Tower Crane of Chang Li Model Number QTZ63C (5211)

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
888 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

QTZ63C(5211)  Description

Feature: Tower Crane

Condition: New

Application: Buliding Construction

Rated Loading Capacity: 1T

Rated Lifting Moment: 400KN.M

Max. Lifting Load: 5T

Max. Lifting Height: 135m

Span: 47m

Place of Origin: Henan, China (Mainland)

Brand Name: YUJIE

Model Number: QTZ63C(5211)

Certification: CE,ISO,IAF

Warranty: 15 months

After-sales Service Provided: Engineers available to service machinery overseas

Color: as your request

Materials: Q235 for tower crane

Angle: Squire Steel and Angle for tower crane

QTZ63C(5211)  Features

1. Export to more than 20 countries with CE/ISO/GOST Certificates.

2. Impeller blasting/rust protection paint

3. Advanced painting process

4. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

5. New designed mast, can be used to Internal and external climbing tower crane

6. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

7. Engineers available to service machinery overseas.   

QTZ63C(5211)  Specification

 Tower Crane of Chang Li Model Number QTZ63C (5211)

QTZ63C(5211)  Pictures

Tower Crane of Chang Li Model Number QTZ63C (5211)

Tower Crane of Chang Li Model Number QTZ63C (5211)

Tower Crane of Chang Li Model Number QTZ63C (5211)

QTZ63C(5211)  FAQ

Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.


Q: What is main advantage for manufacturing construction machinery?

A: Our machinery main advantages mainly include: 1. National-level Research Academy for various building equipment for more than 30 years’ experience; 2. Complete quality control system; 3. Nearly 20 years experiences in manufacturing industries; 4. Over 50 engineers along with 6 local partner companies  providing worldwide after-sales service;


Q: What is tower crane?

A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

 

 

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is it difficult to test tower cranes?
A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission
Q:Construction tower crane operator certificate expires, how to verify?
Six, related requirementsEach enterprise shall, according to the notification requirements, arrange the personnel engaged in the work of this unit, and invite every unit to earnestly examine and clean up, and those who have not obtained the certificate will sign up for the training. The certificate into the industry qualification management, obtain the job qualification certificate, can engage in the corresponding work, and as an important basis for certification.Seven, registration requirements and locationsStarting from now on, please bring your ID card copy and one inch registration photo for you when you sign up for two. Fill in "Chongqing construction crane operator qualification table", the applicant's employer to the District Construction Committee, post training center application.Contact: He Zongfang, Hu Baofeng, zip code: 401120Tel: 67376688 Fax: 67800098E-mail:ybjsgp@163.comHttp://www.cqybjs.com (Yubei construction information network)Hereby notifyChongqing Yubei District construction post training centerFebruary 20, 2008
Q:All types of jack up cranes. How is the maximum lifting torque converted?
The moment of the tower crane is set up by the factory, and can not be changed. How do you want to convert it?If the nominal torque is converted to kn tons, 1 tons is equal to 9.8 kn.
Q:Tower crane attached concrete pump can be? Are there any state regulations?
Yes, but consider the direction of force. ZOOMLION began production machine.
Q:Under what circumstances are winches used and under what circumstances tower cranes are used?
First of all, what you say should be a derrick or a Longmen frame. In any case, the derrick or tower crane should first meet the construction requirements, then the economy and safety requirements. To meet the construction requirements, it is much better to choose the derrick, of course, economically and safely. Derrick is a simple nonstandard equipment. It is easy to install, use and disassemble. It has low running cost and less safety risk than tower crane. The derrick is suitable for construction under 30 meters or less, especially for multi storied buildings and single pieces. The volume and quality are not more than 2 tons.
Q:What does "automatic tower crane" mean less than 100 tons per metre?
The crane must not exceed the maximum lifting capacity when working! Otherwise, there will be danger.
Q:Which is the main basis for the disassembly and assembly process planning of tower cranes?
.0.11 tower cranes should be prepared before the installation of special construction program, and should include the following contents:1 project overview;2 installation location, plane and elevation;3 types of tower cranes and technical parameters of performance;4 basic and attachment device settings;5, climbing conditions and adhesion nodes detail;6 installation sequence and safety quality requirements;7 weight and suspension position of main mounting parts;8 installation of auxiliary equipment type, performance and layout;9 power settings;10 construction personnel allocation;11 rigging and special tools;
Q:How to install the jack up tower crane 30How to install the jack up tower crane?
Since it is self lifting, as the name suggests, it is on its own power that no other crane can rise. It has a special elevated section, a hydraulic device, the upper section rises, the middle empty time section, with his arm to be added to the festival hanging near the artificial it fixed, so that a section of the rising of the. Is to support themselves, and then in the middle plus standard section.
Q:About tower crane torque limiter with 4 limit switches, each play a role, thank you
Lifting weight limiter: limit maximum lifting weight;Torque limiter: limit the maximum lifting torque;Height limiter: limits the maximum and minimum position of the hook lifting and lowering;Amplitude limiter: limit the lifting trolley in the boom on the outside, the inside position;Slewing limiter: limit of up to the number of rotating ring arm;
Q:What is the rental price of a tower crane? General site rental more, but also buy more? Ask the industry for an answer?
Is the site of the tower crane is not, the crane company specializes in the construction site is rented, the price range depends on the length of your period, due to demolition of the problem, I am not a professional, but I am working at the site, only know so much

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range