Timber Beam Wall Formwork Used for The Concrete Pouring of Wall

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
10000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Timber Beam Wall Formwork Description 

Timber beam wall formwork is used for the concrete pouring of wall. The application of large areas formwork has greatly increased the construction efficiency and reduced the cost. The system is convenient for construction and it is easy to control the quality. The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used to reinforce the corner.

 

 

2. Main Features of Timber beam wall formworks

-convenient for construction 

-easy to control the quality

-easy, rapid and economical.

 

 

3. Timber beam wall formwork Images

Timber Beam Wall Formwork Used for The Concrete Pouring of Wall

Timber Beam Wall Formwork Used for The Concrete Pouring of Wall

Timber Beam Wall Formwork Used for The Concrete Pouring of Wall

 

 

4. Timber Beam Wall Formwork Specifications

Timber beam column formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.

 

 

5.FAQ of  Timber Beam Wall Formwork

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issues.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

    .Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.

 

 


 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the construction materials, components, fittings and equipment in construction?
Board: cast-in-place slab, prefabricated slab, prefabricated hollow slab, reinforced concrete slab, wood board. The wall, brick wall, concrete wall, roof parapet, wall light. Door: solid wood door, plywood door, steel door. Window: window, wooden window, Aluminum Alloy window, plastic steel window. The building is in addition to other parts of the building and construction of houses built some auxiliary components, such as scaffolding, construction with pipe thread adjuster, building rod, triangle construction support, reinforced joints etc..
Q:How do the welding parts in the welding drawings of the machine parts indicate the technical requirements of the drawings?
The whole circle of the triangle is welded as an angle weld, and the other is the outer circle with the same diameter as the two, so the butt joint is better to open the groove. Welding, for V type welding seam, and, technical requirements are generally, welding firm, no defects, welding smooth grinding, cleaning welding slag splash
Q:China mechanical net
There are mechanical product development and design, mechanical equipment transformation, mechanical equipment maintenance, data inquiries, standard inquiries, mechanical professional translation, mechanical CAD and other mechanical and technical services.
Q:Where are the mechanical pressurization air supply facilities set up?
The purpose of setting up a mechanical pressurization air supply smoke prevention system is to provide evacuation routes and shelters without smoke interference in the event of a fire in the building. Therefore, in the closed door, pressing position, and the fire floor must maintain a certain pressure difference, the position of the air pressure value is a relative positive pressure); at the same time, in the open part of the pressure when the door can have enough air velocity in the opening section, to effectively prevent the intrusion of flue gas, the safety of personnel ensure evacuation and refuge.
Q:Construction Engineering, moving equipment and stationary equipment, respectively
1, moving equipment refers to the rotating device driven by the drive (that is, energy consumption of equipment), such as pumps, compressors, fans, etc., the energy can be electric power, pneumatic power, steam power, etc..
Q:Building materials, equipment, components and fittings products must have "three certificates" is what cards?
Product quality certification, also known as product certification, internationally known as qualified certification. According to the 1991 implementation of the "people's Republic of China Quality Certification Management Regulations", the product quality certification is based on the product standard and relevant technical requirements, the certification institution confirmed by the certification and certification marks to prove that a particular product is in conformity with the relevant standards and technical requirements of the corresponding activities.
Q:Where are the hanging baskets for the building?
It is forbidden to take a stool or put a ladder on a hanging basket to work higher; it is not allowed to work alone in a basket, and no electric machinery or equipment can be placed in the basket;
Q:What are the principles, performances and uses of the commonly used construction machinery equipment?
3. excavator principle: Excavator through the hydraulic pump to the power of the engine to hydraulic motors, hydraulic cylinders and other executive components, to promote the operation of the device, so as to complete all kinds of operations. Performance: new Isuzu engine, euro II emission, international standards, more into power for you, lower fuel consumption; with high torque rotary mechanism, improve the starting torque of rotary and rotary reducing drift; with a new high efficiency, low noise, large displacement of the main pump, provided high efficiency machine to deal with the bad working conditions; and to strengthen the work of device according to the quarry condition, increase its reliability; strengthen the lengthened crawler frame, while reducing the ground pressure, improve the performance of the fault diagnosis system; new, prolong the overhaul cycle, reduce maintenance cost. Use: 1) building and building foundation excavation; (2) mining soil, stripping mining field covering layer; (3) the quarry, tunnel, underground powerhouse and heap loading operation in the field of material; 4) excavation channel, canal and waterway dredging; (5) replacement of the devices can be pouring lifting and installation, piling, rammed earth etc..
Q:The building electrical iron pipe and the pipe line fixing member connected to what is called, what is called the iron pipe and the 86 fixed part of tin
Pipe or direct protection, construction of special operation personnel of construction electrician training materials, focus on the "construction of special operations personnel management regulations", "construction of special operations personnel safety technology assessment program (Trial)", "construction of special operations personnel safety operation skills examination standard (Trial)" and other relevant provisions safety, technical knowledge and skills to master for construction electricians were explained, the book has 10 chapters, including: basic knowledge, common low-voltage electrical appliances and Motor City, power supply and grounding earthing protection system.
Q:How are the machine parts stacked?
Classification ah! Put small pieces of different sizes and functions into boxes and attach labels; larger items can be placed outside in a certain order (for example, function, length, value, etc.)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range