Tower Crane CMAX TC7135 Construction Machiney

Ref Price:
$201,500.00 / set
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Introduction:

Tower Crane is a machinery used for vertical lifting and horizontal delivering of building materials and any other heavy items during construction process. It can lift and lay down, horizontally shift, and rotate, so it has large working range.

 

Features:

1. It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

2. The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

3. The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

4. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

5. Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability,

6. The height can accordign to the actual height of the building and at the same time unchange the lifting capacity.

 

Specifications:

 

Tower Crane CMAX TC7135 Construction Machiney

Tower Crane CMAX TC7135 Construction Machiney

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do tower cranes rise?
The weight and concrete foundation shall be made in advance and marked, and the ground ground endurance shall be no less than 20T per square meter. The chassis and standard sections are then assembled on this basis. The standard section of tower crane is the main part of the main part of tower crane. It is also the main role of heightening the height of tower crane". In the construction process, tower crane accompanied by the rise of buildings, naturally need to heighten. When the tower is hoisted, the upper frame is raised upwards with the jack up, so that there is a space between the tower body and the frame, and the standard section of the tower body is installed in the space. In this way, the purpose of the tower crane is realized.
Q:Maggie: Girl of the Streets by Stephen Crane?
hah ha i'm in your class too :) This project sucks... and I still haven't done it! I have to tonight..
Q:How much more than m of tower crane jib winch point height should be equipped with anemometer
According to the regulations of JGJ196-2010 for the safety and safety of installation, use and disassembly of tower cranes for construction purposes:The use of 4.0.15 tower crane height of more than 30m should be equipped with obstacle lights, jib root hinge height of more than 50m should be equipped with anemometer.
Q:white crane gong fu,lions roar gong fu,viet voa doa,aikijujutsu striking concepts,wah lum north mantis kungfu?
To be honest I wish I knew more, but here's what I do know of Wah Lum. They have great hand trapping techniques that can be utilized while standing. A perfect compliment for close quarter combat. They come in real handy in bridging the gap. They ( like Wing Chun ) have sensitivity drills used for heightening your awareness of your opponents subtle movements. If you're a boxer,wrestler,or basically any other Martial Art practitioner. This is a good Art to at least be acquainted with.
Q:list of people confirmed dead from crane accident nyc?
i imagine they are injuries. regrettably those who artwork for the city authorities - a minimum of in lengthy island - are extremely incompetent and corrupt. What makes you say that No inspector ought to deliberately ignore a risky contemporary challenge ? That 's precisely what the inspector of the first crane crumple did. Oops, my mistake. He did not verify the cranes in any respect. And all those those who died lately in structure by utilising being blown off by utilising wind from large heights??!! I have in no way heard something like that in the previous. Who supplies those people the needed facilitates?? How educated are those people? the position is their union?
Q:the crane and praying mantis/ ba gua?
Well... you seem to have two questions in here. First of all, the crane and praying mantis are both stances used in internal (Weija) and external (Neija) Wing-Chun (Kung-fu). Second, Bagua is one of the internal styles. External styles are more powerful for fighting styles.
Q:How many meters is the tower crane installed on the edge of the deep foundation pit?
Tower crane foundation, if set up in the foundation pit, the foundation is to pile other, general tower crane is to support the wall.Therefore, how far away from the foundation pit is determined by the distance from the retaining wall.According to the industry standard "technical specification for concrete foundation of tower crane tower crane foundation installation" (JGJ/T187-2009), the installation of tower crane foundation concrete should reach more than 80% of design strength, the tower crane foundation concrete design strength should reach 100%.
Q:Under what circumstances does a tower crane require third party testing?
New installation, demolition, close, major transformation, the use of site work committee, the use of factories to the Technical Supervision Bureau
Q:How old is Scarecrow/Jonathan Crane?
Okay Well, You havent specified in what, but presuming you mean in the comics, and baring in mind he was the psychologist when Thomas Elliot and Bruce were only 7-8, then the bare minimum he could have been then was 21, though he was likely older. THEN presuming Bruce is around 35, though he also is probably older, then the bare minimum Crane could be is 48. that being said, he is likely between 48-60. He just looks good for his age ;). this of course is in the comics, however. The movie is different.
Q:how to say no to my child who wants to keep a pet? crane fly.?
just let him keep it . It wont live long any way!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range