• THREE PHASE ELECTRONIC PREPAYMENT ENERGY METER System 1
  • THREE PHASE ELECTRONIC PREPAYMENT ENERGY METER System 2
THREE PHASE ELECTRONIC PREPAYMENT ENERGY METER

THREE PHASE ELECTRONIC PREPAYMENT ENERGY METER

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
10000 pc/month
Option:
DTSY866

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Item specifice

Meter:
Energy Meter

1.Application

Prepayment meter also called quantitative meter, IC card prepaid meter, in addition the ordinary energy meter measurement functions, especially the user need to buy electricity FIRST, USE second,after run out of power if the user does not continue to buy electricity,the meter will automatically cut off,this meter is best way to solve payment collection problem, it also has function of anti-tampering,over load protection, management of energy consumptionand user information.It is used to measure 50Hz or 60Hz active energy consumption from single phase AC Electricity net and adopts LSI (Large-scale Integration) and SMT manufacturing technique, the key componentsand part all adoptslong life type. This type of meter is widely used in office building, shopping mall, residential, and public facility etc.

2. Functions and Features

♦Meter base in made by ABS anti-flaming, with transparent PC window, Meter terminal block is high 

temperature resistance material which is also moisture-resistant, fire-retardant.

♦Highly reliable special design for IC card entrance, which can bearing attack of 4kV static electricity

shock.

♦Cyclometer & 6+2 digits LED double display.

♦One meter has one card, repeatable top-up, Effectively reduce waste.

♦Once the prepaid meter available energy is reached zero, meter relay will automatically cut the power 

off, unless the station has set overdraw limit ( Credit ).

♦The meter can set alarming kWh quantity, indicated by LED flash and secondary notice user the 

energy is staying Low, it’s in order to remind user to recharge power on time, Avoid unnecessary loss.

♦Load control, over-load automatically switch off, protect product been damaged.

♦Data-copying function makes the electricity department easily to manage, data can be preserved for

 more than 10 years without power supply.

♦Large-capacity magnetic latching relay control, measure energy in security mode.

♦Single direction measures single phase two wire active power consumption, comply with international 

standard IEC62053-21,IEC62052-11.

♦Directly connect operation maximum 100A or through CT

♦Electricity price settable, easy to manage and adjustment.

♦RS485  communication module include, it's convenient to meter-reading.

3. Technical Parameters

Accuracy class

Class 1.0 

Rated voltage

220/230/240V;   110V(optional)

Rated current(A)

1.5(6), 5(20), 10(40),15(60), 20(80), 30(100)

Rated frequency

50Hz or 60Hz

Operation voltage range

Un±20%

Starting current

0.4%Ib

Power Consumption

Voltage circuit ≤1W 10VA; Current circuit ≤1VA

Max   .operation temperature

-20°C ~ +70°C 

Relative Humidity

≤85%

4. Outer and Mount Dimension

THREE PHASE ELECTRONIC PREPAYMENT ENERGY METER

THREE PHASE ELECTRONIC PREPAYMENT ENERGY METER

5.Product Pictures

THREE PHASE ELECTRONIC PREPAYMENT ENERGY METER

THREE PHASE ELECTRONIC PREPAYMENT ENERGY METER

THREE PHASE ELECTRONIC PREPAYMENT ENERGY METER

6.FAQ

1. How do you pack your products?

We have rich experience on how to pack the panels to make sure the safety on shipment when it arrives at the destination.

2.  Can you do OEM for us?

Yes, we can. 

3. How long can we receive the product after purchase?

In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The perfect time of receiving is related to the state and position of customers. Commonly 7 to 10 working days can be served.

Q:I payed the bill and put in the shutoff notice for the 18th, not the 16th! Jesus Christ! I still have shite I have to move!
Look at the money you're saving. 0_o
Q:I know that B is flammable liquid and C is electrical equipment. thanks.
Solid combustibles, like wood and paper.
Q:1. diode2. converter3. transformer 4. mercury-arc rectifierpl provide with explanation
obviously (3) transformer All the others allow current in only one direction. And i assume the converter is an AC to DC converter.
Q:I was wondering, if everyone on earth was to disappear and there was no one to work the electrical grid, how long would it take for 1] The electrical power lines themselves to decay?2] The electrical substations to break down?3] The transformer units to break down?4] Any other electrical equipment to break [such as those boxes on the power lines, as well as ANY other piece of equipment on the electric grid]?P.S- Don't give how long it would take for the power stations to stop running, I already know that. Just answer the four questions I asked.
The lines are mostly copper or aluminum for the wires themselves. The towers are steel. They would last for decades easily. But lines that run from transformers to homes or neighborhoods could fail earlier. Look at what happens with ice storms in New England. Substations and transformers would last quite long also. But the power stations would last for anywhere from hours to weeks, depending on the degree of automation, and on chance. .
Q:i have a situation with my computer i don't know what it is but i have done a lot of test so please help me identifying this and how to solve it My build: CPU: i7 5820k MOBO: x99 g1 gaming 5pPSU: seasonic m12 750wGFX: g1 gaming gtx 980 ti
Using water pipes as temporary grounding solution is not bad. But. You or someone must solve the grounding issue in your house or apartment properly. The next time you have thunder storms or similar disturbances, your electrical equipments and electronics at home might be broken, one after another. You have quite a big problem there, do not under estimate it!.
Q:I paid taxes and homeowners fees for 15 years. There are no buildings on the land. Also had to pay for an electrical hookup, although no electrical equipment was installed.
This appears to be a building lot that you purchased for personal use and then never built. You did not rent this land. Your basis of the land is your purchase price plus the cost of the electrical hookup. There may be other items that could be added to the basis, you may consult a local tax preparer and provide more details. You report the sale on Schedule D, providing the date of acquisition, date of sale, sales price (less sales commissions), and your basis. Your gain is the difference of the sales price and your basis. It will be taxed as long-term capital gains. The maximum tax rate on your gain will be 15%. The taxes you paid could have been deducted as real estate taxes on Schedule A. The homeowner's fees are not deductible.
Q:I cut a deal with my electrical shop teacher. If i tell him how we can relate an electrical class to ski lifts and snowmaking and learn about how they work and the electrical portion of them then hell take my shop to our local mountain Wachusett. Can anyone tell me how ski lifts and snowmaking equipment work and how i can relate it to electrical
Your electric drive motors run on high voltage. Three phase 480v. All of your controls and safety systems run on low voltage. Battery powered, 24 or 48 volt. This is so that the lift can operate properly in the event of a power outage that cuts power to the drive. Lifts have backup drives, usually a diesel generator that can supply power to the electric drive motor, or an actual gas or diesel motor that can be coupled to the gearbox and drive the lift itself. Controls are usually a programmable logic control that monitor proper operation of different components of the lift and through a series of relays send power to the drive. Snowmaking is as aforementioned powered by large electric pumps and air compressors. Air and water are pumped usually from a central location and piped around the mountain to hydrants. Here, the snow guns are connected to the air and water. Some types of guns simply blow the water and air to make snow, while some have motors on them. These plug in to electrical pedestals, high voltage, that are located at the hydrant locations. These power large fans that help disperse the water and also control oscillating guns.
Q:I drive an 06 Pontiac G6 GTP(90,000 miles). Recently the check engine light lit up. So I took it to autozone for the computer scan and they gave me the OBD code P0449.My car currently seems to be running fine.Next, they gave me a list of the possible malfunctions with my car. 1. purge or vent solenoid defective- I have no idea what that is. 2. check connector and wiring- all the electrical equipment is working fine, so i doubt this is it. 3. Fuel saturated vapor canister- no idea what this is. And finally, 4. Failed EVAP vent solenoid-again, no idea what this is. If you know anything about this ,please help me, im worried, thanks.
Since Wonder works as a part-time mechanic and also as a psychic hotline operator, I know exactly what the problem is. But first you'll have to call me at 1-900-WONDER-KNOWS-THE-FUTURE.** **$4.99 per minute, but the first 30 seconds are free. You must be 18 years or older to call. Not open to residents of Hackensack, NJ or those with a foot fetsh. You must not be an animal hoarder or a surfing instructor, and you must contact your doctor prior to calling this number. Those with a heart condition or who use Viagra will be given a preference. Operators are standing by.
Q:whats the correct procedure if you found a piece of faulty electrical equipment?
Both the previous contributors have given good advice. I think they are good enough. You can make lot of noise, but be careful nobody should get annoyed.
Q:Hi, i have one question i'm would like to sell my computer (tower) on OKorder but i don't know the value of my system, it was a gift from my sister about a year ago. Here is my system specs:Black gaming case with red neon light insideAmd x2 3800+ 2.0ghz.2GB of Ram ddr2 667mhz.Asus m2n-e motherboard.Visiontek Hd 2600 pro 512MB ddr2 supports direct x10.Western Digital 160 GB sata hard drive with Vista ultimate.Pci firewire card 2 ports.Any Help will be appreciatedthanks.
Yeah, I would be surprised to see it sell for more than 400 on OKorder.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords