The highest quality wheel loader CLG820C

Ref Price:
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

SPEC

EngineYituo
Gross Power65 kW (87 hp) @ 2,400 rpm
Net Power60 kW (80 hp) @ 2,400 rpm
Operating Weight6,400 kg
Standard Bucket Size1.2 m3
Standard Breakout Force56 kN
Standard Dump Clearance2,856 mm

 FEATURES

 

Operator Comfort and Safety

 

  • Adjustable seat, and ergonomically designed placement of instruments.


  • Comfortable A/C and heated operator environment.Two mechanical lever controls.


  • Optional pilot control.Convenient detachable cab.


  • UV resistance glass. Cigarette lighter works as electrical outlet.

     

Easy to Maintain

 

  • Power cut-off function prevents damage to drive components.


  • Double sealed O-rings used in Hydraulic system.


  • Stress analysis tested to strengthen weak points.


  • Sub frame and rear axle swingable by 11 degrees .


  • Front frame box structure highly torsion and damage resistant.


  • Parts, Attachments and Service to count on.  


  • World class suppliers of key components.


  • Long life high performance multi valve from  Zhejiang Linhai.


  • Long life highly efficient Shantui transmission and converter used.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the five major cost components of the project cost?
Material cost means the amortization of the raw material, structural parts and semi-finished products, auxiliary materials, and turnover materials and the rental costs of the raw materials, components, fittings and semi-finished products, auxiliary materials, which are included in the budget. Mechanical use fees refer to the contents of the quota included in the budget, the mechanical use fees incurred in the construction process and the rental fees of the construction machinery leased by the outside units, and the fees for installation, disassembly and entry and exit
Q:Cost of construction machinery use fee
Because labor costs, material costs, construction machinery use fee called "basic direct fee", plus "other direct costs" is the direct costs of the project, for example: "the basic direct fee is 1 million yuan, other direct costs" rate of 6%, then the "other direct costs" amount is 60 thousand yuan, direct project fee is equal to 1 million 60 thousand yuan. (similar to this name is in the professional quota appears, water conservancy quota, highway quota is so called name; general construction, especially civil engineering are in accordance with your statement)
Q:does plant machinery have an owners title?
I am not aware of a title for this type equipment. Normally you keep a copy of the machines serial numbers and bill of sale.
Q:How is large building service machinery installed in a new building?
Large entrance is best. Long ago setting equipment then constructing the walls was a common practice. When the original machines need to be replaced it is a problem.
Q:if you are not moving in outer space, is it possible to move without the aid of machinery?
All you would need to do is throw some matter in one direction, and you would move in the opposite direction.
Q:What is some basic software and machinery that I should look into using for mixing music and making beats?
Hello, check out some articles in Sound On Sound, Electronic Musician etc, they review software and and have a lot of information you could use. Some popular programs are Pro Tools, Logic, Reaper, and Digital Performer. Since you will be programming mostly for house, Logic could give you the best band for your buck. It comes with plenty of virtual instruments and has some good plug-ins and all the normal recording and mixing capabilities. Reaper is extremely affordable and also very powerful. If you are a student, check for a student discount for Logic, it can be a really good price. Besides the software, get yourself some decent studio monitors. Then just keep on researching and experimenting, learn the software and what each effect does etc. Good luck!
Q:Why is farm machinery so weird looking?
I was a farmer, not now. I tried for many such things long ago in the past but my father didn't allow me due to some facts and circumstances around where we were. I don't know about other places, but may be reasons like wise.
Q:Whats the biggest piece machinery you ever drove?
7 tonne forklift 10 tonne crane hugs xxxx
Q:required a used uht milk processing machinery with packing machinery?
Go on OKorder.. they sell everything!!!
Q:i want to buy pendrive making machinery..manufacturing.. not assembling....?
You want to buy a chip fab? How many millions/billions do you have?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range