• Tower Crane  Jib Length 65M Max Load 10T System 1
  • Tower Crane  Jib Length 65M Max Load 10T System 2
  • Tower Crane  Jib Length 65M Max Load 10T System 3
  • Tower Crane  Jib Length 65M Max Load 10T System 4
Tower Crane  Jib Length 65M Max Load 10T

Tower Crane Jib Length 65M Max Load 10T

Ref Price:
$40,000.00 - 80,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Structure of Tower Crane TC6520 Description


Feature: Tower Crane                          

Condition: New                              

Application: Construction          

Max.Lifting Load: 10T                            

Max Tip Load:2.0T                          

Independent Height:50M

Max Lifting Height: 200M                      

Span: 65m                                      

Certification: CE,ISO

Place of Origin: China(Mainland)          

Model Number: TC6520         

 

Packaging & Delivery of Tower Crane TC6520


Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Main Feature of Tower Crane TC6520

 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.

 


Tower Crane TC6520 Specifiction

 

 


 

Images of Tower Crane

 

 

FAQ of Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Q:I recently read that adult crane flies consume nectar or do not eat at all, their only purpose is to mate. After a crane fly mates, is starvation the cause of its death, or is there something else that ends its life such as age?
Adult crane flies survive from all the fat they have, from their larval and pupal stage.When they run out of it, they eventually cannot find food, and by that time, they should die of age.It's probably both causes, if not because of predators,disease..etc
Q:i cant find a poetry site that will let me read this portion of The Bridge, the epic poem. i need help
I okorder /.. Try searching lines from the poem if that doesn't work for you like imponderable the dinosaur sinks slow.
Q:Does taichi use the animal fists, crane,monkey,dragon,tiger, ect?
no taichi i not related with the animal behavior , it created by slow moment with a lot of internal power
Q:Grade 4 build a working crane Help!?
Simple crane? Get a spool, maybe one from sewing thread. Attach it to a small base so that it can rotate freely. Put a pencil through the middle tight enough so that when the pencil rotates the spool rotates. Glue a tab on the end of the pencil at a right angle to the pencil so you have a handle. Attach string to the spool and then maybe a ruler or stick to a base lined up with the spool like a crane. Put a couple of eye hooks on the stick and feed the string through so it hangs down at the end of the stick, like a crane cable. At the end of the string put a springy clothspin so that when you pull the string the clothspin opens and closes. Now you can lift and lower the clothspin by rotating the spool with the pencil. Pulling on the string opens the pin to pick up things.
Q:Like the tall cranes on construction sites. I mean, suddenly they're just magically there!
Not in urban areas. Most cranes are put up overnight to avoid disturbing traffic and so forth. I work for a shipping company. They do put up huge cranes overnight and it is quite amazing to see, once or twice. The magic is how well it's organised. And how Santa comes along to give his blessings.
Q:What is a tower crane without a collector?
Once again, because the collector is using carbon brush and copper ring contact, the tower crane work in the sway of the impact is too large, easy to cause carbon brush and copper ring arc between burning. Combined with this reason, today's tower cranes do not use collector. The drawback is that the tower crane can not be one-way one-way rotation. So now the use of rotary limiter, set the tower one-way rotation can only turn 540 degrees, want to turn, can only turn in the opposite direction.
Q:The earthing resistance of tower crane shall not be greater than that of the tower crane
Lightning protection grounding is less than 10, transformer grounding is less than 4, special equipment requirements is less than 1
Q:In the end of chapter 16 of Catching Fire the 2nd book of the Hunger Games it says the name she wrote in the dummy, was Seneca Crane. Who is that?!,
Seneca Crane was the game maker for the 74th annual Hunger Games He was basically the gamemaker of the games that Katniss was first in with Peeta in the first book/movie In Catching Fire, you learn that President Snow got him killed because as gamemaker, he's responsible for the reason why two tributes (Katniss and Peeta) won the last Hunger Games, which is why Katniss has the dummy saying Seneca Crane on it.
Q:This has nothing to do with travel, I'm just curious. I hate it when the news doesn't follow up on stories they focused on earlier. Does anyone have a status update on that crane that was swaying in the wind during Sandy?
My friend, that is a good question. According to the latest news conference from the Mayor, the crane's boom arm is secured to the structure. However, West 57th Street between Broadway and 7th Avenue is closed until farther noticed. In addition, the 57th Street-7th Avenue subway station on the N, R and Q Line is closed and trains are bypassing the station in both directions, according to the MTA. Good luck Native New Yorker
Q:how to make an simple electromagnetic crane?
STEP 1 Buy a Crane Step 2 put a electromagnet on iy Step 3 stick ur name on it you get DIY crane

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords