Tower Crane Max Section Weigt 10 Ton QTZ160

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 10T Maximum Lifting Height(M): 200M Rated Loading Capacity: 2.4T
Span: 60M Rated Load Moment: 160T.M

Product Description:

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC6024(QTZ160) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This series of tower cranes, ranging from QTZ40 to QTZ400 has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism. It is original in design, reliable in operation and satisfactory in shape. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency. They can be widely used for the construction of high-rise hotels, residential buildings, high-rise industrial buildings, large-span factory buildings and tower-like buildings like tall chimneys.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane 

Tower Crane TC6024 60M Working Range for Sale

Tower Crane TC6024 60M Working Range for Sale

Tower Crane TC6024 60M Working Range for Sale

 

 Images of Tower Crane

Tower Crane 4808 40T.M New Mini Crane in China

Tower Crane Main Section TC5613 in China

Tower Crane 4808 40T.M New Mini Crane in China

Tower Crane Max. lifting Weight 10T  in China

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is it difficult to test tower cranes?
A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission
Q:What is the power of a tower crane? Five
TC7525-16D switchboard power 80KWTC5610-4 switchboard power 34KW.TC6015A-10E switchboard power 71.5KWThe other two types have not been touched and will not be answered. I'm sorry
Q:What are the requirements for jack up and plus section of jack up tower crane?
Shall conform to:1, tower crane has not reached the standard free height or attachment, not to the standard suspension height;2. The standard section of tower crane jacking must be the size of the original production;3, tower crane jacking work must be carried out by the professional installation team;4 tower crane jacking up, the wind must be less than four.Answer the 1 floor:The height of the self elevating tower crane is built up by other cranes like building blocks.
Q:How to select tower crane type according to the height of building? Seek explanation
This depends on the height of your building, the area, the choice of tower cranes, the model is different, his work coverage is not the same. Now for tower crane, height is not a problem, mainly depends on the size of your building, not in the crane's scope of operation.
Q:How to calculate the pouring and maintenance of tower crane concrete in valuation?
Valuation, tower crane concrete foundation pouring and maintenance costs are included in the tower crane rental costs, not separately assessed.
Q:How many motors does the ZOOMLION TC6013A-6 tower crane use?
Model: YZRDW225M-4/8 power: 24/24KW speed: 1420/725r/minDirect search {ZOOMLION QTZ80 (tc6013) _ crane Manual Part 1 (Part Two)}, can also be found.
Q:What does tower crane jacking up mean?
Attached tower crane upper work structure and the lifting sleeve frame connected to the lifting sleeve frame is installed on the lifting jack.
Q:What are the main parameters of a tower crane?
Generally speaking, the main parameters of the tower crane are:Maximum amplitude unit MMaximum lifting height, unit MMaximum lifting torque unit KN.mMaximum lifting speed unit m/minMaximum lifting unit tRotational speed unit r/minVariable speed unit m/min or o/minWalking speed per unit m/minMotor power unit w......Please refer to the product manual.
Q:Do self lifting tower cranes allow a small swing of the boom in jacking operation?
The upper crossbeam of the jack is connected with the jacking frame, and the lower cross beam is provided with a movable claw, and the lower supporting point can fall on the step of the standard section of the tower body. During lifting, first trim jib and balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.
Q:Ask about the lift and transportation of the jack up tower crane
If it implements specialized subcontracting, it shall be organized by the subcontractor. Led by the security establishment or technician, audit professional and technical personnel to audit the Organization Department of the unit by unit technology, construction technology, safety, quality and other departments, and ultimately approved by the signature of the person in charge of enterprises (393 orders), and the general contractor technology are also responsible to approval.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range