Tower Crane for SaleFixed Hydraulic Hammerhead Tower Crane QTZ315

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 QTZ315  Description

Feature: Tower Crane

Condition: New

Application: All construction

Rated Loading Capacity: 10ton

Rated Lifting Moment: 1800KN.m

Max. Lifting Load: 10ton

Max. Lifting Height: 180m

Span: 3~65m

Place of Origin: Shandong, China (Mainland)

Brand Name: MEIDA

Model Number:QTZ315-7040  tower crane 6518

Certification: ISO,CE,GOST,BV

Warranty: one year

After-sales Service Provided: Engineers available to service machinery overseas

Tower crane Material: Q345B Steel

Relay elements: Schneider

Mast section dimension: 2.0*2.0*3.0

Trolley speed: 58/29/9m/min

Rated hoisting capacity max radius: 1.8ton

Jib length: 65m

Free standing height: 60m

Slewing speed: 0.72r/min

Working temperature: -20~+40℃

Tower crane Color: as customers' requirement

QTZ315  Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. New designed mast, can be used to Internal and external climbing tower crane

6. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

7. Engineers available to service machinery overseas.    

QTZ315   Specification

Tower Crane for SaleFixed Hydraulic Hammerhead Tower Crane QTZ315

QTZ315   Pictures

Tower Crane for SaleFixed Hydraulic Hammerhead Tower Crane QTZ315

Tower Crane for SaleFixed Hydraulic Hammerhead Tower Crane QTZ315

Tower Crane for SaleFixed Hydraulic Hammerhead Tower Crane QTZ315

QTZ315   FAQ

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.


Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How difficult is white crane boxing?
Never did Kung Fu But white crane boxing is the predecessor to a lot of styles of karate Mainly Goju Ryu Karate. From whatever little that I have learned of it I would say it is pretty tough both on your will and body. But in the end of the day it all depends on instructor. Go and ask for a demo class.
Q:why should i look forward to reading stephen crane?
Well, you know he lived in the late 1800s, so you probably have an idea of what his poetry will sound like. Then you read some of it, and the effect is sort of like walking into what you think is going to be a prissy hair salon and being whacked over the head with a bunch of bananas wielded by a glow-in-the-dark green monkey from Jupiter. Crane's stuff is that weird. And I mean that in a good way.
Q:How did Romans make columns in roman times Without cranes?
Columns weren't one piece - they were stacked. They had cranes of a type the used human lifting power.
Q:How many meters of cranes should be in accordance with the anemometer?
Tower crane type test items, technical requirements and test methods provides that: Boom root hinge point height of greater than 50m tower crane, should be equipped with anemometer. When the wind speed is greater than the working limit wind speed, the alarm can be issued to stop the operation. The anemometer shall be installed at the top of the tower without the wind.In fact, this is also the requirements of the type test rules for tower cranes and the safety technical specifications for crane overload protection devices.The answer is recommended dogmatism, mainly because the standard setters do not understand the actual situation of the construction, and not the outdoor crane need, need only part of crawler crane and tower crane installation, as the case may be other.Welcome to the emperor student - lifting expert Sina blog, my blog is committed to the dissemination of hoisting safety and professional knowledge.
Q:Give me 5 facts about Stephen Crane?
Stephen Crane Facts
Q:100 or 1000 origami cranes> Do you truly get a wish?
It sort of depends, maybe. And the legend says that it is indeed and unfortuantely 1,000 cranes. It also says you have to make all of these within a year, and it is a DIY project
Q:What is the purpose of the stinger on Crane Flies?
It's an ovipositor. The thing goes under bark and lays their eggs there.
Q:I'm writing a story on kung-fu and I need some info on the White Crane fighting style.?
there are several kata, that was influenced by it, like niahanchin (tekki), chinto, rohai and many others
Q:What are Cranes and Derricks used for?
Cranes are used for lifting heavy equipment. Derricks are used to drill for oil. They are two different things.
Q:1000 paper cranes a myth?
i've got faith it too. you purely make one thousand paper cranes, and that i think of that purely the sufferer of the ailment is meant to make it. Oh yea, and you carry the cranes around the sufferer. this is style of irrelevant, yet once I study a e book Sadako and the Thousand Paper Cranes. it quite is a few lady who tries to make one thousand paper cranes with the intention to get cured. it quite is particularly unhappy, yet it quite is the place i'm getting my data from.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range