Tower Crane Chinese Qualified Manufacturer 8T
- Ref Price:
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
- OKorder Service Pledge
- Quality Product
- Order Online Tracking
- Timely Delivery
- OKorder Financial Service
- Credit Rating
- Credit Services
- Credit Purchasing
Main Features of Tower Crane
1. TC6014(QTZ100) have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 60m, TC6014(QTZ100) tower cranes are famous for their large operating ranges, varied working methods and wide uses.
2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.
3. It is original in design, reliable in operation and satisfactory in shape.
4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.
5. Hoisting mechanism fitted with three speed moto stable braking and less shock when shifting.
6. Slewing mechanism equipped with 4-speed moto stable and reliable can provide stepless speed regulation.
7. Trolleying mechanism can provide two operatation speeds.
8. With scientific layout and beautiful appearance.
9.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys.
10.After sales service will be offered which will get rid of all your worries in the purchase of our product
Specification of Tower Crane
Images of Tower Crane
FAQ about Tower Crane
Q: What kinds of tower crane are available now?
A: Four main categories: normal tower crane with cat head, internal climbing tower crane , top less tower crane and luffing tower crane.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q:if the crane starts out at ground level and the skyscraper is being built next to it, how does the crane get moved to the top of the building once the skyscraper has been built to the level of the top of the crane? (eg: the crane can reach a height of 30 stories but the building being const. is 100 stories)
- it takes two cranes
- Q:What is a tower crane without a collector?
- The advantage of the collector is that the tower crane can be turned on one side without any limit, and how many circles can be turned. The tower crane is basically not equipped with collector, because collector generally needs to be located at the center of the tower's turning center, so it is inconvenient for operators to go up and down.
- Q:total motor kw-100kw,crane class-m6,the crane should be operated on ups as the conventional electric supply is off , back up time require-30 min.
- About 4200 AH( TOTAL) is required with 12 V batteries.
- Q:What are the three different types of Cranes?
- Whooping crane Crane your neck. Bob Crane from Hogan's Heroes.
- Q:this is a little of a random question but why do you think that we should save the crested cranes of uganda? and what do you know about the crested cranes???
- Because man is a reasoning being he has the capability of saving things. It is in our nature. Secondly, if man's activities are the cause of the Crane's extinction - destroyed its habitat or food source, then man should help reverse this.
- Q:I want to join
- Madras Institute Of Heavy Machinery in Thirumullaivoyal No 45, Thirumullaivoyal, Mth Road, Thirumullaivoyal, Chennai - 601209 (44)-26384031, 26382363, 26381739
- Q:I'm looking for estimate including installation, vertical support beams, and bus bars. Details: rectangular shaped building 500 ft long split lengthwise into two sections. 500ft X 4lengths of craneways is 2000ft. The crane runways are bolted to building frame but are self supporting on I-beams (104 vertical supporting beams X 24ft. height). The crane runways can support 10ton hoists. The bus bars (electrical conductor assembly) run along all (2000ft) of crane runways.
- Preformed okorder / We Build Cranes To Meet Your Needs And Your Budget. Free Quote. Offers a free quote. click link .
- Q:are parts availble for shop crane? Hydraulic ram plunger o rings has split....need part?
- What is the crane make and model? If you don't have the model of the crane you can stop by almost any hydraulic/hose shop, they should be able to match up the packings.
- Q:I have always wondered how they get cranes off the top of huge buildings when they finish building them.I have had many people tell me how they THINK the cranes are taken off. But I want to know for sure. Can anyone give me some evidence? A web site or something??When I say big building I mean like 100 storeys.I have been told things ranging from a helicopter takes them offToThey build tracks down the side of the building and drive it downAndThey pull it to pieces and take it down the elevator.These MAY be real but sound like wild guesses to me.So does anyone know the answer?
- Large okorder .
- Q:Like those huge cranes on the top of buildings that are being constructed - how do they get them up there???
- They erect it from the bottom and work their way up. The crane is also connected to the building at specific intervals. The larger cranes require a footing to be placed that can be as large or even larger than the building footings. The cranes are disassembled in the reverse order. The top piece is taken off and lowered. Cheers and good luck.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Similar products
New products
Hot products
You Might Also Like