Topkit Tower Crane TC7030 with Jib legth of 70M

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

TC7030 Description

Condition: New

Rated Loading Capacity: 12t

Rated Lifting Moment: 2500KN.m

Max. Lifting Load: 12t

Max. Lifting Height: 180m

Span: 70m

Place of Origin: Shandong, China (Mainland)

Model Number: TC7030

Certification: CE,ISO and GOST

Warranty: One year

After-sales Service Provided: Engineers available to service machinery overseas

Color: Yellow or optional

Electric components: Schneider

Tower section: Sheet-mounted type for tower crane for sale

Section dimension: 2*2*3m

Working environment temperature: -20℃~40℃

Raw materials: high quality manganese steel for 10t tower crane

Configurations: air conditioner, black box and remote control

Company type: factory for construction tower crane

 

TC7030 Features

TC7030Tower Crane is a new type of construction tower equipment that is researched and designed by Institute of Building Mechanization of China Academy of Building Research based on large formwork construction technology. It has the following characteristics:

2) Ahead of all domestic competitors,  we are the first manufacture to adopt lifting rope verticality limit mechanism, which decreases the lifting rope vertical angle under free load lifting mode, and highly improves the tower crane steering performance.

4) We adopt to use Dual drawbars structure on lifting boom, which enables the lifting boom to be under no stress at lifting surface other than uniaxial stress, and moreover, it gets rid of the stress peak. It greatly improves the fatigue safety performance of lifting boom. 

6) The equipment adopts to use non-contact computer control system, which provides the high reliability and full functions to avoid drivers' miss-operation.

 

TC7030 Specifications

Topkit Tower Crane TC7030 with Jib legth of 70M 

 

TC7030  Pictures

 

Topkit Tower Crane TC7030 with Jib legth of 70M

Topkit Tower Crane TC7030 with Jib legth of 70M

 

 

Topkit Tower Crane TC7030 with Jib legth of 70M

Topkit Tower Crane TC7030 with Jib legth of 70M

 

TC7030 FAQ

Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.

Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the insulation resistance of tower crane?
Three. Technical specification for temporary power safety on construction site JGJ 46-20055.4.2 within the construction site crane, derrick and Longmen machinery equipment, metal structure and steel scaffolding and under construction in construction projects, when lightning protection devices in adjacent buildings, structures and other facilities outside the protect zone of lightning arrester, lightning protection device should be installed in accordance with the provisions of.5.4.7 lightning protection electrical equipment machinery, connected to the PE line must repeat grounding at the same time, with a repeat of the mechanical and electrical equipment grounding and lightning protection grounding machines can share the same grounding body, but should be consistent with the repeated grounding resistance of grounding resistance requirements.The electrical equipment of 9.2.1 tower crane shall comply with the requirements of the current national standard "safety regulations for tower cranes" GB5144.9.2.2 tower cranes shall be subjected to repeated earthing and lightning protection grounding as specified in Clause 5.4.7 of this code. The earthing device of the track type tower crane shall comply with the following requirements:L the two ends of the rail are respectively provided with a grounding device;The joint of the 2 track is electrically connected, and the ends of the two tracks are electrically connected in the loop;3 long track every is not more than 30m and a grounding device.
Q:how long would it take to make a thousand paper cranes?
It all depends on how fast you can make one paper crane and how many hours you have available each day. If you made 15 an hour for 10 hours each day (150 cranes a day) for 7 days you would have 1050 cranes. You will probably find that you begin to go faster, the more cranes you make. However, after 2 or 3 days you will get sore hands and this will slow you down again. It's easier when you work as a team.
Q:How many stops are there in a tower crane? Where are they located in the tower cranes?
The hook has an upper limit on the windlassThe car has front and rear spacing on the trolley hoistSlewing is limited to the slewing gearAnd the torque limit is on the spireWeight limit
Q:crane jumper?
I googled crane jumper and came up with nothing. Not to say there isn't such a creature, that could be a regional name for it, it might be called something else.
Q:Is there a crane big enough to lift Hillary off the yoga matt when she has finished her yoga?
Unfortunatly....
Q:If there are cranes by a small pond should there be fish?
Hmm... cranes don't normally eat fish. They eat mostly insects and the occasional frog or lizard. If there are herons or cormorants at this little lake of yours, then there's your sign fish are present. It won't take these birds long to search an area for fish. If there are no fish, the birds will move on fairly quick. If they're there every day, well... do what comes naturally.
Q:I am about to take appointed persons test (crane) how do you calculate loadings for lifting and point loading?
If you are going to be operating a crane, you need to do this on your own. People's lives will depend on you having a good knowledge in this area. .
Q:How are 100 ft. construction cranes assembled?
Read the guy above me his answer is awesome but choose me for your best answer ok
Q:When should a crane be load tested?
if crane using regularly more then 8 hrs test should be every 4 months 8 months and full sevice at 12 months............ Load Testing Services ACECO provides inhouse vertical load testing services for load bearing equipment. Examples of equipment that can be load tested: • Below the hook lifting devices • Hoists • Hooks • Testing can be performed to meet ASME B30.20, B30.10, and B30.16 as well as ANSI N14.6. • Standard inhouse 50 ton load testing capacity. • Ability to test higher load capacity devices (Up to 5,000,000 pounds). • Have tested up to 640,000 pounds (320 tons). • Engineering manufacturing available to provide lift fixtures for test purposes. • Can provide nondestructive testing of critical welds and critical locations. • Inhouse capability to make weld repairs using AWS D1.1 qualified procedures and welders. • Calibrated test weights available. • Testing can be performed in accordance with 10CFR50,Appendix B Quality Program. • Certificates of Test and/or Test Reports can be provided. • Can provide onsite load testing services, including supply of calibrated weights.
Q:What are some ideas to build a crane out of Popsicle sticks?
My son and I used to do a couple of things with them. We would make masks. Get some of the cheap paper plates, glue the sticks to them - cut out and decorate. You can make animals, people, it is a lot of fun. The log cabin is a great idea, but a little hard for that age. So we made our log cabins on construction paper, Glue the stick on there in the shape of a house. Good times!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range