Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ40A (4708)

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

QTZ40A (4708)  Description

Feature: Tower Crane

Condition: New

Application: Construction

Rated Loading Capacity: 4 ton

Rated Lifting Moment: 400 KN.m

Max. Lifting Load: 4 ton

Max. Lifting Height: 120 m

Span: 3-47 m

Place of Origin: Shandong, China (Mainland)

Brand Name: Meida

Model Number: QTZ40A (4708)  tower crane

Certification: CE, ISO, SGS, GOST

Warranty: 12 months

After-sales Service Provided: Engineers available to service machinery overseas

Material: Q235b

Electrical components: Schneider

section dimension: 1.5*1.5*2.2 m

Power: 26.7 Kw

Rated hoisting capacity max radius: 0.8 ton

Working environment temperature: -20 to +55

Free standing heigh: 29 m

Jib length: 47 m

Machinery weight: 19.5 ton

Color: yellow or optional

QTZ40A (4708)   Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

QTZ40A (4708)  Specification

 Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ40A (4708)

QTZ40A (4708)  Pictures

Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ40A (4708)

Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ40A (4708)

Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ40A (4708)

QTZ40A (4708)   FAQ

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.


Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.


Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:please tell an article about electromagnetic crane?
electromagnetic crane has a huge electric magnet instead of a hook. this magnet is operated by an electrical current. when electric is switched on the magnet becomes magnetized,allowing metal objects to be picked up just like an ordinary magnet.when Electric is turned off the metal object will fall away, as it is no longer magnetized.
Q:I am thinking about buying an engine crane or engine support for doing timing belts?
The engine support is mainly for dropping the tranny, used before the car is up on a lift. The crane is for lifting the engine while the four wheels are on the ground. Most timing belts can be done without lifting the engine. Lifting the engine involves a very long list of procedures before actually yanking it up even a few inches. You have to disconnect and support the transmission, drain coolant and fluids and disconnect the hoses and wires, remove the engine mount bolts, maybe pull the radiator out, disconnect the A/C system lines, and remove the tranny and oil cooler lines, the coolng fans, shroud, hood, and so on. Good luck!
Q:If there are cranes by a small pond should there be fish?
Hmm... cranes don't normally eat fish. They eat mostly insects and the occasional frog or lizard. If there are herons or cormorants at this little lake of yours, then there's your sign fish are present. It won't take these birds long to search an area for fish. If there are no fish, the birds will move on fairly quick. If they're there every day, well... do what comes naturally.
Q:Why are most construction cranes red?
Visibility. In the U.S. most that I have dealt with have been schoolbus yellow or international orange. Cranes represent a hazard not only from the fact that the crane operator has restricted visibility and has to concentrate on the load and the signals he is receiving from the rigger but the load itself constitutes a hazard.
Q:what type of hydraulic oil does a 2007 liebherr LTM 1160 5.1 crane take?
You're telling me you've been entrusted the control of a crane capable of reaching 565 feet up an you don't know what hydraulic oil it takes?? Jesus Christ mighty... First off, it's in the owners manual, second off it's probably on the resivoir cap.... If you couldn't figure that out you shouldn't be allowed near the damn thing...
Q:what do you mean by a detente ball in the crane of a revolver?
you're trying to create an appeasement, peace through war/violence
Q:How does a climbing or tower crane work?
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
Q:In dragon ball, Why is master crane evil in the filler?
The idea is that Crane Hermit is a selfish man that would do anything to get what he wants. In the past, Master Mutaito was there to ram some discipline in his head and have him under control. Following the events of his death and the defeat of King Piccolo, nothing could really stop him from being a selfish jerk again. Roshi probably didn't mention Crane being bad before King Piccolo's arrival because he wasn't really evil before it either. He was selfish and greedy, but not outright despicable as later... at least not that much. Roshi seeing Crane as a friend might imply that Crane had some redeeming qualities during his years as Roshi's rival under Mutaito's guidance. About their baldness, I think they shaved their heads after a while due to how monks and some martial artists tend to shave their heads. That or it's a plot hole due/filler error. It's again either a plot hole/filler error or they just switched outfits once they reached a certain level of their training, just like how you gain a different color of band as you progress in Judo and Karate.
Q:How do you cheat on a crane game?
a partial cheat that i use is 1st looking to see which items are at least open enough to get 2nd when i start up i get to the item then to go the left and right of item and adjust which way i go then try to aim for the middle of the item wanted then there is an 80 % chance that i will get the item i am aiming for but some of those crane games are rigged to the point you have to go at least 2 or 3 times depending on what type items are on there because the crane arm looses strength especially if it is far away from the exit hole
Q:Are there influence about Microwave and electromagnetic waves on the tower crane?
if the spread is just in the microwave communications channel or radio transmitting antenna in the vicinity, will be subjected to microwave and high-frequency electromagnetic waves Interference, even if it is in all the tower crane hook when the closing power is outage

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range