Top quality Parallel Thread Rebar Coupler

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Material:45#high quality carbon steel.

2.Application: 12--50mm.

3.High strength,low cost,simple operation.

1#

Coupler SizeOuter Dia(±0.5mm)Inner Dia(±0.5mm)Length(±2mm)Thread Pitch(mm)Thread Angle(º)Weight/Pc(kg)
D121910.2835M12*1.75P60/750.036
D142112.5538M14.8*2.5P60/750.068
D162414.5043M16.8*2.5P60/750.099
D182716.3548M18.6*2.5P60/750.125
D202918.4553M20.6*2.5P60/750.180
D223320.3558M22.6*2.5P60/750.205
D253723.1563M26.0*3.0P60/750.317
D284125.9568M28.6*3.0P60/750.399
D324730.1580M32.8*3.0P60/750.640
D365433.8583M36.7*3.5P60/750.900
D405937.5588M40.4*3.5P60/751.099
D507447.10125M50.4*3.5P751.298

3#

Coupler SizeOD(±0.5mm)Length(±2mm)Thread PitchThread Angle(º)G/W(kgs)
D1422382.5750.068
D1625432.5750.099
D1828482.5750.125
D2030532.5750.180
D2234582.5750.205
D2538633.0750.317
D2842683.0750.399
D3248803.0750.640
D3655833.5750.900
D4059883.5751.099

Rebar Coupler Advantages:

----Adopt National Standard 45# igh quality carbon steelas raw meterial.

----High strength, tensile test usually more than 600Mpa,Tensile strength can reach 110%of yiled strength of parent rebar.

----The product has passed ISO9001 International Quality System Certification.

----We can design,produce weldable or other type rebar couper as per customers` requirement.

Tengzhong Machinery Co.,Ltd

A processional  manufacture of rebar mechanical splicing equipment,rebar processing machinery,rebar coupler and related products.It is a membership of construction machinery trade of China quality cotrol association.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I plan to get scaffolding/industrial, but I need some advice?
You really shouldn't get the studs. The holes won't be properly aligned, and that will cause a lot of stress/trauma when you put in the bar. I would suggest just wearing your hair down from now on. Industrials are infamously finicky. I would wait a *least* a year and a half before taking it out for longer than a minute or two.
Q:Is my industrial/ scaffolding piercing okay?
It looks like dried blood to me. Make sure you clean it at least twice a day with warm water and sea salt. I would go back to the shop that pierced it to see what theey say about it. Your industrial will be sore for a while. I waited six months to take my bar out and it was still kind of sore. One tip I can give is to use a spray bottle for your warm water and salt water. Its easy to make sure your really cleaning your piercing! Good luck!
Q:Bump on my ear after scaffold piercing?
the lump is basically skin. it's called a keloid. you will get them quite a lot with your scaffold. i got mine done like 3 months ago and i got a small tiny one right now, it is a part of the healing process and it is caused by touching it; not physically touching it but clothes rubbing it. it's perfectly normal to get them. to get rid of it use tea tree oil, get a q-tip put it into warm water and put a drop or two of the oil on the tip and just gently tap it on your lump. after like few days you will see that it will become smaller. hope i helped (:
Q:book regarding scaffolding?
are u refering to the scarlet letter? where the scaffold appears many times?
Q:What are the right steps to erect the frame scaffolding?
Not a men's health issue or concern.
Q:Fastener type steel pipe outside the scaffolding of the accessories name
Foam board is used to do insulation, and play the role of thermal insulation. You can not keep the foam in the gypsum board. Sound insulation is mineral wool, the higher the density of the better sound insulation. Recommended cherry blossom card, about open to move the sticks to visit the state poems Bao Jian is 11 yuan a square.
Q:What are the specific requirements for the formwork of the fastener type steel pipe?
EPS board (also known as benzene board, foam board) is made of polystyrene board short. It is made from ExpandablePolystyrene, which is made by pre-blending, dumpling, molding, drying and cutting. It can be made into different density, different shapes of foam products, but also can produce a variety of different thickness of the foam sheet. XPS is mainly used for wall insulation, there is the protection of some items on the surface.
Q:whom does Hester recognize in the crowd as she stands on the scaffold? why does this discovery both confuse an?
She recognizes Bobby McFerrin as the one who raped her grandmother and got away with it.
Q:does home insurance cover you if you have scaffolding up?
The question is too vague. Cover you for WHAT? For an employee falling off the scaffolding? For the scaffolding being stolen? If the Scaffolding falls on a neighbor's car? Having Scaffolding up indicates you're having someone do work on the building - usually painting. It's only up for a short time - a week, or however long it takes to paint the house. If YOU have a business, your homeowners policy won't cover any of YOUR business liability - or your business property. You're going to have to be A LOT more specific. But also, you can call your agent, and ask THEM.
Q:Construction of cast-in-place floor of the use of fastener-type steel pipe support system, which is full of scaffolding, or belong to the template and support system?
Longitudinal sweeping pole should be fixed with fast nuts at a distance of not more than 200mm from the bottom of the pole The horizontal sweep bar should be fastened to the pole on the underside of the longitudinal sweep bar scaffolding pole base is not the same height, the height of the longitudinal sweep must be extended to the lower two spans and pole fixed, height difference should not be greater than 1m The distance from the pole shaft above the slope to the slope should not be less than 500mm single, double scaffolding bottom step should not be greater than 2m single row, double row and full house scaffolding pole in addition to the top of the top step, the rest of the layers of the joints must be used to connect the fastener connection scaffolding pole docking, lap should meet the following requirements: When the pole with docking long, the pole of the docking fasteners should be staggered, two adjacent rod joints should not be set in sync The distance between the joints of the joints to the main node should not be greater than 1/3 of the step distance; When the pole is used to lap, the distance between the two joints is not more than 500 mm; For a long time, the lap length should not be less than 1m and should be fixed with not less than 2 rotary fasteners The distance from the edge to the end of the end fastener cover shall not be less than 100 mm scaffolding pole top railings should be higher than the top of the wall 1m, should be higher than the top of the cornice 15m

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range