Topkit Tower Crane TC6018 with Jib legth of 60M

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

TC6018  Description

Condition: New

Rated Loading Capacity: 10t

Rated Lifting Moment: 1250KN.m

Max. Lifting Load: 10t

Max. Lifting Height: 163m

Span: 60m

Place of Origin: Shandong, China (Mainland)

Model Number: QTZ125 tower crane for sale

Certification: CE,ISO and GOST

Warranty: One year

After-sales Service Provided: Engineers available to service machinery overseas

Color: Yellow or optional

Electric components: Schneider

Tower section: Sheet-mounted type for tower crane for sale

Section dimension: 2*2*3m

Working environment temperature: -20℃~40℃

Raw materials: high quality manganese steel for 10t tower crane

Configurations: air conditioner, black box and remote control

Company type: factory for construction tower crane

 

TC6018 Features

1) Lifting multiplying factor switchover automatically, without operator's intervention.

2) Our tower sections are exchangeable, which provide our customers more conveniences.

3) Adopts VVVF stepless speed variation device for lifting, radius changing and slewing mechanisms, to make sure it works steadily and effectively, it also lowers the maintenance cost.

4) The equipment adopts to use non-contact computer control system, which provides the high reliability and full functions to avoid drivers' miss-operation.

 

TC6018  Specifications

 Topkit Tower Crane TC6018  with Jib legth of 60M

 

TC6018   Pictures

 

Topkit Tower Crane TC6018  with Jib legth of 60M

Topkit Tower Crane TC6018  with Jib legth of 60M

Topkit Tower Crane TC6018  with Jib legth of 60M

Topkit Tower Crane TC6018  with Jib legth of 60M

 

TC6018 FAQ

Q: What certificate the tower crane get?

A: CNBM certificate for lifting machinery mainly includes:  ISO9001 Certification, / Manufacture License of special equipment by AQSIQ, / The Installation, Alteration, and Repair & Maintenance License of special equipment from AQSIQ, UAE certificate issued by UAE Authority, / CE certificate for the motors adopted on our construction equipments, and so on.

 

Q: What is tower crane?

A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How high the tower crane needs to be installed with the wall pole. How is it stipulated in the national standard?
The construction of tower crane installation, operation and dismantling safety technical regulations "(JGJ196-2010) design provisions in article 3.3 attachment device of tower crane: when the tower crane attachment for use, attachment device settings and free height should comply with the provisions of the instructions; when the attachment level distance, attachment spacing does not meet the the instructions should be carried out, design calculation and drawing the map produced and written instructions; the attachment device and embedded parts shall be the original component manufacturer or made with the corresponding ability of the enterprise; the attached device design, the main structure of the building to support the checking.The regulations on the supervision and administration of the safety of building cranes (Ministry of Construction No. 166th) states: "it is prohibited to install the standard sections and attachments of non original manufacturing plants on the free construction lifting machinery.".The independent height of the tower crane is determined by the manufacturer's manual. The independent height of the tower cranes of different manufacturers and different types is different. The installation of the tower crane needs to be installed with a wall rod. The specifications are stipulated in the instruction. The national standard requires the instruction of the manufacturer's manual.
Q:How many stops are there in a tower crane? Where are they located in the tower cranes?
The hook has an upper limit on the windlassThe car has front and rear spacing on the trolley hoistSlewing is limited to the slewing gearAnd the torque limit is on the spireWeight limit
Q:What special operators should be equipped for the installation and disassembly of tower cranes?
2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
Q:What is the definition of lifting, slewing and luffing of tower cranes?
Rotary is cantilever tower crane tower crane rotary shaft winding;Is the hook shaft distance amplitude change;
Q:Equipment safety of tower crane
The boom of a tower crane is divided into two types: horizontal and compressed arms. When the movable arm is horizontal, the carrier car runs along the horizontal arm with variable amplitude and amplitude, and the movable arm is longer, but the boom has a larger deadweight. The arm for the strut type when the tractor boom luffing mechanism pitch amplitude, amplitude motion than horizontal smooth, but its relatively small weight.The weight of a tower crane varies with its amplitude. The product of the weight and the amplitude is called the load torque, which is the main technical parameter of the crane. Through the rotary mechanism and slewing tower crane, lifting height, rotation and walking the inertial mass, so it needs to have good control performance, especially the lifting mechanism can fast, slow, heavy and light load installation fretting. In addition to the general use of resistance speed regulation, but also often use eddy current brake, FM, pole change, SCR and mechanical and electrical joint speed regulation. When the crane in the layout to drawing, especially in real estate development area, residential buildings, such as tower crane, but also to consider the safety distance of adjacent tower crane, two in horizontal and vertical direction to ensure the safe distance of not less than 2m, the adjacent tower crane tower crane and interference can not occur. Try to ensure that the tower crane in the wind is too large to be free of rotation. The safe distance between the rear arm of tower crane and adjacent buildings shall be no less than 50cm. The safe distance between tower crane and power line meets the requirement.
Q:What is the inspection certificate for tower cranes?
Inspection certificate of tower crane must have two certificates:1, the manufacturer issued its own "product quality certificate"2. The product quality supervision and inspection certificate issued by the Technical Supervision Bureau
Q:What are the parts of a tower crane? What are their main functions?
Jacking frame: placing slewing mechanism, when lifting tower top, bearing the weight of tower crane balance arm, main arm and tower cap.Standard section: support the weight of tower crane itself and lift the weight of heavy load, and resist the overturning moment of tower crane.Institutions include the followingLifting mechanism: lifting heavy objects.Luffing mechanism: lifting the car to change the rotation center distance.: the upper part of the slewing mechanism of tower crane (including the main arm and balance arm and tower cap) around the rotation center of rotation.Lifting mechanism: tower crane lifting, the upper part of the tower crane elevated hydraulic power system.Walking mechanism: the crane can walk on the track.OtherDrivers’ RoomElectric boxLinkage tableA foundation bearing platform or trackOther safety devices
Q:What does "slewing up" and "under rotating" in the slewing form of a tower crane mean?
In short, when the tower rotates in the form of a tower, the tower is stationary (ie does not follow the rotation), and the form of the lower turn is the tower will rotate. As for the reasons, the main consideration is the actual needs.
Q:In order to ensure the stability of tower cranes, generally along the height of the tower and building a number of meters attached
Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
Q:When building tall buildings, where is the bottom of the tower crane installed?
A firm foundation is built before the tower crane is used, and then the crane is fixed to the foundation

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range