Tower Crane 10 Ton TC6024 2M*2M*3M Mast Section

Ref Price:
$10,000.00 - 50,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 10T Maximum Lifting Height(M): 200M Rated Loading Capacity: 2.4T
Span: 60M Rated Load Moment: 160T.M

Product Description:

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC6024(QTZ160) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

 

Main Features of Tower Crane

 

1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 

 

Technical Sheet for TC6024

 

Free standing height (m)

50.5

Max height with attachment (m)

200

Working range can be adjustedm

485460

Min working rangem

2.5

Max lifting capacityt

10

Tip load @ 60mt

2.4

Hoist mechanism (VFD+PLC)

Falls

2

4

Lifting capacityt

02.5

05

05

010

Speedm/min

080

040

040

020

Motor

YZPBF250M1-6-45KW

Trolleying mechanism (VFD+PLC)

Speedm/min

0-56

Motor

YZPBE132S-4-5.5KW

Slewing mechanism (VFD+PLC)

Speedr/min

0-0.6

Motor

YTW112M-4-5.5KW×2

Climbing speedm/min

0.5

Counterweight  (t)

48m jib  

54m jib

60m jib

15.45

17.85

18.9

Mast section sizeL×W×Hm

2×2×3

Working temperature

-40+60

Total power (KW)

63

Power supply requirement (KVA)

230KVA for generator

Cable type ( within 35 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V      219A

Rated working voltage & current

380V                 121A

Loading diagram

 

60m jib length

R

2.5-15.85

20

32

36

40

44

50

56

60

a=2 (kg)

5000

(2.5-31.25

4874

4291

3821

3436

2971

2604

2400

a=4 (kg)

10000

7897

4804

4221

3751

3366

2901

2534

2330

 

54m jib length

R

2.5-16.25

20

30

34

36

40

44

48

50

54

a=2 (kg)

5000

(2.5-32m

4687

4405

3925

3530

3200

3054

2795

a=4 (kg)

10000

8099

5289

4617

4335

3855

3460

3130

2984

2725

 

48m jib length

R

2.5-35

39

45

48

a=2 (kg)

5000

4490

3790

3500

2.5-19

30

a=4 (kg)

10000

7890

4385

3685

3395

 

Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane TC5516 Mast Section MC Factory

 

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is it difficult to test tower cranes?
See the ability of individuals, the first ticket 650 yuan graduation card ID card (copy) medical certificate according to 3 inch 3 days learning theory exam two days of practice examination through 15 days notice thank you hope to adopt licensing
Q:What is a tower crane without a collector?
The advantage of the collector is that the tower crane can be turned on one side without any limit, and how many circles can be turned. The tower crane is basically not equipped with collector, because collector generally needs to be located at the center of the tower's turning center, so it is inconvenient for operators to go up and down.
Q:Construction tower crane operator certificate expires, how to verify?
Chongqing "construction crane operator qualification certificate", the need for training after the exam this year, Yubei District has organized a meeting, other areas will organize can ask the competent department, the Department in charge of the Certification Committee is.The following is a notice of the Yubei District organizing examination for your reference:Notice of Chongqing Yubei District construction post training center on training courses for construction lifting machinery operatorsAll construction enterprises, mechanized companies, tower crane leasing companies:In order to strengthen our district housing construction sites and municipal engineering site crane operations personnel management, improve personnel quality, prevent and reduce accidents, according to the State Quality Inspection Administration, the Ministry of construction and the Municipal Construction Committee of the spirit of the relevant documents and regulations. After the study, we decided to hold a training course for construction machinery operators, and hereby notify the relevant matters as follows:I. training objects and registration requirementsWhere the construction enterprises in our district and the relevant units engaged in or engaged in the work, at least 18 years of age, women are not more than 55 years of age, male, no more than 60 years of age, junior high school education, good health.
Q:S930 M50 (M125/75) level jib tower crane about how much money
Do you want to see is that, generally is Sishijiwan
Q:All types of jack up cranes. How is the maximum lifting torque converted?
The moment of the tower crane is set up by the factory, and can not be changed. How do you want to convert it?If the nominal torque is converted to kn tons, 1 tons is equal to 9.8 kn.
Q:Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q:How often should the crane be inspected regularly?
Lifting machines are inspected regularly every two years, and explosion-proof lifting machines shall be inspected regularly every year. Must have the corresponding inspection qualification inspection.
Q:Tower crane TC6013A-6-A2, what does "A-6-A2" mean later?
QTZ100 in fact, there are two symbols behind T.M, which is used in the country.Q is lifting, T is tower, and Z is self elevating. The 100 is its lifting torque, which means 100 tons. Meters (T.M).
Q:Equipment safety of tower crane
Safe distance tower and transmission line is not up to the requirements of the tower frame door frame to design, erection principle to power erection, do not use metal materials, bamboo and other materials can be used. The distance between a bamboo pole and a power line shall not be less than 1m, and a certain degree of stability shall be taken to prevent the wind from blowing. The tower crane height and bottom bearing size ratio is large, and the center of gravity of the tower body, high torque, braking frequency, impact force, in order to increase its stability, we will analysis the main causes of the tilting of the tower crane has the following:Overloading. Different types of cranes usually adopts the lifting torque based control, when the amplitude exceeds the rated load weight increase or the corresponding weights, the overturning moment more than stable moment of it, it may cause the collapse of the tower crane.Two, inclined hanging. Slant weights will increase its overturning moment, the lifting point will produce horizontal force and vertical force on the crane, bottom supporting point will produce an additional overturning moment, and the stability coefficient is reduced, resulting in tower crane collapse.Three, the tower crane foundation is uneven, the ground endurance is insufficient, the perpendicularity error is too big, also can cause the tower crane to overturn the moment to increase, causes the tower crane stability to reduce. Therefore, we should proceed from these key factors to strictly check, check and check, and prevent major equipment personal safety accidents. State explicitly eliminated the model should resolutely prohibit the use of, in disrepair, tower crane in the identification of the repair, to limit the use of load, tower crane for the use of fixed number of years there is no uniform standards, opinions vary, different places have different provisions.
Q:What courses should I take to buy the tower crane to be installed?
First in construction project. When the installation is completed, when it is ready to use, transfer to fixed assets account and make depreciation

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range