TOWER CRANE H7533 TC7533 MAX. LOAD 20TON

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
1 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  

Brief Description 

1) TC7533 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 180m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

 

Main features


TC6520 tower crane is a company based GB/T5031-2008 《tower crane》design and manufacture of a construction crane. It can be applied widely in high-rise civilian building, bridge and water-conservancy project, big-span industrial workshop and high-rise building, etc. the tower crane is high level slewing self-erecting tower crane which adopts horizontal jib and trolley-jib. The main features as follows:

Height of the tower crane is confirmed according to height of building, lifting ability of the tower crane is independent of height.

The tower crane with features as high working speed, stead work condition and high efficiency.

Hoisting jib has 75m. This meets project needs more widely.

The eyeshot of cab is well, and the cab is installed independently,which creat preferable working condition for handlers.

Location of the tower crane is reasonable, and the externality of the crane is beautiful.

Lifting jib adopts rigid double tension bars with features as light structure.

the operation is simple and the maintenance is convenient

 

TOWER CRANE H7533 TC7533 MAX. LOAD 20TON

TOWER CRANE H7533 TC7533 MAX. LOAD 20TON

TOWER CRANE H7533 TC7533 MAX. LOAD 20TON

TOWER CRANE H7533 TC7533 MAX. LOAD 20TON

 

 

TOWER CRANE H7533 TC7533 MAX. LOAD 20TON

 

 

 

 

TOWER CRANE H7533 TC7533 MAX. LOAD 20TON

 

Parameter List

TOWER CRANE H7533 TC7533 MAX. LOAD 20TON

 

 

Packaging & Shipping
All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.
 

 

 

 Our Service
1.We can make special sample according to the customer’s requirement.
2. We have more than 60 professional technical team, provide best after-sales service
3. Fast delivery time
4. We have CE, ISO9001 and GS certification.

 

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the rental price of a tower crane? General site rental more, but also buy more? Ask the industry for an answer?
The rental price of tower crane consists of the cost of advance and retreat yard and the monthly rent of tower crane. The cost of the advance and retreat yard includes the loading and unloading costs, transportation costs, installation costs and monitoring expenses of the tower crane. The rent of the tower crane includes the cost of tower cranes, the cost of tower crane maintenance and the wages of the crane drivers. At present, many sites are using lease way to use tower cranes, so that the occupation of the site will be less rent, investment will be relatively small.
Q:Is the tower crane a special type of work?
Certainly, it belongs to the high-altitude workers, not the special workers, what is the tower crane talent network is a platform for the exchange of tower.
Q:Construction tower crane operator certificate expires, how to verify?
Chongqing "construction crane operator qualification certificate", the need for training after the exam this year, Yubei District has organized a meeting, other areas will organize can ask the competent department, the Department in charge of the Certification Committee is.The following is a notice of the Yubei District organizing examination for your reference:Notice of Chongqing Yubei District construction post training center on training courses for construction lifting machinery operatorsAll construction enterprises, mechanized companies, tower crane leasing companies:In order to strengthen our district housing construction sites and municipal engineering site crane operations personnel management, improve personnel quality, prevent and reduce accidents, according to the State Quality Inspection Administration, the Ministry of construction and the Municipal Construction Committee of the spirit of the relevant documents and regulations. After the study, we decided to hold a training course for construction machinery operators, and hereby notify the relevant matters as follows:I. training objects and registration requirementsWhere the construction enterprises in our district and the relevant units engaged in or engaged in the work, at least 18 years of age, women are not more than 55 years of age, male, no more than 60 years of age, junior high school education, good health.
Q:Four for crane, two for insurance, two for insurance. What does that mean?
Refers to the air switch and the electric leakage protector in the electric tray.
Q:Brief introduction of ten no hanging criterion for tower crane operation
4, buried objects do not pull the crane; 5, cable-stayed holding objects not hanging 6, the slings and objects; rickety bundle does not meet the safety requirements to crane; 7, vehicle weight hanging directly processed when not hanging;
Q:Tower cranes should stop working when the wind speed is greater than the magnitude.
Tower crane should stop working when the regulation is greater than or equal to six wind.When the wind is greater than or equal to four, the lifting operation shall be stopped.
Q:How to change the mechanical property unit of crane (tower crane)?
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:QTZ63 (Q5610) tower crane power, how many power parts, name, model specification, product number, date of appearance
What is the total power of tower cranes of type 63 and 40?
Q:Under what circumstances does a tower crane require third party testing?
New clothes, relocation or transformation should be examined by the quality and Technical Supervision Bureau
Q:How to fix the cable on the tower of QTZ125 type tower crane?
The main purpose is to prevent the main cable fixed tower crane tower crane cable weight lead cable pulled bad (insulation damage, core pulling) etc.,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range