Tower Crane CMAX TC7050 Construction Machiney

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Introduction:

Tower Crane is a machinery used for vertical lifting and horizontal delivering of building materials and any other heavy items during construction process. It can lift and lay down, horizontally shift, and rotate, so the working range is very large. The whole body can be fixed or movable.

 

Features:

1. It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

2. The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

3. The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

4. Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability,

5. This Tower Crane equipped with hydraulic lifting and connecting. The height can accordign to the actual height of the building and at the same time unchange the lifting capacity.

6. Frequency control, variable speed, smoothness and high stability, non-striking.

7. Three-speed change pole motor, simple in structure, economical ,fitting.

 

Specifications:

 

Tower Crane CMAX TC7050 Construction Machiney

Tower Crane CMAX TC7050 Construction Machiney

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:ichabod crane?
Maybe he drank a lot of absinthe and smoked a lot of opium!
Q:How do they get cranes off HUGE buildings when they are finished building them.?
Large okorder.com.
Q:Hi,what are crane swivels and fishing swivels.
FishSteelhead okorder.com/
Q:What is a TQ80 tower crane?
The concrete transport vehicle can be used at the lower part of the tower of the large tower crane. The one we usually see at the construction site is.) TQ80 is a model of cranes.
Q:What are the four major moving mechanisms of a tower crane?
Tower crane refers to the fuselage for the tower frame, can walk along the track, a crane equipped with rotary arm. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system.
Q:How do they get big cranes on top of high rise buildings?
Detailed okorder.com/
Q:I need help getting back to crane in maplestory?
I don't really understand what you're saying, but I'll try to help. You can only enter the crane every few minutes or so (I'm not sure of the exact time). When the crane is closed, there will be a gray door barring the way. When it is open, it will have a greenish-yellowish open doorway. You have to wait for it to arrive and open.
Q:1000 paper cranes question?
Consider what you would like your 100 cranes to mean. Attach strings to your 100 cranes and then hang them in a tree etc so that the wind may carry your prayers where they need to go. Then start again to create the 1000 paper cranes you want for your wedding. PS: The making of the paper cranes involves an act of faith, not the right colour to match your wedding plans. In Japan, the crane represents peace and healing. When we consider the famous Japanese art-form of paper folding (origami) the crane comes to mind before all else. Sadako and the Thousand Paper Cranes (1977), a non-fiction children’s book written by American author Eleanor Coerr, tells the story of young Sadako Sasaki who lived in Hiroshima at the time of the atomic bombing. Sadako developed leukaemia as a consequence, and lived out the remainder of her short life in a nursing home desperately trying to create one thousand paper cranes. Supposedly, if someone could make a thousand paper cranes his/her wish would come true. Sadako wanted to live. Sadly, she only managed to fold 644 cranes. After her death, friends and family folded the remainder, and buried her with the one thousand paper birds. Today, a statue of Sadako holding an enormous golden origami crane stands in the Hiroshima Peace Park. People regularly leave paper cranes. The plaque on the statue reads “This is our cry. This is our prayer. Peace on Earth.”
Q:How do they get the cranes and counterweights down off the top of buildings when finished?
Dereks, which are built along side of the buildings, actually take themselves apart. There is a jacking system which attaches to the segment that is 2nd from the top. This lifts the bussiness end of the crane off the top segment which can then be unfastened and lowered to the ground. The jacking system then replaces the crane on the new top, travels down one more segement and the process is repeated. It is actually cool to watch.
Q:The role of slewing limiter in tower cranes is limited
The crane or winch motor winding rope arranged on the roller loose, hoisting large demolition, resulting in the large load fast rope rope cut into bundles, causing fast rope severe jitter, vulnerable to instability, the results often appear to work and stop dangerous, can not stop the embarrassing situation.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range