Timber Beam with Easy Installation and Dismantle

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

1. Structure of Timber Beam Wall Formwork Description 

 

The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used to reinforce the corner. Timber beam formwork is a highly efficient and convenient system for medium area slab project. They can be transported to next position as whole table units whether by trolley or by crane lift.  

 

2. Main Features of Timber beam wall formworks

 

    -Fast in transportation and concrete casting due to pre-assmebled table unit.
    -Thus save more than a half time & labor cost compared with Slab Flex 20 formwork.
    -Can choose shoring props or towers according to different loadings and height.

 

3. Timber beam wall formwork Images

 

Timber Beam with Easy Installation and Dismantle

 

Timber Beam with Easy Installation and Dismantle

 

4. Timber Beam Formwork Specifications

 

Timber beam column formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.

 

5.FAQ of  Timber Beam Formwork

   

1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

2) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

 3) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:hester and pearl stand on the scaffold in the market place. how would you describe hester's attitude as she...?
I would describe her as strong. The woman has convictions, and she's not ashamed of what she's done. Instead of giving in and telling everybody who the father is so she can lessen her sentence, she stands firm in her actions.
Q:how long untill i can change my scaffolding bar?
U shouldn't exchange it. i've got had undesirable journey with that. If the bar that it replaced into pierced with dosent worsen ur tongue then use the comparable bar and purely exchange the ball. Ur working a hazard changing the bar bc u do not kno if the hot bar will infect or irratate ur tongue. If u do pick to alter it wait apprx 6wks except ur putting yet another a million in as quickly as u take the 1st a million out. U can exchange the ball suitable after u get it pierced bc the ball dosent remember as long as u save the bar in.
Q:Industrial/scaffolding piercings?
you can use the same hole if it is in a suitable position
Q:Two window washers, Bob and Joe, are on a 3.00 m long, 295 N scaffold supported by two cables attached to its?
Rainwater forgot about the weight of plank itself... So: (0.5 m)×(910 N) + (1 m)×(500 N) + (1.5 m)×(295 N) + (2 m)×(730 N) = (3 m)× T₁ T₁ = 952.5 N (1 m)×(730 N) + (1.5 m)×(295 N) + (2 m)×(500 N) + (2.5 m)×(910 N) = (3 m)× T₂ T₂ = 1482.5 N Check: (952.5 N) + (1482.5 N) ?=? (730 N) + (295 N) + (500 N) + (910 N) (2435 N) !=! (2435 N) Seems OK ;-)
Q:Is it possible to have a scaffold piercing with a helix piercing on one ear?
This is a tad of a hard question to answer with no picture, but I would tentatively say, there should be no problem. Barring any complication- bad placement of the previous piercing, insufficient anatomy, bad scar tissue, or the like- adding several piercings to one area of the ear is generally not difficult. As for pain, it is very personal, but it can be very painful for some people. I have had over 15 piercings done, and would rate this one as painful because of how long it takes to heal. They take many months, often as much as 6 months to a year, and are very very sensitive for a long time. It will take a while before accidental bashes don't hurt, or you can sleep on it safely. Be prepared to wait it out. But take heart- mine took a year to heal, but now, I can mash the bar around and such and there is no pain. As long as the holes are pierced correctly and heal well, they will eventually get better.
Q:Bowl buckle scaffold from the machine to pull out the upper and lower bowl
You can refer to the "construction of bowl buckle scaffold safety technical specifications" JGJ 166-2008
Q:Fixed in the construction of steel tubular scaffolding 3 rows of what is meant
Generally divided into single row scaffolding, double scaffolding and full scaffold.Single row scaffolding, the frame body is composed of a vertical rod; because of its small application scope (generally used in the decoration construction), poor stability, building height is small, has gradually withdraw from the market.
Q:Standard Specification for bowl type scaffold steel pipe diameter
Span and step distance is in accordance with the relevant regulations; the top of the free end is more than the specifications is not greater than 50cm, and free from backwater not greater than 30cm
Q:What kind of scaffolding used in engineering construction
Fastener type steel pipe scaffold for engineering building".
Q:Steel pipe scaffold scaffolding components which are composed of
2.1 divide the material according to the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range