Tower Crane China Famous Building Equipement

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Tower Crane TCD4021 Description


Feature: Tower Crane                          Condition: New                               Application: Construction           

Tip Load:8T                                           Span: 40m                                      Certification: CE,ISO                            Place of Origin: China(Mainland)          Model Number: TCD4021         

  

Packaging & Delivery of Tower Crane TCD4021


Packaging Detail: Nude package          Delivery Detail: 25-30days


Tower Crane TCD4021 Specifiction

Tower Crane China Famous Building Equipement

Tower Crane China Famous Building Equipement


FAQ of Tower Crane

 

Q: What kinds of tower crane are available now? 

A: Four main categories: normal tower crane with cat head, internal climbing tower crane, top less tower crane and luffing tower crane. 


Q: What kind of steel used for tower crane?

 A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.


Q: Your tower crane is similar to Potain or Liebherr type? 

A: We could develop any type of tower crane as per clients’ requirements if the clear information is provided. Originally, our tower crane design is based on Liebherr; but now, we not only introduced Potain design; but also developed special tower crane according to the market needs such as TC5013A with panel mast section. In addition, we also produce some models same as Potain original model, such as F0/23B, H3/36B and etc. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Tower crane body standard section connection bolt screw upward or downward, why?.
Usually it is worn from top to bottom, so that the nut is loose and the bolt will not fall directly
Q:How often should the crane be inspected regularly?
Tower cranes, elevators, mobile cranes 1 times a year, including rubber tyred container gantry crane every 2 years 1; small light lifting equipment, bridge crane, gantry crane, gantry crane, cable crane, crane mast, railway crane, jib crane, mechanical parking equipment every 2 years 1, the crane annual molten metal and hot metal 1.Rules for periodical inspection of lifting machineryArticle 1 These rules are formulated in accordance with the regulations on the supervision of special equipment safety and the regulations on the supervision of crane safety.Article second of the rules from the regular inspection of heavy machinery, is often used in hoisting machinery maintenance unit (hereinafter referred to as the foundation of the self inspection and maintenance), by the State Administration of Quality Supervision Inspection and Quarantine (hereinafter referred to as the State Quality Inspection Administration) special equipment inspection agency approved (hereinafter referred to as the inspection agency) according to the rules, to incorporate the use of registration in the inspection of crane.Article third these rules apply to lifting machinery within the scope stipulated in the regulations on safety supervision of special equipment. All the hoisting machines included in the catalogue of special equipment shall be inspected regularly."No" included in the catalogue of special equipment installation supervision and inspection and the implementation form of hoisting machinery factory, direct delivery unit, for use in pre registration by the local inspection agencies in accordance with the rules of the test items and their contents, requirements and methods for inspection of the equipment before using test (i.e., referred to as the first examination), qualified rear can be used for registration. For the first inspection of hoisting machinery, see Appendix A.
Q:How to select tower crane type according to the height of building? Seek explanation
Choosing tower cranes is not based on height, but is based on the coverage area. The height is only a reference value. Now high-rise QTZ can be attached to the wall, so height is not a problem. Let's talk about the shape of your building, and the best of the 5
Q:What are the types of common tower cranes?
(2) according to the transition typeSlewing tower crane: slewing support tower mounted on top of tower. It can be divided into tower cap, rotary tower, top rotating type, upper slewing platform type and rotary column type.The rotary tower crane, slewing tower body is arranged at the bottom, the tower to tower crane chassis rotation.
Q:Tower crane 5610 why is it called QTZ63?
Q is reusable, T is tower, Z is jack up, and combined is jack up tower crane. (this is the earliest known China, now the various manufacturers have their own name, some close to the French take, such as F0/23B, the tower jib 50 meters, a maximum weight of 10 tons, 2.3 tons of weight lifting arm tip)80 is the moment, the unit is t * m, (should say is the force multiplied by distance, 800kn.m) for 5613 cranes, the maximum lifting capacity of 8 tons, the boom length is 56 meters, arm tip lifting weight 1.3 tons, maximum weight in the range of 2.5 meters ---13 meters, calculation of 8 * 13=104, so the name is QTZ104, now the provisions should be a QTZ104, but before, people think is 8 tons of weight, so called QTZ80, is now available.
Q:The earthing resistance of tower crane shall not be greater than that of the tower crane
Three. Technical specification for temporary power safety on construction site JGJ 46-20055.4.2 within the construction site crane, derrick and Longmen machinery equipment, metal structure and steel scaffolding and under construction in construction projects, when lightning protection devices in adjacent buildings, structures and other facilities outside the protect zone of lightning arrester, lightning protection device should be installed in accordance with the provisions of.5.4.7 lightning protection electrical equipment machinery, connected to the PE line must repeat grounding at the same time, with a repeat of the mechanical and electrical equipment grounding and lightning protection grounding machines can share the same grounding body, but should be consistent with the repeated grounding resistance of grounding resistance requirements.The electrical equipment of 9.2.1 tower crane shall comply with the requirements of the current national standard "safety regulations for tower cranes" GB5144.9.2.2 tower cranes shall be subjected to repeated earthing and lightning protection grounding as specified in Clause 5.4.7 of this code. The earthing device of the track type tower crane shall comply with the following requirements:L the two ends of the rail are respectively provided with a grounding device;The joint of the 2 track is electrically connected, and the ends of the two tracks are electrically connected in the loop;3 long track every is not more than 30m and a grounding device.
Q:Which is the main basis for the disassembly and assembly process planning of tower cranes?
.0.11 tower cranes should be prepared before the installation of special construction program, and should include the following contents:1 project overview;2 installation location, plane and elevation;3 types of tower cranes and technical parameters of performance;4 basic and attachment device settings;5, climbing conditions and adhesion nodes detail;6 installation sequence and safety quality requirements;7 weight and suspension position of main mounting parts;8 installation of auxiliary equipment type, performance and layout;9 power settings;10 construction personnel allocation;11 rigging and special tools;
Q:How to build a tower crane?
7, the boom of the horizontal installation, setup of counterweight, main hoist installation, installation sequence of these large, there are provisions in the instructions.8 、 install operating room, main cable and control cable. Installation of crane wire rope, hook, lifting the car has been in the assembly of the boom when installed.9, at this time has completed the basic installation, the later self lifting installation, the main work by the tower crane itself equipment and artificial to complete.10 tower crane from basic height to work height.Each type of tower crane has different self lifting mounting methods. In fact, in addition to carrying heavy loads, the installation of a large number of high-strength bolts is a heavy work.11, the above is the general procedure, the actual installation work in strict accordance with the installation instructions. According to historical experience, tower crane installation accidents often occur in some professional installation team.12, the old type of tower crane installation is relatively simple, but also have independent installation, and now the development of automobile crane is not a must, general use of car crane can complete all the installation.
Q:What is the calibration value of a tower crane?
Do you mean the calibration value of crane lifting moment? That should be the product of the maximum magnitude of the tower crane and the corresponding maximum lifting load.
Q:How many tons are tower cranes QTZ125?
1 tower crane QTZ125 has 8 tons, also has 10 tons.2, QTZ125 tower crane is Shandong fuiou Co., make full use of group technology, modular design and finite element analysis technology, the "computer design platform for tower crane tool designed for the newest type of hoisting and conveying machinery.The machine is a horizontal boom, trolley luffing and upper slewing hydraulic lifting crane.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range