• Timber Beam with Easy Installation and Dismantle System 1
  • Timber Beam with Easy Installation and Dismantle System 2
Timber Beam with Easy Installation and Dismantle

Timber Beam with Easy Installation and Dismantle

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Structure of Timber Beam Wall Formwork Description 

 

The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used to reinforce the corner. Timber beam formwork is a highly efficient and convenient system for medium area slab project. They can be transported to next position as whole table units whether by trolley or by crane lift.  

 

2. Main Features of Timber beam wall formworks

 

    -Fast in transportation and concrete casting due to pre-assmebled table unit.
    -Thus save more than a half time & labor cost compared with Slab Flex 20 formwork.
    -Can choose shoring props or towers according to different loadings and height.

 

3. Timber beam wall formwork Images

 

Timber Beam with Easy Installation and Dismantle

 

Timber Beam with Easy Installation and Dismantle

 

4. Timber Beam Formwork Specifications

 

Timber beam column formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.

 

5.FAQ of  Timber Beam Formwork

   

1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

2) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

 3) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.

Q:i live in Washington, and i want one badly ha. i went the other day and asked for the industrial and they said 2 years ago it was made illegal to get done unless your 18 and older, but does the scaffold hold the same law? i need help ASAP!!
an industrial and a scaffold are the same thing, why would they allow it to one name of it but not the other, and most piercings you have to be 18+ to get, and some you can get at 16, very few you can get any younger than that
Q:is this right any answers please
well id say not. go and talk to the owner of the company, there may have just been a mistake other wise go to you citezen advice and they will be able to better inform you
Q:i need help with the musical elements of these songs, such as the instrumentation, rhythm, texture, timbre and key. thanks
I would suggest you take the score (any good music library should have it) and listen to the music. That would give you all the information you need. It doesn't take THAT long.
Q:the shop said i might have the wrong ear shape, does anyone know of any pictures or diagrams of the wrong shape so i can see. Also what are some do's and do not's. not like cleaning cos i've read loads of them, just anything else useful. thankssharotoxxx
Hello You should have asked them I dunno whats that mean the wrong ear shape But you can always do a cartilage piercing, it looks a way better Good luck
Q:I bought 100 tons of scaffolding steel pipe, according to the 150 tons of rack pipe to prepare various kinds of fasteners and fastening screws. How to calculate.. Thank you all
For flexural members:When combined with wind load is 1.2SGK+1.4SQKCombined wind load is 1.2SGK+1.4SGKFor axial compression member:When combined with wind load is 1.2SGK+1.4SQKThe combined wind load is.2SGK+1.4 * 0.85
Q:What are the requirements for the broken seam connection of bowl buckle scaffold. For example, broken seam on both sides of the vertical pole is very neat, with a steel pipe fastener connection side to connect a number of vertical pole, both sides of the rod is not on a line, but also how to connect?
Do you mean to do the two adjacent joint? Specification requirements shall not be within the same span and within the same level, specific referenceJGJ 1302011 steel tubular scaffolding construction safety technical specification
Q:Mechanical model, stability, etc.
Scaffolding classificationScaffolding is a temporary structure frame for the construction, installation and construction of materials, materials and construction operations.1 according to the materials used: divided into wooden scaffolding, steel scaffolding and ladders.2 according to whether it can be moved: divided into mobile scaffolding and fixed scaffolding.3 according to the nature of the construction: divided into construction scaffolding and installation scaffolding.4 according to the form and use of the overlap into
Q:stands there.?(from the scarlet letter book.)
I would describe her as strong. The woman has convictions, and she's not ashamed of what she's done. Instead of giving in and telling everybody who the father is so she can lessen her sentence, she stands firm in her actions.
Q:Cost of rent per day per month per ton of scaffolding
Different leasing companies, fees are different
Q:I've been watching Japanese anime shows and some of them use a historical background. I would like to have a general idea of what is accepted history and what is alternate. For example; Tokyo was once called Edo. I don't know anything about Japanese history. I'd like to fill in this yawning chasm in my education.
Henshall, a New Zealand professor of Japanese studies, has written a lively and literate introduction to the vast sweep of Japanese history, providing a well-balanced overview that is accessible to the novice without being at all dumbed down. Although his emphasis is on political history, he devotes enough attention to cultural, literary, religious, and economic developments to give the reader a good sense of these spheres as well. He even manages to flavor the text with excerpts from poetry and key historical documents. Roughly equal weight is given to pre-modern and modern Japan. Henshall focuses on key issues in each of his six chapters and provides very useful tables summarizing both historical chronology and the main values and practices that characterized each period. A paperback version of this book, if made available, would find its way into many university surveys of East Asian history.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords