Tower Crane CMAX TC7050 Construction Machiney

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Introduction:

Tower Crane is a machinery used for vertical lifting and horizontal delivering of building materials and any other heavy items during construction process. It can lift and lay down, horizontally shift, and rotate, so the working range is very large. The whole body can be fixed or movable.

 

Features:

1. It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

2. The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

3. The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

4. Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability,

5. This Tower Crane equipped with hydraulic lifting and connecting. The height can accordign to the actual height of the building and at the same time unchange the lifting capacity.

6. Frequency control, variable speed, smoothness and high stability, non-striking.

7. Three-speed change pole motor, simple in structure, economical ,fitting.

 

Specifications:

 

Tower Crane CMAX TC7050 Construction Machiney

Tower Crane CMAX TC7050 Construction Machiney

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Construction tower crane operator certificate expires, how to verify?
Two, training contentThe crane safety regulations and operation management; classification and main parameters of the crane; the structure and the working principle and the safety protection device of lifting up; the installation and removal of heavy machinery; the whole debugging and acceptance of heavy machinery; the operational and command signal of lifting and repair; and maintenance of heavy machinery.Three, training hours and full-time training arrangement: 5 days, annual training enrollment.Four, training fees450 yuan / person, including registration fees, training fees, books, information, assessment, assessment fees, accommodation, self-care.Five, training certificationStudents complete the prescribed courses, through the examination, after passing the examination by the Municipal Construction Commission issued a number printed and stamped with the "Chongqing City Construction Management Committee of" legal. "Chongqing construction tower crane operator qualification certificate".
Q:Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
It is the work level of the organization, representing the working hours and load sizes of the institution. See GBT/13752 or GBT/3811 for specific explanations.
Q:Why do tower cranes need to be fabricated?
The crane wire rope commonly used varieties of phosphating coating steel wire rope, galvanized steel wire, stainless steel wire rope, the use of atmospheric environment, patented technology to produce manganese phosphating coating of steel wire rope has the longest lifespan, heavy corrosion environment optimization of hot galvanized wire rope double - phosphating coating.Phosphating coating of steel wire rope production technology patent, give priority to the use of manganese or zinc manganese phosphating, and smooth steel wire rope production process comparison, just add the last bonderizing process, steel wire for rope wear resistance and corrosion resistance is greatly improved, the use of direct phosphating steel wire twisting steel wire rope.
Q:What are the requirements for jack up and plus section of jack up tower crane?
When lifting, a standard section is hoisted on the imported beam or introduced platform. Then open the pins or bolts connecting the standard section with the slewing support. Start the oil pump, so that the cage in the standard section of the outward sliding, until the release of a standard section position, and then imported beam or imported platform on the standard section into the connection. This completes a process.
Q:Under what circumstances are winches used and under what circumstances tower cranes are used?
Construction technology is not too complex, and components can be zero, the use of winches (such as brick structure). Large components can not be separated, the use of tower cranes (such as cement cast-in-place shear wall structure must use large-scale steel mold).
Q:How to calculate the pouring and maintenance of tower crane concrete in valuation?
Calculated according to actual concrete quantity. According to the design plan of the visa and construction organization.
Q:Tower crane 10-5-20 is 6T, and 10-5-21 is 8T. What do you mean by tons?
6T/8T refers to the maximum lifting capacity of a tower crane. It doesn't matter what 10-5-20 has to do with it. Maybe your list of numbers is serial number.
Q:Calculate the tower crane gantry crane
Is building gantry crane crane, gantry crane is generally used for the port, port crane. Can not be regarded as the tower crane.There are several common types of cranes: overhead cranes, gantry cranes, port cranes, automobile cranes, tower cranes, etc..Gantry crane is a medium and small cantilever crane with simple Longmen.
Q:What is the safe distance of a tower crane to the surrounding buildings?
JGJ160-2008 "construction site mechanical equipment inspection technical regulations" on the 46 page clearly written, safety distance shall not be less than 0.6 meters,
Q:What is the minimum radius of a tower crane?
The higher the rise, the larger the angle, the smaller the radius.I wonder if it's this angle? Hope to be of help to you,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range