• Tower Crane Building Machines with ISO Certificate System 1
  • Tower Crane Building Machines with ISO Certificate System 2
  • Tower Crane Building Machines with ISO Certificate System 3
  • Tower Crane Building Machines with ISO Certificate System 4
  • Tower Crane Building Machines with ISO Certificate System 5
  • Tower Crane Building Machines with ISO Certificate System 6
Tower Crane Building Machines with ISO Certificate

Tower Crane Building Machines with ISO Certificate

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detail of Tower Crane

Feature: Tower Crane                Condition: New                         Application:Building,Construction,Industrial

Rated Loading Capacity: 1.6-8T      Rated Lifting Moment:100KN.M           Max. Lifting Load: 8T

Max. Lifting Height: 200M           Span: 2.5-55M                          Place of Origin: China (Mainland)

Brand Name: CMAX                    Model Number: TC5516(QTZ100)           Certification: ISO,CE

Warranty: 1 Year                    Free standing height (M):44            Max. Working Range(M): 55

Tip Lifting Weight(T): 1.6          Working Range(M): 45,50,55             Climbing speed(M/MIN): 0.5

Counterweight(T): 17.6              Working Temperature(°C): -40-+60      Type: Topkit Tower Crane

Delivery Date:25-30 days            Mast Section Size(L*W*H)MM:1600*1600*3000             


Main Features of Tower Crane


1. TC5516(QTZ100)  have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 55m, TC5516(QTZ100)   tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

 

2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

 

3. It is original in design, reliable in operation and satisfactory in shape.

 

4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.

 

5. Provide stepless speed regulation. Oustanding in working efficiency, operating stability and reliability.

 

6. Reduce future maintenance cost.


7. With scientific layout and beautiful appearance.

 

8.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. 

 

9.After sales service will be offered which will get rid of all your worries in the purchase of our products


Specification of Tower Crane

 

Tower Crane Building Machines with ISO Certificate


Tower Crane Building Machines with ISO Certificate

Tower Crane Building Machines with ISO Certificate 

Images of Tower Crane


Tower Crane Building Machines with ISO Certificate

Tower Crane Building Machines with ISO Certificate

Tower Crane Building Machines with ISO Certificate

Tower Crane Building Machines with ISO Certificate

Tower Crane Building Machines with ISO Certificate


FAQ about Tower Crane

 

Q: What kinds of tower crane are available now? 

A: Four main categories: normal  tower crane  with cat head, internal climbing  tower crane , top less  tower crane  and luffing  tower crane.  

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



Q:why do whooping cranes migrate? If its because its to cold in the winter then why not stay in the warm weather?
It is freezing cold in the upper Midwest during the winter. Whooping cranes simply cannot find any food, even if they can endure the cold. During the summer, the upper Midwest has longer daylight hours and slightly cooler temperatures. than their wintering grounds in Florida. The longer hours allow them and their young more time to gather food. Reproduction is very taxing on the female body, even if it is just laying eggs. The young need the extra time and nutrition to grow quickly into adult sized birds. Small birds are more vulnerable to predators.
Q:how to do tower crane maintenance?
Tower cranes in construction is being inspected as part of everyday maintenance. Usually, Safety In charge or a mechanical engineer do the inspection on site. Some pointers for inspection are: 1. Machine checking including motor 2. Emergency break 3. Lifting cable checking 4. Power panel 5. others Not only the tower crane is being checked, the operator and rigger also attends daily safety toolbox to update themselves on daily safety hazards on site
Q:Is the pink paper crane used to represent Lulu?
C.C taught Nunally how to make those paper cranes. It's the symbol of love and hope, I think. It's the symbol of a dream that Lelouch was able to accomplish. And symbol of life. It has many meanings. It just depends on how you interpret it))))
Q:Did not city officials think of the danger if they toppled.
My friend, that is a good question that only the developer will have to answer to. To the City that is. The crane operator and all other parties in charge of the project will get fined by the City. In addition, they may be lawsuits. Good luck
Q:I was looking at the glidecam hd1000 for my canon vixia hv40, but now I think I'm more interested in a crane (jib).I was thinking of the advance digital 6 ft. crane. I would replace some of the plastic parts for metal.I'll be using it to film sketches and short films. (my budget is 350 dollars, but id like it to be under that)the crane is 200 dollarsthe glidecam is 370 dollars (on amazon)Thanks,Mike
Yeah corner of foremost and Higgins. Just isn't all love bought at one time or one other. We have now the love that may be purchased on the street however even in eveyday existence is just not love purchased by means of gifts, dinner, it will not be what we call soiled love however it's still purchased. Wheather it can be a man shopping for a woman or lady for man. Take care dave PS nothing is free.
Q:Do you find it ironic a crane crashed into Mecca's holiest mosque on 9/11?
yhes
Q:Tower crane attached concrete pump can be? Are there any state regulations?
Do not need to expressly can not tower crane work mode cannot withstand recoil thrust and level, and these forces or dynamic load, if the use of the tower crane is not an accident, almost impossible, then help the wall studs, will fall off, the consequences are not dare to think.
Q:I have to read this book for an AP class next year. I did read the book and i don't understand how i can discuss the setting and its possible relationship to the theme. I looked stuff up on the internet and I've asked other people who have read the book and they're just as confused as I am. I need help!
I can't tell you what to write or what you see as the theme but one of the themes in the book is man versus nature. Maybe you could discuss the setting as part of nature and what Crane seems to be saying about it. One thing that might help is a poem Crane wrote which explains how he sees things. Maybe you already know it. It's titled A man said to the universe A man said to the universe, Sir, I exist! However, replied the universe the fact has not created in me a sense of obligation. An indifferent universe. Not unlike how Thomas Hardy saw things.
Q:What is the scope of the installation and disassembly of self lifting tower cranes and the applicable range of the cost and the off-site transportation cost?
The installation and disassembly of the existing self rated tower crane, the first cost and the off-site transportation cost quota are divided by the lifting moment 1000kNm and 2000kNm of the jack up tower crane.
Q:What are the differences between the tower crane and the lift?
Tower crane is a machine which transports construction materials within the construction site based on its radial range. Usually the radius of tower crane is around 50m to 60m. Capacity ranges from 3 to 6 tons Lift is only used for vertical transport of materials or people in certain building or construction site. Capacity ranges from 2 to 4 tons.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords