Tower Crane 10 Ton Mechanism VFD in China
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Item specifice
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC6016(QTZ100)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC6016
Free standing height (m) | 50.5 | |||||||
Max height with attachment (m) | 200 | |||||||
Working range can be adjusted(m) | 48、54、60 | |||||||
Min working range(m) | 2.5 | |||||||
Max lifting capacity(t) | 10 | |||||||
Tip load @ 60m(t) | 1.6 | |||||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | |||||
Lifting capacity(t) | 0-2.5 | 0-5 | 0-5 | 0-10 | ||||
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | ||||
Motor | YZPBF250M1-6-45KW | |||||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | ||||||
Motor | YPBE132S-4-5.5KW | |||||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | ||||||
Motor | YTW112M-4-4KW×2 | |||||||
Climbing speed(m/min) | 0.5 | |||||||
Counterweight(t) | 48m jib | 54m jib | 60m jib | |||||
15.45 | 17.85 | 18.9 | ||||||
Mast section size(L×W×H)m | 2×2×3 | |||||||
Working temperature | -40-+60℃ | |||||||
Total power (KW) | 60 | |||||||
Power supply requirement (KVA) | 190KVA for generator | |||||||
Cable type ( within 35 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | |||||||
380V×95%=361V 210A | ||||||||
Rated working voltage & current | 380V 116A | |||||||
Loading diagram:
60m jib length:
R | 2.5-22.4 | 30 | 40 | 50 | 60 | ||
a=2 (kg) | 5000 | 3646 | 2630 | 2014 | 1600 | ||
R | 2.5-11.245 | 20 | 30 | 40 | 50 | 60 | |
a=4 (kg) | 10000 | 5564 | 3573 | 2560 | 1944 | 1530 | |
54m jib length:
R | 2.5-24.55 | 30 | 40 | 50 | 54 | |
a=2 (kg) | 5000 | 4028 | 2919 | 2246 | 2046 | |
2.5-12.36 | 20 | 30 | 40 | 50 | 54 | |
a=4 (kg) | 10000 | 6130 | 3958 | 2849 | 2176 | 1976 |
48m jib length:
R | 2.5-25.69 | 30 | 40 | 48 | |
a=2 (kg) | 5000 | 4232 | 3073 | 2488 | |
2.5-12.96 | 20 | 30 | 40 | 48 | |
a=4 (kg) | 10000 | 6431 | 4162 | 3003 | 2418 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q:I want to join
- www.okorder
- Q:Please try to give information on the questions bellow: .What the climate was in the Japanese Crane's habitat (high, lows, averages, precipitation) . Plants in the Japanese crane's habitat .2-3 major animals in its habitat .2-3 minor animals in its habitatTHANK YOU SO MUCH!!! .
- in the east Hokkaido, the north island of japan. some japanese crane in russia goes to north korea in winter, but cranes in hokkaido stay all through the year.
- Q:my father is owning a crane manufacturing business I hav given my ssc wat should I study after ssc IT, mechanical engg., design engg. and others (plz. specify) ?
- Without being too critical, the first thing you need to do is improve your English so that you will be a huge help in the company whether in engineering or sales. Cranes require lots of engineering in weight handling (mechanical), automation and controls including instrumentation (electrical) and a tertiary field in engineering is in stopping and starting (clutches and brakes) which can be mechanical or hydraulic engineering. A new filed is metalurgy which is concerned with the way metals perform (stress), lighter,stronger, etc. Take your choice. Mpho
- Q:How much is a team of 40 tower crane
- Tower crane rental generally do not rent pricing, can not count number, not today is installed, removed tomorrow!Usually on a monthly basis, with or without use!
- Q:The cantilever part has to stay at least 6-12 inches off the ground.
- My son and I used to do a couple of things with them. We would make masks. Get some of the cheap paper plates, glue the sticks to them - cut out and decorate. You can make animals, people, it is a lot of fun. The log cabin is a great idea, but a little hard for that age. So we made our log cabins on construction paper, Glue the stick on there in the shape of a house. Good times!
- Q:What kinds of concrete are there in construction crane? Mainly for the construction of this area ~ ~ ~!There is no lifting machinery issued by the state what ~ ~ which detailed description of the construction machinery lifting what?
- The most common are tower cranes, elevators, and freight lifts. The big construction enterprise also has the track type tower crane
- Q:How do they get big cranes up on skyscrapers for renovation? and how do they bring it down? And where they keep the cranes after done?
- IT IS BUILT UP SECTION BY SECTION AND THEN TAKE IT DOWN THE SAME WAY.
- Q:It is a single blade knife very similar to a case sodbuster
- There okorder /
- Q:Brief introduction of ten no hanging criterion for tower crane operation
- 1, hanging weight more than no mechanical properties allow the crane; 2, the command signal is unknown, the weight is unknown, the dim light to hang; 3 working face, stand or floating active objects not hanging;
- Q:I was wondering if this is possible. The wall we have designed is very close to an existing retaining wall. In order to properly form and waterproof the wall we would have to demo that existing retaining wall. My idea was to build it off site, waterproof it, and then crane it into its location. Is this possible? any similar methods? thanks
- If you use precast concrete sections it can be done. You can even have a decorative side if that is required. You might need to have some form of interlocking connections to tie the whole thing together. Depending on its height there might also be a need for anchors to keep it from trying to tip. Without more very detailed information it is difficult to really answer this question. As an example: depending on the type of soil and the height of the wall it is possible to remove the existing wall and install a new one in a day if you use something like a keystone system.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane 10 Ton Mechanism VFD in China
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords