Tower Crane CMAX TC5613 Type For Dubai Market

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Quick Details

Feature: Tower Crane                          Condition: New                                           Max.Lifting Load: 8T

Span: 56m                                             Place of Origin: Human China(Mainland) 

Brand Name: CMAX                              Model Number: TC5613         

 

Packaging & Delivery

Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Specifications

● Max. working range 56m, tip lifting weight 1.3T and Max.lifting weight 8T.

● Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability,

● Reduce future maintenance cost.

 

8T tower crane, support installation inside or outside building.
The self-raising tower crane, which is a new-style elevating machinery specially designed for the construction 

of tall buildings and equipment installation, is a type of self-raising multi-purpose tower crane equipped with level arm support, and it allows trolley derricking and upper slewing.

 

To Lead The Revoluation of International Trade

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Who is responsible for the construction of the pile foundation of the tower crane?
1, the pile foundation of the pile and tower crane foundation pile is not the same item, cannot pile foundation pile and tower crane foundation pile together to talk about.2, you did not say who is tower crane?. Who is responsible for the tower crane installation, including tower crane foundation construction.3, but, in fact, in most cases, the mechanical leasing company only provides technical requirements, providing tower crane foundation section. Piling and foundation concrete are the responsibility of the contractor.4, if the contract does not have a definite agreement on the construction of the tower crane foundation, the general contractor shall be responsible for the cost of piling the tower crane foundation. The piling Team can be the construction unit of the pile foundation, and also can be found by the general contractor.5, in the future tower crane foundation construction program should be clear about this matter, avoid controversy.These are only personal opinions.
Q:Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
Lifting mechanism in tower crane: M5. Luffing mechanism: M4 is the working system
Q:How to change the mechanical property unit of crane (tower crane)?
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:Why are there extra placards attached to the tower crane tower?
1. additional placards can sometimes damage tower structures and cause damage to the tower during installation. There is a security risk;
Q:Why do tower cranes need to be fabricated?
Cement prefab, are generally large components, especially bridges more, including buildings, these components of large size weight, super wide is the transportation, these components must be used crane, crane can meet the needs of the heavy transport of goods.
Q:Tower crane TC6013A-6-A2, what does "A-6-A2" mean later?
This is the old saying. The international standard is now used. For example, the QTZ100T.M lifting torque is 980KN.M (kn. Meters).The QTZ100 is similar to the lifting torque of the TC6013. But not the same model.
Q:Four for crane, two for insurance, two for insurance. What does that mean?
Refers to the air switch and the electric leakage protector in the electric tray.
Q:How many meters is the tower crane installed on the edge of the deep foundation pit?
Tower crane foundation, if set up in the foundation pit, the foundation is to pile other, general tower crane is to support the wall.Therefore, how far away from the foundation pit is determined by the distance from the retaining wall.According to the industry standard "technical specification for concrete foundation of tower crane tower crane foundation installation" (JGJ/T187-2009), the installation of tower crane foundation concrete should reach more than 80% of design strength, the tower crane foundation concrete design strength should reach 100%.
Q:What is the difference between lifting height of tower crane and independent height?
Of course there is a difference. Independent height refers to the highest height of tower crane in its free state. Lifting height refers to the height of actual tower crane design.
Q:What are the climbing claws on the tower crane?
You mean the set section? Used to be rubber, and later found that when the top of the friction is too large, not too good, plus plus the festival, but also always remove the standard section paint, and now basically the pulley

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range