• Timber Beam Formwork with  H20 Timber Beam System 1
  • Timber Beam Formwork with  H20 Timber Beam System 2
  • Timber Beam Formwork with  H20 Timber Beam System 3
  • Timber Beam Formwork with  H20 Timber Beam System 4
  • Timber Beam Formwork with  H20 Timber Beam System 5
Timber Beam Formwork with  H20 Timber Beam

Timber Beam Formwork with H20 Timber Beam

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1000 m²
Supply Capability:
1000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Timber Beam Column Formwork Description 

Timber beam wall formwork is used for the concrete pouring of wall. The application of large areas formwork has greatly increased the construction efficiency and reduced the cost.  The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling.


2. Main Features of Timber beam Column formworks

-well treated to prevent from water penetraton or erosion

-easy, rapid and economical.

-service life maximally extended

3. Timber beam Column formwork Images

 

4. Timber Beam Column Formwork Specifications

Timber beam column formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.


5.FAQ of  Timber Beam Column Formwork

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        


2) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  


 3) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 1-2weeks.


Q:Case Study of Aluminum Alloy Formwork
Aluminum alloy template lighter than the steel template, the use of fast assembly and disassembly system, moving components, lightweight and flexible, greatly reducing the amount of artificial, easy construction management. Aluminum alloy template is one of the most advanced templates, the construction company image is good. Design advanced early demolition system, to speed up the construction progress.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords