TOWER CRANE H7533 TC7533 MAX. LOAD 20TON

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
1 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  

Brief Description 

1) TC7533 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 180m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

 

Main features


TC6520 tower crane is a company based GB/T5031-2008 《tower crane》design and manufacture of a construction crane. It can be applied widely in high-rise civilian building, bridge and water-conservancy project, big-span industrial workshop and high-rise building, etc. the tower crane is high level slewing self-erecting tower crane which adopts horizontal jib and trolley-jib. The main features as follows:

Height of the tower crane is confirmed according to height of building, lifting ability of the tower crane is independent of height.

The tower crane with features as high working speed, stead work condition and high efficiency.

Hoisting jib has 75m. This meets project needs more widely.

The eyeshot of cab is well, and the cab is installed independently,which creat preferable working condition for handlers.

Location of the tower crane is reasonable, and the externality of the crane is beautiful.

Lifting jib adopts rigid double tension bars with features as light structure.

the operation is simple and the maintenance is convenient

 

TOWER CRANE H7533 TC7533 MAX. LOAD 20TON

TOWER CRANE H7533 TC7533 MAX. LOAD 20TON

TOWER CRANE H7533 TC7533 MAX. LOAD 20TON

TOWER CRANE H7533 TC7533 MAX. LOAD 20TON

 

 

TOWER CRANE H7533 TC7533 MAX. LOAD 20TON

 

 

 

 

TOWER CRANE H7533 TC7533 MAX. LOAD 20TON

 

Parameter List

TOWER CRANE H7533 TC7533 MAX. LOAD 20TON

 

 

Packaging & Shipping
All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.
 

 

 

 Our Service
1.We can make special sample according to the customer’s requirement.
2. We have more than 60 professional technical team, provide best after-sales service
3. Fast delivery time
4. We have CE, ISO9001 and GS certification.

 

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:in the sentence , stephen crane wrote..?
Transitive - because it has an object The Red Badge of Courage. . Generally, if you can put the word something after a verb, it is transitive. Stephen Crane wrote something .
Q:Doing white crane kung fu?
White Crane Kung Fu combines protection and assault and makes use of the two gentle and not basic power. It additionally emphasizes organization yet evasive footwork. that's an on the spot, linear and deceptive martial paintings. this actual device is named Fei He or Flying Crane. Flying Crane makes use of the two extreme and occasional kicks yet has a marked decision for speedy hand innovations. It stresses empty-hand as properly as weapons preparation, 2-person instruments, self-protection drills and loose-sparring.
Q:In the case of tower crane operation, the operation should be stopped
In case of six or more gales, heavy rain, heavy fog, heavy snow or tower crane, you should stop working
Q:where can i find the xxx video of bob crane?
I think they're in police custody or destroyed. Some of the women in his videos were suspects (or at least persons of interest). Police feel his murder may have been by a jealous husband or boyfriend. In just recent years someone was tried for the murder and they were found not guilty. If you ever do find videos of Crane tell me where.
Q:How would you be able to tell the difference between a crane fly and a mosquito?
Really easy: A crane fly has no long piercing mouthpart: they feed mainly on nectar Female mosquitos have long piercing mouthparts, males are smaller and have shorter mouthparts for sucking nectar from flowers. Common crane flies are almost always bigger than a mosquitos.
Q:What are the lifting moment requirements for tower cranes?
2 tower cranes (tower crane) referred to as tower cranes, also known as tower cranes, originated in Western europe. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..Has a good safety device
Q:Has anyone stayed at The Crane?
I okorder.com/
Q:What points does Crane makes about Courage in The Red Badge Of Courage?
Please see the website below for much more information. There are many good notes about the book, The Red Badge of Courage. Chapter 11 Fear of Battle 7: The burst of courage that Henry feels is purely produced by the actions of those around him; he feels compelled to be like the idealized warriors he perceives the men in front of him to be. Yet, his internal doubt of being able to fulfill the social expectations that he feels ultimately holds him back from acting on this burst of courage. Chapter 12 Fear of Battle 8: With Wilson's newfound maturity comes an acceptance of battle, which is neither the quaking fear of the new regiment or the biting sarcasm of the veteran soldiers. This is the first glimpse of the true internal strength that Henry searches for within himself. It is a glimpse of something that does not surface often among the soldiers who have found it, for Henry sees that the veterans often cover up this internal strength with a cocky sarcasm that is both imposing and difficult to see through. Chapter 17 Fear of Battle 9: Fear of battle has perhaps given way to something more subtle; with Henry's acceptance of battlefield reality comes a more pervasive feeling of injustice that Henry felt on the previous day when he felt pushed along by his regiment. This feeling is one of a desperate helplessness, breeding an all-encompassing hatred. This sense of hate, ironically, helps Henry to achieve the storybook ideal of the warrior, and find inner peace.
Q:How do you cheat on a crane game?
a partial cheat that i use is 1st looking to see which items are at least open enough to get 2nd when i start up i get to the item then to go the left and right of item and adjust which way i go then try to aim for the middle of the item wanted then there is an 80 % chance that i will get the item i am aiming for but some of those crane games are rigged to the point you have to go at least 2 or 3 times depending on what type items are on there because the crane arm looses strength especially if it is far away from the exit hole
Q:how to calculate load capacity of crane?
must be sble to left one in half times weight

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range