Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT6015-10T

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

PT6015-10T  Description

Feature: Tower Crane

Condition: New

Application: All construction

Rated Loading Capacity: 5ton

Rated Lifting Moment: 500KN.m

Max. Lifting Load: 5ton

Max. Lifting Height: 160m

Span: 3~50m

Place of Origin: Shandong, China (Mainland)

Brand Name: MEIDA

Model Number:PT6015-10T flat top tower crane 5010

Certification: ISO,CE,GOST,BV

Warranty: one year

After-sales Service Provided: Engineers available to service machinery overseas

Max.load capacity: 5ton

flat top tower crane Jib length: 50m

Free standing height: 35m

Relay elements: Schneider

Slewing speed: 0.6r/min

Rated hoisting capacity max radius: 1ton

Working temperature: -20~+40

Tower crane Material: Q345B Steel

Trolley speed: 40/20m/min

Tower crane Color: as customers' requirement

PT6015-10T  Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Advanced painting process

5. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

6. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

7. Engineers available to service machinery overseas.   

PT6015-10T  Specification

 Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT6015-10T

PT6015-10T  Pictures

Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT6015-10T

Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT6015-10T

Tower Crane for Sale,Tower Crane Price manufactureSelf-Erecting Large PT6015-10T

PT6015-10T  FAQ

Q: What is the function of the monitor?

A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.


Q: What is main advantage for manufacturing construction machinery?

A: Our machinery main advantages mainly include: 1. Nationallevel Research Academy for various building equipment for more than 30 years’ experience; 2. Complete quality control system; 3. Nearly 20 years experiences in manufacturing industries; 4. Over 50 engineers along with 6 local partner companies  providing worldwide after-sales service;

 

Q: What is the meaning of the tower crane’s code?

A: Take TC5013 for example, the first two letters “TC” means Tower Crane, “50” means jib length is 50 meter, and the last two letter “13” means the tip load is :1.3 ton.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How Much Can the Most Powerful Crane Lift?
Those stones are small compared to what cranes can lift. I did find this Liebherr the heavy equipment company have developed a new all terrain nine axle mobile crane that is the worlds most powerful. The Liebherr LTM 11200-9.1 has a maximum lifting capacity of 1,200 tons with its powerful 100 metre (328 ft) telescopic boom. another: Deira City Centre was the crane’s first lift as it assisted in completing the work in less than 30 hours in what would have otherwise taken an approximate 20 days. The monster machine can lift up to 1,200 tonnes and cover an area over 100m wide. The operational weight is 96 tonnes and the total counterweight is 202 tonnes. Average weight of the stones in the Great pyramid is 2.5 tonnes. So either of those cranes could lift over 400 of these at once.
Q:Is Scarecrow/Dr. Crane in The Dark Knight Rises?
Yes Gordon even calls him crane i remember
Q:Why are there extra placards attached to the tower crane tower?
2. after adding the placard, it will increase the windward area of the tower crane and increase the wind load of the tower crane, so that it will deviate from the calculation load when the tower crane is designed, and will affect the safe use of tower crane.
Q:Why did they kill Secana Crane in the end of Hunger Games?
The Capitol is a government that rules through absolute control. They're keeping the different areas under control through force, and everybody is too afraid of being killed to stand up to them. The Hunger Games are there to make people afraid of revolting and to give them some hope of one day becoming famous. Crane got killed because he allowed Katniss and Peeta to beat the game. The point of the Hunger Games is that there can only be one victor, but Katniss let them both live. By doing that, she showed that the Capitol couldn't control everyone absolutely, and they could beat the Capitol if they tried. Crane got killed because he let that happen. It also drives home to the reader how brutal Snow can be, and how willing to throw away a life he is.
Q:Another question about origami cranes...?
It okorder.com/ The animations on this site are good, showing what you have to do, without hands in the way.
Q:Why is there an American Flag hanging from the top part of this huge construction crane next to my house?
Crane Flags
Q:calculating psf in regaurdto crawler cranes?
Not sure what you are asking exactly... Are you saying that you have a crane with a capacity of 100 tons and you want to know the pressure on the soil where the crane is positioned? In this case, you take the capacity (in pounds) plus the weight of the crane (in pounds) then divide their sum by the area of the tracks on the crane (in square feet). This will result in pounds per square foot or psf as you wrote above. These are example estimates, they may not be anywhere near the correct answer, this is simply how to do the calculation. Assumed Capacity 100 ton = 200,000 lbs. Assumed Weight 105 ton = 210,000 lbs. Assumed Area of Track = 200 square feet Note: 1 U.S. ton = 2,000 pounds = 2,000 lbs. 410,000 lbs / 200 square feet = 2,050 psf There's a start, now you just need to find out how much it actually weighs and how long and wide the tracks are to get the area of the track on the ground. I hope that answers the question you were asking.
Q:What happened to Seneca Crane in the Hunger Games?
Seneca Crane was the head gamemaker in for the 74th Hunger Games. President Snow had him hung because he changed the rules to allow both Katniss and Peeta to win.
Q:What does "automatic tower crane" mean less than 100 tons per metre?
The crane must not exceed the maximum lifting capacity when working! Otherwise, there will be danger.
Q:If there are cranes by a small pond should there be fish?
Hmm... cranes don't normally eat fish. They eat mostly insects and the occasional frog or lizard. If there are herons or cormorants at this little lake of yours, then there's your sign fish are present. It won't take these birds long to search an area for fish. If there are no fish, the birds will move on fairly quick. If they're there every day, well... do what comes naturally.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range