Tower Crane New Building Machine in China

Ref Price:
$40,000.00 - 80,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Structure of Tower Crane TC7034 Description


Feature: Tower Crane                          Condition: New                               Application: Construction           Max.Lifting Load: 12T                            Max Tip Load:3.4T                          Independent Height:50M

Max Lifting Height: 200M                       Span: 70m                                      Certification: CE,ISO

Place of Origin: China(Mainland)          Model Number: TC7034         

 

Packaging & Delivery of Tower Crane TC7034


Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Main Feature of Tower Crane TC7034


 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.

 


Tower Crane TC7034 Specifiction


 

Images of Tower Crane

 

 

FAQ of Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:When the tower crane top height is more than meters
Three, lifting and installation, demolition works(1) lifting projects with unconventional lifting equipment and methods with single lifting weights of 100kN and above.
Q:What is tower crane? What are the types and features?
[definitions]Tower crane (tower crane) is called tower crane, also known as tower crane, originated in Western europe. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
Q:Why do tower cranes need to be fabricated?
The fatigue test data show that the fatigue life of the phosphating coating of steel wire rope is about 3-4 times the same structure light steel wire rope (laboratory comparable conditions) with the research on the wear resistance of phosphating, and greatly enhance the possibility of. Manganese phosphating is bonderizing, can solve the wear problems of wire rope used in the process, according to the current market situation of wire rope, manganese phosphating coating of steel wire rope price is higher than that of plain steel wire rope, and prolonging the service life of much higher than the rate of price increase, so the phosphating coating steel wire rope daily use fee is only plain steel wire 30-45% rope, the use of lower cost, higher cost, smooth steel wire rope is eliminated. For reference only
Q:What are the requirements for jack up and plus section of jack up tower crane?
Shall conform to:1, tower crane has not reached the standard free height or attachment, not to the standard suspension height;2. The standard section of tower crane jacking must be the size of the original production;3, tower crane jacking work must be carried out by the professional installation team;4 tower crane jacking up, the wind must be less than four.Answer the 1 floor:The height of the self elevating tower crane is built up by other cranes like building blocks.
Q:How do tower cranes rise?
The weight and concrete foundation shall be made in advance and marked, and the ground ground endurance shall be no less than 20T per square meter. The chassis and standard sections are then assembled on this basis. The standard section of tower crane is the main part of the main part of tower crane. It is also the main role of heightening the height of tower crane". In the construction process, tower crane accompanied by the rise of buildings, naturally need to heighten. When the tower is hoisted, the upper frame is raised upwards with the jack up, so that there is a space between the tower body and the frame, and the standard section of the tower body is installed in the space. In this way, the purpose of the tower crane is realized.
Q:Under what circumstances does a tower crane require third party testing?
New clothes, relocation or transformation should be examined by the quality and Technical Supervision Bureau
Q:Climbing process of an internal climbing tower crane
There are two kinds of climbing mechanisms: hydraulic and mechanical. The hydraulic climbing mechanism consists of a ladder ladder, a hydraulic cylinder, a climbing beam and a support leg. The climbing ladder is composed of an upper and a lower bearing beams, separated by two stories, which are fixed on the wall or side beam of the cylindrical structure when the work is used, and both sides of the ladder stand are provided with steps. The load bearing beam corresponds to the four main limbs of the crane tower, and is equipped with 8 guide rollers, which plays a guiding role when climbing.
Q:What windproof devices should be set up for crane work?
2. torque limiterTorque limiter is an integrated safety protection device for jib cranes.We know that an arm crane represents the load condition from the moment of gravity. The load moment value is made up of product weight, amplitude decision, amplitude value is determined by the product, the boom of the crane arm length and angle cosine so that the crane is overloaded, in fact are the weight, arm length and arm angle limit, while also considering the working conditions and other parameters as well as constraints effect of control is more complex.At present, the widely used microcomputer controlled torque limiter can synthesize various situations and solve this problem better. The torque limiter consists of a load detector, an arm length detector, an angle detector, a work condition selector, and a microcomputer. When the crane to enter the working state, the computer will detect the signal input parameters of the actual working state, after operation, amplifying and processing, and advance into the rated load moment value, and at the same time in the display to display the corresponding actual values. When the actual value reaches the rated value of 90%, it will issue a warning signal when the actual value exceeds the rated load when the alarm signal, at the same time the crane to stop dangerous direction (lifting, boom, arm and rotary movements continue to drop).
Q:What is the inspection certificate for tower cranes?
Inspection certificate of tower crane must have two certificates:1, the manufacturer issued its own "product quality certificate"2. The product quality supervision and inspection certificate issued by the Technical Supervision Bureau
Q:What type of tower crane does not include tower crane in variable amplitude mode?
Tower crane, tower crane.Tower crane according to its different types, there are the following classification methods.(1) divided by structure type of fixed tower crane by connecting a fixed tower in the foundation or structure, tower crane lifting operation.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range