• Tower Crane Lifting Machines Famous Factory System 1
  • Tower Crane Lifting Machines Famous Factory System 2
  • Tower Crane Lifting Machines Famous Factory System 3
  • Tower Crane Lifting Machines Famous Factory System 4
  • Tower Crane Lifting Machines Famous Factory System 5
  • Tower Crane Lifting Machines Famous Factory System 6
Tower Crane Lifting Machines Famous Factory

Tower Crane Lifting Machines Famous Factory

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detail of Tower Crane

Feature: Tower Crane                Condition: New                         Application:Building,Construction,Industrial

Rated Loading Capacity: 1.6-8T      Rated Lifting Moment:100KN.M           Max. Lifting Load: 8T

Max. Lifting Height: 200M           Span: 2.5-55M                          Place of Origin: China (Mainland)

Brand Name: CMAX                    Model Number: TC5516(QTZ100)           Certification: ISO,CE

Warranty: 1 Year                    Free standing height (M):44            Max. Working Range(M): 55

Tip Lifting Weight(T): 1.6          Working Range(M): 45,50,55             Climbing speed(M/MIN): 0.5

Counterweight(T): 17.6              Working Temperature(°C): -40-+60      Type: Topkit Tower Crane

Delivery Date:25-30 days            Mast Section Size(L*W*H)MM:1600*1600*3000             


Main Features of Tower Crane


1. TC5516(QTZ100)  have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 55m, TC5516(QTZ100)   tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

 

2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

 

3. It is original in design, reliable in operation and satisfactory in shape.

 

4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.

 

5. Provide stepless speed regulation. Oustanding in working efficiency, operating stability and reliability.

 

6. Reduce future maintenance cost.


7. With scientific layout and beautiful appearance.

 

8.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. 

 

9.After sales service will be offered which will get rid of all your worries in the purchase of our products


Specification of Tower Crane

 

Tower Crane Lifting Machines Famous Factory


Tower Crane Lifting Machines Famous Factory

Tower Crane Lifting Machines Famous Factory 

Images of Tower Crane


Tower Crane Lifting Machines Famous Factory

Tower Crane Lifting Machines Famous Factory

Tower Crane Lifting Machines Famous Factory

Tower Crane Lifting Machines Famous Factory

Tower Crane Lifting Machines Famous Factory


FAQ about Tower Crane

 

Q: What kinds of tower crane are available now? 

A: Four main categories: normal  tower crane  with cat head, internal climbing  tower crane , top less  tower crane  and luffing  tower crane.  

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



Q:Better actor......Bob Crane or Alan Alda?
Their TV shows were both very good. It seems Bob Crane has faded out of sight. He is also old by now. Alan Alda has made some good movies. He also does a lot of narrating for documentaries. I think I have to go with Alan Alda.
Q:My friend from the internet has an injured crane in her backyard, does anyone know how to keep it calm so she can bring it to the humane society? She says she's called very animal rescue place she knows and none can help so now she's just sitting with it because kids keep throwing sticks at it.
First of all, tell your friend to beat those idiot kids. Second of all, tell her to give it water and food. Tell her to keep calling places because that is nonsense animal rescue are denying to help.
Q:I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
Q:the cable of Crane I creates and angle of 30 degree angle from the horizontal and the cable of Crane II creates an angle of 45 degrees from the horizontal.-draw a figure that gives a visual representation of the problem-write a vector to represent the tension on the cable of Crane I-write a vector to represent the tension on the cable of Crane II-write a vector to represent the 20000 lb cargo container being lifted -calculate the tension on both cables. Justify your answer.....please help me!!! thank you!!!!:)
All I can say is.. Big crane make big thing go up.
Q:In the end of chapter 16 of Catching Fire the 2nd book of the Hunger Games it says the name she wrote in the dummy, was Seneca Crane. Who is that?!,
Seneca Crane was the game maker for the 74th annual Hunger Games He was basically the gamemaker of the games that Katniss was first in with Peeta in the first book/movie In Catching Fire, you learn that President Snow got him killed because as gamemaker, he's responsible for the reason why two tributes (Katniss and Peeta) won the last Hunger Games, which is why Katniss has the dummy saying Seneca Crane on it.
Q:My grandma has just gotten cancer and I want to send her a paper crane in her get well card. However, is it bad luck to send just one, do you have to send 1,000? I would like to send 1,000 but i don't have the time, experience with origami, or enough room in the envelope, and i only have till tomorrow.
No okorder /
Q:Absolutely bs. I hope a crane falls on ALL these effin construction workers and their families and the building executives' heads. Let THEM have family members die or get hurt from these accidents - then they will get what's coming to them. They should all burn in hell. Total greed total total greed. They will pay
Something needs to be done quick because it was the second deadly crane accident in 2 1/2 months in the city............
Q:Are there any special requirements for the installation of wall fittings of tower cranes?
The spacing along the height of the retaining wall piece must comply with the installation instructions for the tower crane;
Q:My relatives and their kids are coming the 28th for our Christmas does any body know where I can get a Brio Crane for a 3 year old? most web sites I checked say sold out. Just wondering.
Hi okorder . Please visit it and it will satisfy your needs. Best regards, Soma
Q:Was it Ichabod Crane or Rory Emerald who got the jeepers creepers scared out of them by a headless horseman?
It was Ichabod Crane who encountered the headless horseman.One of my favorite stories!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords