacking sleeve frame, and a jack jack is mounted on the top lifting jacket frame.
Q:How to improve the stability of tower crane
Phosphating coating of steel wire rope, give priority to the use of manganese or zinc manganese phosphating, and smooth steel wire rope production process comparison, just add the last bonderizing process, steel wire, wear resistance and corrosion resistance is greatly improved, the use of the wire without direct phosphating cold twisted steel wire rope.
Q:What are the types of common tower cranes?
(3) according to erection methodNon self erecting tower crane: a tower crane assembled and erected by other lifting equipment.Self erecting tower crane: a tower crane that relies on its own power unit and mechanism to realize the transition between the transportation state and the working state.(4) according to variable amplitude methodThe trolley jib tower crane lifting trolley along the tower crane luffing boom for operation.Boom luffing tower crane: luffing tower luffing luffing luffing crane.Folding tower crane: tower crane which can be bent by boom according to the needs of lifting operation. It can also have the performance of luffing and luffing.
Q:What measures should be taken to make tower cranes stable?
Increase deadweight and weight.Crane wire rope is phosphate coated steel wire, galvanized steel wire, stainless steel wire rope or coated steel wire rope, the use of atmospheric environment, patented technology to produce manganese phosphating coating of steel wire rope has the longest lifespan, heavy corrosion environment optimization of hot galvanized wire rope - double coating phosphating, phosphating coating to improve the wear resistance and corrosion resistance of steel wire that is not easy to wear and corrosion resistance is to improve the working life of the plain steel wire rope will be completely eliminated.
Q:What kind of personnel should be installed for the tower crane installation and disassembly?
According to GB specifications:2.0.3 the installation and disassembly of tower cranes shall be provided with the following personnel:1. The project and the safety supervisor and the mechanical management personnel who have the safety inspection certificate;
Q:How many motors does the ZOOMLION TC6013A-6 tower crane use?
Model: YZRDW225M-4/8 power: 24/24KW speed: 1420/725r/minDirect search {ZOOMLION QTZ80 (tc6013) _ crane Manual Part 1 (Part Two)}, can also be found.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range