Tower Crane in India Yongli for Buiding Manufacturer Hot Sale TC5010

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
120 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

TC5010 Description

Feature: Tower Crane                      Condition: New 

Application: urban construction        Rated Loading Capacity: 1-5T 

Rated Lifting Moment: 500KN.M       Max. Lifting Load: 5T 

Max. Lifting Height: 140M                Span: 50M 

Model Number:  TC5010

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

TC5010 Features

1. With automatic welding robot for tower crane structures.

2. Export to more than 20 countries with CE/ISO Certificate.

3. Stationary or Fixed or Inner Climbing tower crane

4. Impeller blasting or rust protection paint

5. Advanced painting process and excellent color 

6. New designed mast, can be used to Internal and external climbing

7. Famous brand mechanism system, Schneider Electronic control box, jiangte and jiuhe motor

TC5010 Specification

Tower Crane in India Yongli  for Buiding Manufacturer  Hot Sale TC5010

TC5010  Pictures 

 

Tower Crane in India Yongli  for Buiding Manufacturer  Hot Sale TC5010

Tower Crane in India Yongli  for Buiding Manufacturer  Hot Sale TC5010

Tower Crane in India Yongli  for Buiding Manufacturer  Hot Sale TC5010



TC5010  FAQ

 My dear friends, If you need any tower cranes, please tell us the below basic parameters:

1. Building height or tower crane working height.

2. Max load capacity and tip load capacity.

3. Span or jib length

4. Other Special requirements 

Welcome to contact us! Believe will be your best choice!


 

 

 

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Under what circumstances are winches used and under what circumstances tower cranes are used?
First of all, what you say should be a derrick or a Longmen frame. In any case, the derrick or tower crane should first meet the construction requirements, then the economy and safety requirements. To meet the construction requirements, it is much better to choose the derrick, of course, economically and safely. Derrick is a simple nonstandard equipment. It is easy to install, use and disassemble. It has low running cost and less safety risk than tower crane. The derrick is suitable for construction under 30 meters or less, especially for multi storied buildings and single pieces. The volume and quality are not more than 2 tons.
Q:How often should the crane be inspected regularly?
Tower cranes, elevators, mobile cranes 1 times a year, including rubber tyred container gantry crane every 2 years 1; small light lifting equipment, bridge crane, gantry crane, gantry crane, cable crane, crane mast, railway crane, jib crane, mechanical parking equipment every 2 years 1, the crane annual molten metal and hot metal 1.Rules for periodical inspection of lifting machineryArticle 1 These rules are formulated in accordance with the regulations on the supervision of special equipment safety and the regulations on the supervision of crane safety.Article second of the rules from the regular inspection of heavy machinery, is often used in hoisting machinery maintenance unit (hereinafter referred to as the foundation of the self inspection and maintenance), by the State Administration of Quality Supervision Inspection and Quarantine (hereinafter referred to as the State Quality Inspection Administration) special equipment inspection agency approved (hereinafter referred to as the inspection agency) according to the rules, to incorporate the use of registration in the inspection of crane.Article third these rules apply to lifting machinery within the scope stipulated in the regulations on safety supervision of special equipment. All the hoisting machines included in the catalogue of special equipment shall be inspected regularly."No" included in the catalogue of special equipment installation supervision and inspection and the implementation form of hoisting machinery factory, direct delivery unit, for use in pre registration by the local inspection agencies in accordance with the rules of the test items and their contents, requirements and methods for inspection of the equipment before using test (i.e., referred to as the first examination), qualified rear can be used for registration. For the first inspection of hoisting machinery, see Appendix A.
Q:What are the types of common tower cranes?
(3) according to erection methodNon self erecting tower crane: a tower crane assembled and erected by other lifting equipment.Self erecting tower crane: a tower crane that relies on its own power unit and mechanism to realize the transition between the transportation state and the working state.(4) according to variable amplitude methodThe trolley jib tower crane lifting trolley along the tower crane luffing boom for operation.Boom luffing tower crane: luffing tower luffing luffing luffing crane.Folding tower crane: tower crane which can be bent by boom according to the needs of lifting operation. It can also have the performance of luffing and luffing.
Q:The rated lifting capacity of a tower crane refers to what is allowed and what is allowed to be divided by the crane
The total quality of the crane rated liftingweightincludes the lifting load and the hook and rope a simplified example, such as the rated lifting weight of 100 tons, the quality of the hook and spreader for 5 tons, the actual quality of the goods can lift 95 tons.
Q:How to build a tower crane?
4, combination and installation with the boom, hung with arm pull rod.5, the assembly and installation of crane. This boom just installed in the rotary device, the other end is able to lift and hang rod, in accordance with the installation instructions.The power supply auxiliary hoist with 6, switch on the tower cap following installation, the installation of counterweight boom hoist with the.
Q:Lifting tower crane tower more than 45 meters, the demolition cost and how to adjust the field Sinotrans transportation fees?
Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
Q:Does tower crane belong to special equipment?
Tower crane is a high-altitude operation, the type of work belongs to special types of work, equipment belongs to special equipment.
Q:What courses should I take to buy the tower crane to be installed?
First in, in construction projects, and so on arrival booking use state, from the construction project into fixed assets. Increase in fixed assets, depreciation from the beginning of next month
Q:What is the scope of the installation and disassembly of self lifting tower cranes and the applicable range of the cost and the off-site transportation cost?
The installation and disassembly of the existing self rated tower crane, the first cost and the off-site transportation cost quota are divided by the lifting moment 1000kNm and 2000kNm of the jack up tower crane.
Q:What is the function of the balance valve in the hydraulic jacking system of tower crane?
The function of the balance valve is to maintain the balance of the oil pressure, the hydraulic oil delivery flow is stable, so that the tower crane jacket and the upper part of the lift, disassembly, standard time, lift and smooth.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range