Tower Crane of Jing Kui Model Number QTZ100(5615)

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

QTZ100(5615)  Description

Feature: Tower Crane

Condition: New

Rated Loading Capacity: 8T

Max. Lifting Load: 8T

Max. Lifting Height: 150

Span: 56

Place of Origin: Shandong, China (Mainland)

Brand Name: JINKUI

Model Number: QTZ100(5615)

Warranty: one year

After-sales Service Provided: Engineers available to service machinery overseas

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

QTZ100(5615)  Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

QTZ100(5615)   Specification

 Tower Crane of Jing Kui Model Number QTZ100(5615)

QTZ100(5615)  Pictures

Tower Crane of Jing Kui Model Number QTZ100(5615)

Tower Crane of Jing Kui Model Number QTZ100(5615)

Tower Crane of Jing Kui Model Number QTZ100(5615)

QTZ100(5615)  FAQ

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


Q: What is the function of the monitor?

A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.




 

 

 

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How did the tower crane rise on the construction site? Fifteen
It's not a cable, it's a steel bar! Scaffolding
Q:QTZ63 (Q5610) tower crane power, how many power parts, name, model specification, product number, date of appearance
All the details of the equipment are availableAs for power, it depends on the specific configuration of the frequency conversion and non frequency conversion will not be the same
Q:What is the power of a tower crane? Five
TC7525-16D switchboard power 80KWTC5610-4 switchboard power 34KW.TC6015A-10E switchboard power 71.5KWThe other two types have not been touched and will not be answered. I'm sorry
Q:What are the safety devices for tower cranes?
Safety device for tower crane(1) lifting moment limiter, tower crane in lifting objects, the lifting radius and weight of the crane product is a constant number. According to this principle, a lifting torque limiter has been developed, the main function is to prevent overloading of the safety devices. The moment limiter only acts as a protection against the overload torque in the vertical vertical plane of the tower crane arm, and can not protect the tilting accidents caused by oblique hanging, wind load, rail inclination or collapse, etc..(2) weight limiter weight limiter's role is to protect the goods lifting weight does not exceed the maximum allowable weight of tower crane, tower crane is used to prevent the load exceeds the maximum rated load, avoid mechanical damage accident.
Q:Tower crane; command; gesture
8. the hook falls slightly: the arm extends to the side, front and bottom, with the angle of the body about 30 degrees, palm down, with the wrist as the axis, repeatedly swinging downward palm.9. hook horizontal move slightly: small arm toward the side of the natural extension, fingers together, palms outward, in the direction of the load should be running, repeat the slow horizontal movement.10., micro range: double arm bent, extended to one side, five fingers straight, palms relative, and the distance between the load and the distance to move.11. directions of landing: five fingers unbend, point out the position where the load should fall.12. stop: small arm horizontally placed in front of the chest, fingers outstretched, palms down, horizontal swing to the side.13. emergency stop: two small arm level placed in his fingers outstretched, palms downwards, while waving to the level of both sides.14. end of work: stretch your hands and fingers and cross over at the front of your forehead.
Q:Equipment safety of tower crane
The boom of a tower crane is divided into two types: horizontal and compressed arms. When the movable arm is horizontal, the carrier car runs along the horizontal arm with variable amplitude and amplitude, and the movable arm is longer, but the boom has a larger deadweight. The arm for the strut type when the tractor boom luffing mechanism pitch amplitude, amplitude motion than horizontal smooth, but its relatively small weight.The weight of a tower crane varies with its amplitude. The product of the weight and the amplitude is called the load torque, which is the main technical parameter of the crane. Through the rotary mechanism and slewing tower crane, lifting height, rotation and walking the inertial mass, so it needs to have good control performance, especially the lifting mechanism can fast, slow, heavy and light load installation fretting. In addition to the general use of resistance speed regulation, but also often use eddy current brake, FM, pole change, SCR and mechanical and electrical joint speed regulation. When the crane in the layout to drawing, especially in real estate development area, residential buildings, such as tower crane, but also to consider the safety distance of adjacent tower crane, two in horizontal and vertical direction to ensure the safe distance of not less than 2m, the adjacent tower crane tower crane and interference can not occur. Try to ensure that the tower crane in the wind is too large to be free of rotation. The safe distance between the rear arm of tower crane and adjacent buildings shall be no less than 50cm. The safe distance between tower crane and power line meets the requirement.
Q:How to install the jack up tower crane 30How to install the jack up tower crane?
Looking for technical personnel to install, you fuck what heart?.
Q:What kind of bodies are tower cranes made of?
Tower crane is composed of three parts: working mechanism, metal structure and power unit, and control system. The composition and function of the three parts are outlined below.
Q:How much height should tower crane work at M?
Try to ensure that the tower crane in the wind is too large to be free of rotation. The safe distance between the rear arm of tower crane and adjacent buildings shall be no less than 50cm. The safe distance between tower crane and power line meets the requirement.
Q:Tower crane driver simulation exam which website?
This also needs to imitate exam? When you go to the training, the teacher will read the outline. The driver of the tower exam is nothing more than the operation and safety of knowledge.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range