Tie rod for Scaffolding and Formwork System

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of Tie rod Description 

Tie rod is a important accessories of scaffolding system. It will greatly reduce the cost because of the following advantages.


2.Main Features of Tie rod

 It will greatly reduce the cost because of the following advantages

1)Extremely tight

2)Easy to install

3)It can be used again and again for nearly 20years

 

3. Tie rod product pictures:

   Tie rod for Scaffolding and Formwork System


 4.Tie rod Product Description

1) Size:15/17

2Length: 6m
3
Inner dia: 15mm
4
Outer dia: 17mm

5terial: Q235 or 45# steel

6Surface: galvanized or natural colour

7Size: dia. 15/17mm or 20/22mm

8Tensile strength: more than 110KN

9Colour: natural, white, yellow

10Quality level: high quality

11Supply ability: 800tons per month

12Customized: available


 5.FAQ 

 We have organized several common questions for our clients,may help you sincerely:

1)How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:scaffold pierving help please=] ???!!?
Several people have told me it hurts about the same. I do not have one, sorry couldn't be more help than that.
Q:I need to set up scaffolding on a tiled floor to reach some lights 28 ft high?
Put the wheels (locked) on 2 x 12 planks. This will distribute the weight.
Q:How to calculate the fastener type steel pipe scaffold
1.1.2 provides for the temporary structure of the scaffolding structure, the structure of the importance coefficient of gamma 0 take 0.9. ?The scaffold structure design of 1.1.3 on reliability requirements, considering that there is no enough statistical data accumulated by the situation, determine the probability limit state design, should be consistent with our historical experience, if using a single coefficient method was designed, the single safety coefficient should be satisfied: the strength calculation of K1 = 1.5 the stability calculation; K2 = 2. To this end, in the calculation of the introduction of the material strength of the additional coefficient of gamma 'm' or resistance to the addition of partial coefficient gamma 'R, gamma' R= gamma 0 gamma 'm=0.9 gamma' m.
Q:How to remove the disc scaffolding ah, do not know how to get through the decoration
Third, remove the disc scaffolding accessories should pay attention to remind the construction personnel, in the construction site to fasten safety rope, take good safety helmet, wear good shoes. Don't dress because the weather is hot. Some of the equipment used to go to the mall to see where the extension is more complete.
Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
1, steel pipe:(1) the steel pipe shall have the product quality certificate and inspection report with the outer diameter of 48mm and the thickness of 3.5mm of the steel pipe welded to the steel pipe of 3. Rust must be replaced, not to be used to build the frame.(2) the surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep drawing.(3) anti rust paint for steel pipe. Vertical rod and bar brush yellow rust proof paint, scissors and handrails with red and white tube brush. The maximum quality of each steel pipe shall not be greater than 25Kg. Steel pipe is strictly prohibited.
Q:Introduction of external scaffolding
Temporary structure frame for feeding, piling and construction work outside the outer wall of the outer wall for building construction. 1.1 parts1.1.1 pipe1 scaffolding steel pipe with Phi 48mm, wall thickness of 3.5mm; horizontal horizontal bar maximum length of 2200mm, the maximum length of other rods 6500mm, and the maximum quality of each steel pipe should not be greater than 25kg.
Q:How many meters per square meter and the number of steel fasteners
According to the height of their own construction plans, according to the construction area of 1 square root, fasteners ranging from docking fasteners and rotating fasteners, rotating fasteners should be every square of the 3 bar, a detailed look at the old construction workers
Q:Seeking for the safe construction scheme of mobile scaffolding!
All kinds of scaffolding engineering construction programGeneral requirements for 5.2.1 scaffolding settings and use general requirements for scaffold framing and setting requirementsThe design of the frame of the scaffold shall take full account of the requirements for the use of the project, the various conditions and factors for its implementation, and shall comply with the following requirements:Frame dimensions
Q:Does a scaffolding piercing hurt?
You sound like you have a low tolerance for pain if you say you're a wimp haha, which means yeah it'll probably hurt you. It'll hurt more than the lobes because it's cartilage, and for the same reason you'll hear a popping noise as the hole is made. You won't be taken over by deathly pain or anything like that, it'll probably be sensitive for a few days after too so careful not to knock it against anyone/ anything. But if you want it bad enough, the pain will be bearable.
Q:Specification and type of scaffold erection
technical requirementThe materials used for steel pipe scaffold shall meet the following requirements:1 steel pipe diameter should be 48 ~ 51mm, wall thickness of ~ 3.5mm, length of 2.1 ~ 2.8m and 4 ~ 6.5m is appropriate, there are serious corrosion, bending, cracks, damage shall not be used.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range