Tower Crane of Jing Kui Model Number QTZ5010

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

QTZ5010 Description

Quick Details

Feature: Tower Crane

Condition: New

Rated Loading Capacity: 5

Rated Lifting Moment: 630

Max. Lifting Load: 5

Max. Lifting Height: 121

Span: 50

Place of Origin: Shandong, China (Mainland)

Brand Name: JINKUI

Model Number: QTZ5010

Warranty: one year

After-sales Service Provided: Engineers available to service machinery overseas

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

QTZ5010 Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

QTZ5010 Specification

 Tower Crane of Jing Kui Model Number QTZ5010

QTZ5010 Pictures

 

Tower Crane of Jing Kui Model Number QTZ5010

Tower Crane of Jing Kui Model Number QTZ5010

Tower Crane of Jing Kui Model Number QTZ5010



QTZ5010  FAQ

Q: What kind of steel used for tower crane?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.


Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


Q: What is the function of the monitor?

A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.




 

 

 

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the allowable range of vertical deviation for tower cranes?
Previous answers to this question have been made. In the industry standard "construction site inspection of machinery and equipment technical specification" (JGJ160-2008), in the form of mandatory provisions: the tower crane installation height to basic design requirements, the axis of the tower line should be no more than 0.4% of the bearing surfaces of the lateral vertical deviation; after the attachment, the highest attachment point following the vertical deviation should be less than 0.2%. "The basic height of the design requirements" in the "strong regulation", that is, the maximum independent installation height on the site".
Q:What are the characteristics of a tower crane?
Four, according to the different installation methods of cranes, can be divided into folding transport, self erection of the rapid erection of tower cranes and the need to use the auxiliary machine assembly and disassembly of tower cranes.Can set up their own fast loading crane are small and medium slewing tower crane, mainly used for short duration, low buildings move frequently, the main advantage is to improve work efficiency, save installation cost, save time and labor and material, disadvantage is the complicated structure, large amount of maintenance.A tower crane that needs to be disassembled and assembled by an auxiliary machine is mainly used in middle and high rise buildings, with large working range and large lifting capacity. It is the main type of construction site at present.Five, according to whether the spire structure, can be divided into flat head tower crane and tower tower crane.Tower crane is a new type of tower crane is developed in recent years, its characteristic is the tower cap and the rod part before and after the cancellation in the structure of the original tower crane on the enhanced structural strength of the arm and balance arm, arm and balance arm is directly connected, the utility model has the advantages of:1 、 the whole machine is small in size, easy to install and safe, reduce transportation and storage costs;2, the boom of tolerance and good performance, uniform stress, small damage on the structure and connection part;3, component design can be standardized, modular and interchangeable, reduce equipment idle, improve investment efficiency.It is in the same type of tower crane tower crane head Zhongping slightly higher prices.
Q:What parameters are lifting machines called large equipment? 200
General purpose gantry cranes: MG, 440t, MG, 360t, MG, 450t, Me, 360t, ME, 900tGeneral purpose bridge crane: QD, 350t, QD, 400t, QD, 450t, QD, 390t, QD, 330t, QE, 350t, QE, 330tThe above tonnage is now recognized by the state as a large lifting machine.
Q:Notice of tower crane
Installation condition of 3.2 tower crane3.2.1 tower crane has special equipment manufacturing license, product certification, manufacturing supervision and inspection certificate, the tower crane manufactured abroad should have product certification, and has been in the construction administrative departments for registration.3.2.2 tower cranes shall be of complete structure and conform to the provisions of GB5144 "safety regulations for tower cranes".3.2.3 under the following circumstances, tower cranes are not allowed to use:If the state has been eliminated from the designated period of time, exceeding the prescribed service life assessment, the safety devices and safety facilities can not meet the safety and technical standards of the state or industry; there is no complete safety technical file.3.2.4 tower cranes must be maintained and fully checked before they are installed. Structural parts with visible cracks, severe corrosion, overall or partial deformation, connecting shafts (pins), Kong You, severe wear and tear should be repaired or replaced, in accordance with the provisions of the installation.3.2.5 tower crane foundation should meet the requirements of the use manual, the carrying capacity of the foundation must meet the requirements of tower crane design, installation should be carried out before the hidden project acceptance, qualified before installation. Slope and drainage facilities should be built around the foundation.The track foundation and track laying of 3.2.6 walking tower crane shall be carried out according to the instruction manual and shall comply with the provisions of GB5144.
Q:What should be included in the disassembly plan of the tower crane?
- 3 - tower crane demolition special program should include the following1. General situation of engineering;2, the tower crane position of the plane and elevation;3. Disassembly order;4, unit weight and hanging point position;5, remove the auxiliary equipment types, performance and arrangement position;6, the power set;7, the construction personnel configuration;8. Rigging and special tools;9, major sources of risk and safety technical measures;10, emergency plans, etc..Note: (1) the special construction plan for the installation and disassembly of tower cranes shall be examined and approved by the units, technology, safety, equipment and other departments, and shall be implemented after approval by the supervisor.(2) the contents and requirements of the special construction scheme for tower crane installation;Compiled from the "building construction tower crane installation, use and disassembly safety technical regulations" JGJ196-2010, please refer to the implementation. Attached: 1, Zhifu Wanda Plaza Tower Crane installation program 2, Muping District Cultural Center project PT7528 tower crane demolition program
Q:The role of slewing limiter in tower cranes is limited
The crane or winch motor winding rope arranged on the roller loose, hoisting large demolition, resulting in the large load fast rope rope cut into bundles, causing fast rope severe jitter, vulnerable to instability, the results often appear to work and stop dangerous, can not stop the embarrassing situation.
Q:Tower crane; command; gesture
1. prepare (note): arm extension, placed above the head, five fingers stretched out naturally, palm forward remain motionless.2. main hook: single hand natural fist, in the head, touch the head3. auxiliary hook: a hand clenched, small arm to immobile on the other hand, elbow, hand hand touch before.4. hook up: small arm to the side of the upper extension, five fingers natural extension, higher than the shoulder, with the wrist as the axis rotation.
Q:Tower crane 5610 why is it called QTZ63?
Strictly speaking, 5610 should be called TC5610;At present in the domestic type mark in two ways: one is QTZ++, one is TC++, for example, such as QTZ80, Q is the first letter of Chinese "play", T is the first letter of Chinese "tower", Z is the Chinese "from" the first letter is self lifting tower crane 80, the unit is 80 tons of tons of rice, rice is a concept called lifting torque, rated torque, maximum rated product weight and maximum range; as in the 13.4 meters lift 6 tons, the product is 80 tons of rice;Such as: TC6010, T is the English TOWER, C English CRANE, TC tower crane is English shorthand, the 60 refers to the jib 60 meters long, 10 refers to the boom in the front 60 meters lift 1 tons, and TC5513 refers to the boom length of 55 meters, the front suspension of 1.3 tons. TC tagging is an international universal annotation. Domestic commonly used models areQTZ series: 40, 63, 80, 100, 125, 160,200, 250, 315
Q:What are the main parameters of a tower crane?
Generally speaking, the main parameters of the tower crane are:Maximum amplitude unit MMaximum lifting height, unit MMaximum lifting torque unit KN.mMaximum lifting speed unit m/minMaximum lifting unit tRotational speed unit r/minVariable speed unit m/min or o/minWalking speed per unit m/minMotor power unit w......Please refer to the product manual.
Q:What is the free height of a tower crane?
General small 40 tower, its free height is about 30 meters. The 63-80 tower is usually about 45 meters. The 125 tower is about 47-50 meters.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range